APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Greenfield Manufacturing unit of Herbal extracts, Active pharmaceutical ingredient, Biomolecules and Natural Food Colours at Plot-03, Sector-18, phase-3, Industrial Estate Barhi, District - Sonipat, Tehsil –Gannaur, State – Haryana
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/HR/IND2/81580/2018
Project Cost 25 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled production capacity of 26.6 MT/annum & Extraction capacity of 561.5 MT/annum ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0.405 ha.
6. Category of project i.e. 'A' or 'B' B
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectIndustrial Estate Barhi, Plot-03, Sector-18, phase-3, District - Sonipat, Tehsil –Ganaur, State – Haryana
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot-03, Sector-18, phase-3, Industrial Estate Barhi, District - Sonipat, Tehsil –Gannaur, State – Haryana
Town / VillageBarhi
State of the projectHaryana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)HaryanaSonipatGanaur
10.
Nearest railway station along with distance in kms Ganaur railway station, 3.1 km
Nearest airport along with distance in kms International Airport, New Delhi (IGI), 60.5 km
11. Nearest Town/City/District Headquarters along with distance in kms Barhi , 1 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Municipal Corporation, Sonepat Near Railway Station, Railway Road Sonepat Contact No.: 0130-2260100, 0130-2242996 (Fax) Email: secymc.sonepat@hry.nic.in
13. Name of the Applicant Vineet
14. Registered Address 405, Krishna Apra Buisness Square Netaji Subhash Place, Pritampura, New Delhi
15.
Address for correspondance:
Name of the Company CENNET BIOPHARMA PVT LTD
Name of the Applicant Vineet
Designation (Owner/ Partner/ CEO) Director
Pin code 131101
E-mail biopharma.cennet@gmail.com
Telephone No. 0124-4291036
Fax No. 0124-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The land is industrial & issued by HSIIDC for the development of industry
1.2 Clearance of existing land, vegetation and buildings? No The land is under the possession of proponent and there would not be any clearance of land, vegetation, and buildings
1.3 Creation of new land uses? No The land is industrial & issued by HSIIDC for the development of industry
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geophysical investigation, including In­situ testing, for the characterization of surface and sub­surface soil properties
1.5 Construction works? Yes Construction/erection work to be taken up after getting environmental clearance.
1.6 Demolition works? No Not applicable as this is a greenfield project
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary sites would be constructed for the housing of construction workers as they will be hired locally
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes As per approves drawing
1.9 Underground works including mining or tunnelling? No No mining/tunnelling is involved.
1.10 Reclamation works? No Not required
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Production and Manufacturing process The details of production and manufacturing process are incorporated in the Prefeasibility report
1.14 Facilities for storage of goods or materials? Yes Adequate storage facilities for raw material and finished product will be provided within the proposed project site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes ETP of capacity 40 KLD will be installed to treat the industrial effluent, reject water of RO plant & blow down. Domestic sewage generated shall be disposed through industrial sewer line provided by HSIIDC Quantity of ash from the boiler will be 20-25 kg/day Domestic solid waste approx. 4-5 kg/day & industrial solid waste approx. 4-5 kg/day of will be given to the approved recycler ETP sludge of approx. 4-5 kg/day will be send to will be send to TSDF
1.16 Facilities for long term housing of operational workers? No Not envisaged
1.17 New road, rail or sea traffic during construction or operation? No No new road & rail network construction envisaged as the proposed project will be established on the well-developed industrial area of Sonepat which has all the required facility.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing facilities shall be utilised
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes Fresh Water Requirement for the proposed project will be approx. 42 KLD. Source: Ground water will be used at the project site through Tube well. Ground water permission will be obtained before start of production & same has been applied to CGWA.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During construction phase approx 20 persons will be required The raw materials will be sourced from local market. They will be transported to the site by road through trucks. The manpower requirement will be around 75 during operation phase. The number of working days for the proposed project will be 300 days per annum. decommissioning not applicable
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling or decommissioning or restoration works as it is new unit
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? No During construction phase approx. 20personswill be required. Local people will be sourced from the nearby areas & during operation phase approx 75 persons will be required
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land is industrial & issued by HSIIDC for the development of industry
2.2 Water (expected source & competing users) unit: KLD Yes Fresh Water Requirement for the proposed project will be approx. 42 KLD. Source: Ground water will be used at the project site through Tube well. Ground water permission will be obtained before start of production & same has been applied to CGWA.
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material (stone, aggregates, and/soil) required for the construction
2.5 Forests and timber (source – MT) No Not Applicable.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power requirement for the proposed project will be 0.25 MW (approx. 360 KVA) Source: The power will be supplied from UHBVN (Utter Haryana BijliVitran Nigam) The steam requirement for the proposed project will be 2 tons
2.7 Any other natural resources (use appropriate standard units) No Not Applicable.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Solvents such as Methanol, Ethanol, Butanol, toluene, Hexane, Chloroform, acetone, acetonitrile, iso propyl ether, iso propyl alcohol, Ethyl acetate, MDC & other chemicals shall be used for the manufacturing process. However the solvent recovery system is proposed with the project to reduce the solvent requirement
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Project activities are not likely to cause changes in the occurrence of disease or affect disease vectors as proper consideration shall be taken care
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Employment opportunities will be created by operation of the plant. This will be benefited by direct and indirect employment which would improve the living conditions of the people and also through socio economic measures taken up by the proponent.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged.
3.5 Any other causes No Not applicable.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No mine or separation activity.
