(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s M/s Saboo Tor Pvt. Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/HP/IND/98317/2019
Project Cost 2412.78 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 72000 ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/HP/IND/98316/2018
MoEFCC file number(Previous EC)SIA/HP/008
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 24000 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage Kala Amb, Trilokpur road, Tehsil- Nahan, Dsitrict- Sirmaur
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.44,45,419/390
Town / VillageKala Amb
State of the projectHimachal Pradesh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Himachal PradeshSirmaurNahan(T)
10.
Nearest railway station along with distance in kms Ambala, 45 km
Nearest airport along with distance in kms Chandigarh, 45 km
11. Nearest Town/City/District Headquarters along with distance in kms Kala Amb , 1 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Kala Amb, Sirmaur
13. Name of the Applicant Pawan
14. Registered Address Trilokpur Road, Kala Amb, Tehsil- Nahan,
15.
Address for correspondance:
Name of the Company M/S SABOO TOR PVT. LTD.
Name of the Applicant Pawan
Designation (Owner/ Partner/ CEO) MD
Pin code 173030
E-mail sabootor01@gmail.com
Telephone No. 0172-4669295
Fax No. 0172-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No There will be no change in the land use. It is industrial land.
1.2 Clearance of existing land, vegetation and buildings? No The land is already clear.
1.3 Creation of new land uses? No It is Industrial land already in use for industry.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Expansion will be undertaken in the existing unit where pre investigation has already been done.
1.5 Construction works? Yes Installation of plant and Machinery & related structures.
1.6 Demolition works? No Nil
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary construction will be carried out for housing of construction workers, as the labour will be employed from the local area.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Raw material storage yard and other sheds for machinery & finished goods will be constructed and the soil generated will be used for the leveling.
1.9 Underground works including mining or tunnelling? No No mining /tunneling is involved.
1.10 Reclamation works? No Not required
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Manufacturing of Steel billets.
1.14 Facilities for storage of goods or materials? Yes Sheds will be provided for storage.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Sewage treatment plant will be provided for treatment of domestic effluent. Treated domestic effluent used on land for plantation within the premises.
1.16 Facilities for long term housing of operational workers? No No housing facilities as most of the skilled/unskilled manpower required for the construction /operation activities will be hired from the surrounding villages
1.17 New road, rail or sea traffic during construction or operation? No It is well connected with existing roads.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No There is no stream running across the site.
1.23 Abstraction or transfers of water from ground or surface waters? Yes Daily fresh water demand of the unit will be about 28.1 KLD which will be extracted through tube-well.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There will be no changes in water body. Since land is already leveled therefore there are no chances of surface run-off.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Material will be supplied by private suppliers. Personnel/Workers will have their own transport arrangements. However, no significant adverse impacts are envisaged as the traffic will not increase considerably after the proposed project.
1.26 Long-term dismantling or decommissioning or restoration works? No There are no long terms dismantling or decommissioning or restoration works due to expansion.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No decommissioning is proposed which could affect on environment.
1.28 Influx of people to an area in either temporarily or permanently? Yes People will come to the area for employment and other economic works.
1.29 Introduction of alien species? No No alien species are likely to be introduced.
1.30 Loss of native species or genetic diversity? No No native species or genetic diversity will be affected.
1.31 Any other actions? No No other action will be take place.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The unit already has 15005m2 acres of land. No additional land required.
2.2 Water (expected source & competing users) unit: KLD Yes Own tube-well, 28.1 KLD
2.3 Minerals (MT) No Minerals such as sand & aggregates will be required during the construction phase.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The project will involve concrete work for different buildings. The building materials required will be sand, coarse aggregate, fine aggregate, structural steel, bricks etc. The materials will be supplied by local vendors.
2.5 Forests and timber (source – MT) No Nill
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total power demand will be 9740.760 KW by HPSEB. Diesel will be used for DG sets. It will be sourced from local market.
2.7 Any other natural resources (use appropriate standard units) No No natural source will be used.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No The process does not involve the use of any hazardous material. However, the used oil from the DG set which is a hazardous waste will be disposed off as per HWM rules.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Project activities are not likely to cause changes in occurrence of disease or affect disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? No Employment opportunities will be created by operation of the plant. This will be benefited by direct and indirect employment which would improve the living conditions of the people and also through socio economic measures taken up by the proponent.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not anticipated.
