APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed 150 KLPD Molasses/Grain based Distillery along with 7.0 MW Co-generation power plant within existing non-operational Distillery Plant at Village Satrod Khas, Tehsil & District Hisar, Haryana by Associated Distilleries (A Unit of Globus Spirits Limited) | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/HR/IND2/92430/2019 | Project Cost | 12500 lacs | |
| 2. | |
S. No. in the schedule | 5(g) Distilleries
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 150 KLPD Molasses/Grain Based Distillery & 7.0 MW Co-generation Power Plant ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 8 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Village Satrod Khas, Tehsil & District Hisar, Haryana | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 5, 6, 7/1, 4/2, 3/2, 15/1, 23/2, 24/1, 24/2, 25, 165, 17, 18/1, 19/1, 15, 14, 13, 12/2 | Town / Village | Satrod Khas | State of the project | Haryana | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Haryana | Hisar | Hisar | | 10. | |
Nearest railway station along with distance in kms | Hisar, 7 km | Nearest airport along with distance in kms | New Delhi, 142 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Hisar , 4.5 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Municipal Corporation, Hisar
Mrs. Saroj Bala W/O Papu Saini,
Village Satrod Khas, District Hisar (Haryana)
Mob. no +919812986429 | | 13. | Name of the Applicant | M | | 14. | Registered Address | F-0, Ground Floor,The Mira Corporate Suites,
Plot No. 1 & 2, Ishwar Nagar, Mathura Road,
New Delhi | | 15. | |
Address for correspondance: | Name of the Company | GLOBUS SPIRITS LIMITED | Name of the Applicant | M | Designation (Owner/ Partner/ CEO) | Executive Director | Pin code | 110065 | E-mail | mld@globusgroup.in | Telephone No. | 011-66424600 | Fax No. | 011-66424629 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The proposed installation will be carried out within the existing plant premises (8.0 hectares) and the site is already used for industrial purpose. The total project area is 8.0 hectares.
Greenbelt has been developed on approximate 2.64 ha of total plot area covering the Plant boundary, sides of roads and around administrative building. This area will be maintained and will act as an effective pollution mitigating measure. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Clearance of old non- operational distillery plant will be undertaken to install the proposed distillery & co- generation power plant. No clearance of existing land or vegetation is required as the proposed installation will be done within existing non-operational Distillery Plant. | 1.3 | Creation of new land uses? | No | Existing land use of the area is industrial. Since proposed project will be done within the existing plant premises, there will be no creation of new land uses outside plant area. Only intensity of the existing land use will increase. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Pre-construction investigations have already been carried out. Thus it is not required for proposed project. | 1.5 | Construction works? | Yes | There will be construction work for the installation of proposed plant and storage facilities for raw material and finished product. | 1.6 | Demolition works? | Yes | Demolition works will be required to scrap the old non- operational distillery and thereafter new infrastructure will be installed. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | During construction work, local people will be hired from the nearby areas; therefore, no housing facilities will be developed. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | There will be excavation, cut and fill during the process of construction / erection of proposed project. | 1.9 | Underground works including mining or tunnelling? | No | No underground works including mining or tunneling is required. | 1.10 | Reclamation works? | No | No reclamation work is required. | 1.11 | Dredging? | No | No dredging is involved. | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Molasses Based Distillery process:
• Molasses Storage
• Yeast Propagation
• Fermentation
• Multi Pressure Distillation
• Multi Effect Evaporation
• Incineration Boiler
• Alcohol Receiver &storage
Grain Based Distillery Process:
• Grain storage & cleaning, milling and flour handling
• Slurry preparation & liquefaction
• Fermentation
• Multi Pressure Distillation
• Decanters & Dryer
• Multi-Effect Evaporator
• Alcohol Receiver &storage
Manufacturing process details are describe | 1.14 | Facilities for storage of goods or materials? | Yes | Materials required for process will be stored in tanks, storage godowns & silos. Finished product (Ethanol/ENA/RS) will be collected in respective daily receivers and then transferred to bulk storage tanks. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid Waste
• Fly ash will be given to brick manufacturers/as per CPCB guidelines.
Liquid effluent
• Grain based operation - Spent Wash will be taken through Centrifuge Decanters for separation of Suspended Solids separated as Wet Cake & will then be treated in Multi Effect Evaporator followed by dryer.
• Molasses based operation - The spent wash from molasses will be sent to MEE for concentration and the concentrated spent wash will be mixed with fuel and will be burnt in the incineration b | 1.16 | Facilities for long term housing of operational workers? | No | No long term housing facilities will be provided to the operational workers as they will come from nearby areas. | 1.17 | New road, rail or sea traffic during construction or operation? | No | The existing facilities are adequate. No additional facilities are required and further internal roads will be connected. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | No new infrastructure will be required for proposed project; existing facilities will be enough to sustain further installation. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable, as no closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements is envisaged. | 1.20 | New or diverted transmission lines or pipelines? | No | No new or diverted transmission lines or pipelines are there. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | There will be no impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers. | 1.22 | Stream crossings? | No | No stream crossing the site. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Total fresh water requirement for the project will be 1370 KLPD (Distillery 1350 KLPD + Bottling Plant 15 KLPD + Domestic 5 KLPD) which will be sourced from Surface water (Canal water) or Ground Water. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There will be no change in the water bodies or the land surface affecting drainage or run-off. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Local people will be employed for construction purpose; no transportation facility will be required for them.
