APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | GUJARAT BHAL CONSTRUCTION LIMITED | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/GJ/NCP/67353/2017 | Project Cost | 16029 lacs | |
| 2. | |
S. No. in the schedule | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| Project Sector | INFRA-1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 100,18,301 square meter i.e 2504 acre ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 10018301 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | DHOLKA | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | VARIOUS SURVEY NUMBERS OF BORU,BHOLAD AS PER FORM 1 | Town / Village | Dholka | State of the project | Gujarat | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Gujarat | Ahmedabad | Dholka | | 10. | |
Nearest railway station along with distance in kms | Dholka, 12 km | Nearest airport along with distance in kms | Ahmedababd, 23 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | ahmedabad , 30 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | not applicable | | 13. | Name of the Applicant | udayan | | 14. | Registered Address | 231,Platinum Plaza,Opp IOC petrol Pump,Satya Marg,JUdges Bunglow,Bodakdev: 380051 | | 15. | |
Address for correspondance: | Name of the Company | UDAYAN | Name of the Applicant | udayan | Designation (Owner/ Partner/ CEO) | engineer | Pin code | 380054 | E-mail | ikagzigpcb@gmail.com | Telephone No. | 79-40025663 | Fax No. | 79- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | Yes | Uploaded details | Annexure-Uploaded details | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | this is an area development project | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | As per form 1 and project summary | 1.3 | Creation of new land uses? | Yes | As per form 1 and project summary | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | As per form 1 and project summary | 1.5 | Construction works? | No | As per form 1 and project summary | 1.6 | Demolition works? | No | As per form 1 and project summary | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | As per form 1 and project summary | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | As per form 1 and project summary | 1.9 | Underground works including mining or tunnelling? | No | As per form 1 and project summary | 1.10 | Reclamation works? | No | As per form 1 and project summary | 1.11 | Dredging? | No | As per form 1 and project summary | 1.12 | Offshore structures? | No | As per form 1 and project summary | 1.13 | Production and manufacturing processes? | Yes | As per form 1 and project summary | 1.14 | Facilities for storage of goods or materials? | Yes | As per form 1 and project summary | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | As per form 1 and project summary | 1.16 | Facilities for long term housing of operational workers? | Yes | As per form 1 and project summary | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | As per form 1 and project summary | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | As per form 1 and project summary | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | As per form 1 and project summary | 1.20 | New or diverted transmission lines or pipelines? | No | As per form 1 and project summary | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | As per form 1 and project summary | 1.22 | Stream crossings? | No | As per form 1 and project summary | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | As per form 1 and project summary | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | As per form 1 and project summary | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | As per form 1 and project summary | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | As per form 1 and project summary | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | As per form 1 and project summary | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | As per form 1 and project summary | 1.29 | Introduction of alien species? | No | As per form 1 and project summary | 1.30 | Loss of native species or genetic diversity? | No | As per form 1 and project summary | 1.31 | Any other actions? | No | As per form 1 and project summary | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | As per form 1 and project summary | 2.2 | Water (expected source & competing users) unit: KLD | Yes | As per form 1 and project summary | 2.3 | Minerals (MT) | No | As per form 1 and project summary | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | As per form 1 and project summary | 2.5 | Forests and timber (source – MT) | No | As per form 1 and project summary | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | as per form 1 | 2.7 | Any other natural resources (use appropriate standard units) | Yes | as per form 1 | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | as per form1 | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | NA | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | NA | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | NA | 3.5 | Any other causes | No | NA | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | As per form 1 and project summary | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | As per form 1 and project summary | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | As per form 1 and project summary | 4.4 | Other industrial process wastes | Yes | As per form 1 and project summary | 4.5 | Surplus product | Yes | As per form 1 and project summary | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | As per form 1 and project summary | 4.7 | Construction or demolition wastes | No | NA | 4.8 | Redundant machinery or equipment | Yes | As per form 1 and project summary | 4.9 | Contaminated soils or other materials | No | NA | 4.10 | Agricultural wastes | No | NA | 4.11 | Other solid wastes | No | NA | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | As per form 1 and project summary | 5.2 | Emissions from production processes | Yes | As per form 1 and project summary | 5.3 | Emissions from materials handling including storage or transport | Yes | As per form 1 and project summary | 5.4 | Emissions from construction activities including plant and equipment | Yes | As per form 1 and project summary | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | NA | 5.6 | Emissions from incineration of waste | No | As per form 1 and project summary | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | Yes | NA | 5.8 | Emissions from any other sources | No | NA | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | As per form 1 and project summary | 6.2 | From industrial or similar processes | Yes | As per form 1 and project summary | 6.3 | From construction or demolition | Yes | As per form 1 and project summary | 6.4 | From blasting or piling | No | NA | 6.5 | From construction or operational traffic | Yes | As per form 1 and project summary | 6.6 | From lighting or cooling systems | Yes | As per form 1 and project summary | 6.7 | From any other sources | No | NA | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | As per form 1 and project summary | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | As per form 1 and project summary | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | As per form 1 and project summary | 7.4 | From any other sources | No | As per form 1 and project summary | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | NA | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | As per form 1 and project summary | 8.2 | From any other causes | No | As per form 1 and project summary | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | As per form 1 and project summary | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | As per form 1 and project summary | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | As per form 1 and project summary | 9.3 | Set a precedent for later developments | Yes | As per form 1 and project summary | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | NA | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | NA | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | NA | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | NA | 4 | Inland, coastal, marine or underground waters | No | NA | 5 | State, National boundaries | No | NA | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | NA | 7 | Defence installations | No | NA | 8 | Densely populated or built-up area | No | NA | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | NA | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | NA | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | NA | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | NA | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 13 Sep 2017 | 2. | NA | please upload and submit these below information as separate file
1. In Form-1, area is mentioned as Zero (0). Please indicate total area of the proposed Industrial Estate.
2. Please furnish the list of A category and B category industries, as per the EIA notification proposed in industrial area separately. | 12 Sep 2017 | 3. | NA | The correction have been made as per the instruction received | 23 Aug 2017 | 4. | NA | 1. In Form-1, area is mentioned as Zero (0). Please indicate total area of the proposed Industrial Estate.
2. Please furnish the list of A category and B category industries, separately. | 22 Aug 2017 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | udayan | Designation | engineer | Name of Company (Applicant Name should not be given here) | UDAYAN | Address | 231,Platinum Plaza,Opp IOC petrol Pump,Satya Marg,JUdges Bunglow,Bodakdev: 380051 |
|
|