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal solid waste will be generated from the proposed project which will be disposed off with the solid waste approved contractors
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used Oil from DG set, spent solvent and spent catalyst will be sold to the authorized recyclers as per HSPCB ETP sludge will be sent to TSDF site
4.4 Other industrial process wastes No
4.5 Surplus product No nil
4.6 Sewage sludge or other sludge from effluent treatment Yes ETP sludge will be sent to TSDF site
4.7 Construction or demolition wastes Yes Construction waste like soil, brick bats, etc. will be utilized in levelling of land and construction of roads.
4.8 Redundant machinery or equipment No There will not be any redundant machinery or equipment.
4.9 Contaminated soils or other materials No There will not be any redundant machinery or equipment.
4.10 Agricultural wastes No No agricultural wastes will be generated.
4.11 Other solid wastes No Not envisaged
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emission is likely to be generated from the DG set of capacity 315 KVA. Which will be the used as power backup
5.2 Emissions from production processes Yes Emissions from production processes in terms of pollutants like VOC are likely to be generated which will be passed through the wet scrubber
5.3 Emissions from materials handling including storage or transport No Not Applicable as proper cake will be taken during materials handling including storage or transport
5.4 Emissions from construction activities including plant and equipment Yes Dust suppression during construction will be done by water sprinkling
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Not envisaged
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not envisaged
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise free machines & equipments will be used of latest technology. Green will be developed around the boundary line to curb the noise effects.
6.2 From industrial or similar processes Yes The noise generation from machinery will be low and limited as the entire process will be in a closed circuit. There will be some noise generation due to the working of DG sets which will be provided with acoustics to reduce the noise level.
6.3 From construction or demolition Yes New construction.
6.4 From blasting or piling No no
6.5 From construction or operational traffic No Inside horn will not be allowed
6.6 From lighting or cooling systems No No noise generation from lighting or cooling system is envisaged.
6.7 From any other sources No No other source envisaged.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes All the hazardous materials as per MSHIC handled at site will be done with appropriate safety measure. Leak proof containers will be used for storage & the containers storage will be done in separate area having green belt all around. For spillage proper pit will be provided to collect the spillage waste along with appropriate safety measure.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Domestic sewage generated shall be disposed through industrial/domestic sewer line provided by HSIIDC However for industrial effluent will be treated in ETP of capacity 40KLD. No liquid effluent will be discharged outside. It is a ZLD project.
7.3 By deposition of pollutants emitted to air into the land or into water No Adequate stack height and good engineering practices shall be ensured to keep emission of particulate matter to minimal VOC & other pollutants will be passed through the wet scrubber & will be recovered. The proposed plant is based on ZLD.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not envisaged.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes All safety rules as laid down by concerned Authorities will be complied. All the hazardous materials shall be stored separately & proper care shall be taken during handling & transportation & disposal. For safety, suitable PPE will be provided to all workers as required under the health & safety norms. Awareness Training about safety norms will be provided to all the employees. To deal with any fire related accident, fire fighting facility along portable fire extinguisher shall be provided
8.2 From any other causes No Not envisaged.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project falls under seismic active Zone IV according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficient will be adopted in horizontal and vertical direction respectively, while designing & construction.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Supporting facilities shall be developed in the proposed plant. The proposed project will have a positive effect and enhance the growth of the region. Management will provide appropriate contribution towards improvement of Medical and educational facilities for rural population in the vicinity. •The industry will help in promoting the activities related to environmental awareness in nearby Villages •Trained operators and workers in various aspects of EHS will be employed.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments Yes As new technology shall be installed, the technology shall enable energy efficient
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No There will be no environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not Applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters Yes 1. Yamuna River 9.6 Km, E 2. Ganaur Distributary – 500 m, NNE 3. Rajpur Distributary – 700 m, W 4. Sardhana Distributary – 7.8 km, SW 5. Saikhpura Drain – 5.6 km, W 6. Pur Khas Drain – 6 km, W 7. Mahra Drain – 8.9 km, SW 8. Samalkha Drain (main drain no-6)– 3 km, W 9. 1 L Minor – 500 m, N 10. 1 B Minor – 4.6 km, W 11. 2 R Minor – 4.4 km, S 12. Samalkha Minor – 3.4km, NE
5 State, National boundaries No Haryana-UP interstate boundary is at a distance of 9.8 km in South east direction.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No National Highway NH-1 is at a distance of 1.4 km in E direction
7 Defence installations No No such area within 10km around the site.
8 Densely populated or built-up area Yes Barhi is at a distance of 1 km in NE direction Nearest major town is Ganaur is at a distance of 2.5 km in NNW & densly populated sonepat is at a distance of 13.5 km in SSW
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes 1. Jain girls college - 3.76 km, NNE 2. ITI college Gannaur – 4km, NNW 3. DITM - 4.51km, NNE 4. Garhi Kalan Masjid - 6.34km, N 5. Pattikalyana PO – 10 km, N 6. Govt. Sr. secondary school Ghasauli-6.86km, ENE 7. Deenbandhu ChhotuRam university -9.64 km in SSE 8. Dharmashala seth khoobi ram Jindal- 9.61km, SE 9. Moolchand jain hospital- 2.93km, NNW
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No No such area within 10km around the site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No such area within 10km around the site.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No No such area within 10km around the site.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 23 Oct 2018
2.NAPlease refer our earlier observations. We reiterate the same. Please submit with proper justification and documents. No justification/documents found available 17 Oct 2018
3.NAThe correction have been made as per the instruction received 11 Oct 2018
4.NAPlease provide the following information: (1) Requirement of prior environmental clearance for the proposed products with justification. (2) Availability of the proposed land in the name of the proponent (3) As such project requires appraisal at SEAC/SEIAA 09 Oct 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantVineet
DesignationDirector
Name of Company (Applicant Name should not be given here)CENNET BIOPHARMA PVT LTD
Address405, Krishna Apra Buisness Square Netaji Subhash Place, Pritampura, New Delhi