The transport arrangements for operational workers will be provided for coming from nearby villages / towns from where they can commute to and fro for work.
There will be transportation of material and machinery during construction phase by road.
During operational phase, transportation of raw materials and finish product will be done by road. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No long term dismantling/ decommissioning is proposed. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | No such impact envisaged. | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The employment provided will be 300 people (Regular Basis - 100 & Contract Basis - 200). Preference will be given to the locally available people. Employment in skilled category will be done from outside if it is not available in local areas. | 1.29 | Introduction of alien species? | No | All the plant species grown in the project area are indigenous to the area; same will be continued so introduction of alien species is not envisaged. | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species or genetic diversity has been reported so far. | 1.31 | Any other actions? | No | No other action will be undertaken except the above mentioned. | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Total area required for the proposed project is 8.0 hectares (19.77 acres).
No additional land will be required for proposed installation as the same will be undertaken within existing plant premises of non- operational distillery plant. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total fresh water requirement for the project will be 1370 KLPD (Distillery 1350 KLPD + Bottling Plant 15 KLPD + Domestic 5 KLPD) which will be sourced from Surface water (Canal water) or Ground Water. | 2.3 | Minerals (MT) | Yes | Coal will be used as fuel in the co-generation power plant. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material as available locally such as sand, reinforcement steel, structural steel, cement, metal etc. will be used for construction purpose. The quantification of the materials will be done during detailed engineering stage. | 2.5 | Forests and timber (source – MT) | No | No Forests and timber is required. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The total power required will be 4.5 MW.
Source: 7.0 MW Co-generation Power Plant
Surplus power will be exported to Grid.
Fuel: Concentrated Spent wash and Bio-mass or Coal | 2.7 | Any other natural resources (use appropriate standard units) | No | No other natural resource will be involved in the proposed project except the above mentioned. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | The hazardous chemicals used in the plant will be caustic soda (sodium hydroxide) & sulphuric acid. They will be provided with proper storage facilities as per MSIHC rules to avoid any harm to environment or human health. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | No effect is envisaged. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | There will be positive impact of the project in the area as mentioned below:
• Employment opportunities, both direct and indirect will generate, thus improving the economic status of the villagers.
• Communication and transport facilities will be improved.
• Education facilities will be improved.
• Community health care programmers provide better health and medical facilities not only to the employees but also to the villagers.
• Cultural & sports activities and improvement of social welfa | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No effect is envisaged due to this project. | 3.5 | Any other causes | No | No, other causes are involved except the above mentioned. | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | There will be no spoil, overburden or mine wastes. However, the spoil generated during construction will be reused for filling. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal solid waste generated from plant canteen and guest house will be collected, segregated and disposed off scientifically.
Domestic waste water generated from the plant will be treated in STP. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | A small quantity of used oil and grease will be generated from plant machinery / gear box and D.G. set as hazardous waste which will be sold out to the CPCB authorized recycler. | 4.4 | Other industrial process wastes | Yes | Fly ash generated from boiler will be given to brick manufacturer. No other industrial process waste will be generated except the already mentioned details. | 4.5 | Surplus product | Yes | Surplus power will be exported to Grid. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | STP sludge will be dewatered in filter press and used as manure. | 4.7 | Construction or demolition wastes | Yes | Construction waste like soil, brick bats, etc. will be utilized in leveling of land and construction of roads. Demolition wastes will be generated while scrapping the old plant. | 4.8 | Redundant machinery or equipment | Yes | The redundant machinery & equipment of old non-operational distillery will be scrapped. | 4.9 | Contaminated soils or other materials | No | There will not be any contaminated soils or other materials. | 4.10 | Agricultural wastes | No | There will not be any agricultural wastes. | 4.11 | Other solid wastes | Yes | No other solid waste will be generated except below mentioned:-
The spent wash from molasses based operation will be sent to MEE for concentration and the concentrated spent wash will be mixed with fuel and will be burnt in the incineration boiler to achieve ZLD.
The Solids waste from the Grain based operations (spent wash) generally comprises the fibers and proteins along with moisture in Wet Cake, ideal as Cattle Feed. The Yeast sludge is added to the Wet Cake. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Gaseous emission from fuel burning in boiler, which consists of common pollutants like SO2, NO2 and PM, would be discharged into atmosphere through stacks of suitable height. ESP will be installed to maintain the emission levels within prescribed standards. | 5.2 | Emissions from production processes | Yes | CO2 generated during fermentation process will be collected, purified, liquefied and sold to vendors. | 5.3 | Emissions from materials handling including storage or transport | Yes | Fugitive dust emissions occur due to transportation activity, vehicular movements and material handling activities. Proper mitigation measures will also be adopted for the project. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Fugitive dust emissions occur due to construction activities and vehicular movement. The fugitive dust emissions during construction will be temporary and will be minimized by regular water sprinkling on the roads and other dust generating areas. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | During loading & unloading of raw material dust is likely to be generated during construction phase. Water will be sprinkled and covered sheds will be provided for construction materials to reduce dust emission.