3.5 Any other causes No Nil
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Nil
4.2 Municipal waste (domestic and or commercial wastes) Yes The MSW will be segregated and disposed of as per MSW rules 2016.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used DG Set oil about 0.01KL/ annum will be used as lubricant for machines. About 0.04Ton/day flue gas residues stored in impervious pit and for disposed to approved TSDF site.
4.4 Other industrial process wastes Yes An estimated 13.3 TPD Slag will be generated from furnaces and disposed off to approved manufacturer of concrete blocks, pavers and tiles.
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge will be generated from STP and wet scrubber will be sent to authorized recyclers.
4.7 Construction or demolition wastes Yes During construction phase, soil will be excavated for foundation purposes and the same will be used within the site. No demolition waste will be generated.
4.8 Redundant machinery or equipment No Nil
4.9 Contaminated soils or other materials No Nil
4.10 Agricultural wastes No Nil
4.11 Other solid wastes No Nil
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There will be emission from the operation of D.G. Sets. Canopy and adequate stack height will be provided.
5.2 Emissions from production processes Yes Flue gas emission and Fugitive emission from Induction Furnaces.
5.3 Emissions from materials handling including storage or transport No Nil
5.4 Emissions from construction activities including plant and equipment Yes Small amount of particulate matter and gases which are generated will be limited to small duration and within the plant premises.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During construction water sprinklers will be used to avoid dust. There are no odor creating process involve in the unit.
5.6 Emissions from incineration of waste No Nil
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Nil
5.8 Emissions from any other sources No Nil
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Some noise will be created during the operation of DG set, however canopy will be provided to reduce the noise level.
6.2 From industrial or similar processes No Nil
6.3 From construction or demolition Yes Due to construction activities there will be short term noise impacts in the immediate vicinity of the project site. However, the noise will be for short duration and limited to project site only.
6.4 From blasting or piling No There is no blasting involved.
6.5 From construction or operational traffic No The traffic during construction phase shall not have any significant impact. During the operational phase, only personnel vehicles as four/ two wheelers shall be used by the flat owners.
6.6 From lighting or cooling systems No Nil
6.7 From any other sources No Nil
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No, hazardous material are used in the process. However, the hazardous waste will be handled and disposed off as per HWM.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Treated wastewaters (domestic) to be used for irrigation of purpose within the factory premises.
7.3 By deposition of pollutants emitted to air into the land or into water No Emissions from Induction furnace will be collected in bag filters and clean air will be vented to the atmosphere through a stack of adequate height.
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Nil
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes The risk during the construction will be minimized by proper training and provision of appropriate PPE’s. The plant will be operated as per standard operated procedure and adoption of safe work practices.
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Nil
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The proposed expansion will not result in such consequences as may lead to environmental effects.
9.2 Lead to after-use of the site, which could have an impact on the environment No Nil
9.3 Set a precedent for later developments No It is existing developed Industrial land.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes There are number of other Industrial units nearby.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No There are no such sensitivities within the study as per the list of protected area of India. http://wiienvis.nic.in/Database/Protected_Area_854.aspx
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No There are no Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains & reserve forest area within 10 KM radius. The activity of the unit will not affect the forests in any way.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No There are no such important or sensitive areas with in 10 km area of the unit.
4 Inland, coastal, marine or underground waters No There are no coastal or marine water near the site.
5 State, National boundaries No Haryana State Boundary 1.5 Km
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH-72, Ambala- Dehradun is at a distance of about 1 km from site. There will be no affect of the unit on the road.
7 Defence installations No There is no defence installation near the unit. There is no effect of the unit on the defence installations.
8 Densely populated or built-up area Yes Residential area of village Kala Amb.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes These exist in Kala Amb at a distance of about 1 km. There will be no affect of the unit on these facilities.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Markanda River is at 1Km from the site but will not be impacted as no waste will be disposed off into it.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nil
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Nil
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Toposheet
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantPawan
DesignationMD
Name of Company (Applicant Name should not be given here)M/S SABOO TOR PVT. LTD.
AddressTrilokpur Road, Kala Amb, Tehsil- Nahan,