Odour problems will be properly controlled at source by good operational practices, including physical and management control measures. | 5.6 | Emissions from incineration of waste | Yes | During Molasses based operation - The spent wash will be concentrated in MEE and the concentrated spent wash will be mixed with Bio mass or Coal and burnt in the incineration boiler.
The emissions will be almost negligible.
High efficiency ESP will be installed with adequate stack height to maintain the emission levels within prescribed standards. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | There will be no burning of waste in open air. | 5.8 | Emissions from any other sources | No | There will be no emissions from any other sources. | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise from operation of equipment will be kept below the prescribed limit by CPCB.
Noise abatement measures will be taken and persons working just close to machines and machine operators will be provided with personal protective equipment viz. ear plugs/ear defenders etc. for further protection. | 6.2 | From industrial or similar processes | Yes | Noise will be generated due to the running of the machinery. Proper mitigation measures will be taken for the reduction of noise levels viz. acoustic enclosures etc. The workers will be provided with personal protective equipment. | 6.3 | From construction or demolition | Yes | Noise generated during construction activities will be maintained within the prescribed noise standards.
No demolition activity will be done. | 6.4 | From blasting or piling | No | Not Applicable | 6.5 | From construction or operational traffic | Yes | There will be some noise due to movement of machine/vehicle but the same will be maintained within the prescribed limit. | 6.6 | From lighting or cooling systems | No | No noise will be generated from lighting or cooling systems | 6.7 | From any other sources | No | Not applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The hazardous materials will be stored in a proper storage facility designed with protective measures to avoid any risk of contamination to the land or to the human through leakage or spillages. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The distillery will be based on the concept of “Zero Effluent Discharge” hence no sewage or other effluent will be discharged outside the plant premises. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | There is likely hood of increase of air emissions. But proper mitigating measures such as regular dust suppression by sprinkling water will help in reducing the effect. However, periodical monitoring will be done and results will be analyzed. In case any change shows adverse effects, it will be attended for improvements. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | There will be no long-term build-up of pollutants in the environment, however periodic monitoring will be done for the air, water and soil in the plant premises and surroundings, so that timely mitigation measures can be undertaken. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | The hazardous materials are being/will be stored in a proper storage facility designed with protective measures to avoid risks due to spillages and leakages. Proper handling and storage practices will eliminate risk of accidents. However; in an emergency, fire-fighting equipment have been/will be provided near all risk prone areas. Workers have been/will be properly trained to use fire-fighting system to quench the fire at source itself. | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | No such case has been reported in the area and chances are minimal. However, we will be having Emergency and Contingency plans in place. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Proposed project will result in considerable growth of the surrounding areas by increased direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure.
Greenery of the surrounding area will be developed which will further add on to the area aesthetically.
Due to upcoming project, several local house construction and commercial construction may get accelerated, which will contribute towards raising socio-economic status and standard | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable. | 9.3 | Set a precedent for later developments | Yes | A better after use scenario which is likely to increase aesthetic beauty of area and greenery would set precedence for subsequent entrepreneurs who venture such projects. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Detailed study will be carried out to check for cumulative effects due to proximity to other existing projects. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | • Bir Hisar PF (~ 5.0 km in NW direction)
• Balsamand Sub Branch (Bhakra Canal) (Adjacent in East direction)
• Hisar Major Distributary (Western Yamuna Canal) (Adjacent in North direction)
• Dewa Distributary (~ 1.5 km in South direction)
• Petwar Distributary (~ 4.0 km in South direction)
Few minor agricultural canals are also present in 10 km radius area | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not applicable | 4 | Inland, coastal, marine or underground waters | No | Not applicable | 5 | State, National boundaries | No | Not applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | • NH 10 (Adjacent in SW direction)
• NH 65 (~ 7.2 km in West direction) | 7 | Defence installations | Yes | Hisar Cantonment (~ 1 km in SE direction) | 8 | Densely populated or built-up area | Yes | Hisar (~ 4.5 km in West direction) | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | There are schools, Colleges, Hospitals, Markets, Railway station, places of worship within 15 km radius of the plant site. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | No environmental damage reported from the area so far. All parameters of Air, Water and Soil etc. will be maintained within permissible limits with proper mitigation measures. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The project site falls in Seismic Zone II: Low Damage Risk Zone (MSK VI or less) as per IS: 1893 (Part-I): 2002. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | M | Designation | Executive Director | Name of Company (Applicant Name should not be given here) | GLOBUS SPIRITS LIMITED | Address | F-0, Ground Floor,The Mira Corporate Suites,
Plot No. 1 & 2, Ishwar Nagar, Mathura Road,
New Delhi |
| |
|