APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s “Holistic Development of Surat Airport Including Extension of Terminal Building, Apron and Construction of Parallel Taxi Track” at Surat International Airport.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/MIS/97177/2019
Project Cost 35325 lacs
2.
S. No. in the schedule7(a) Air ports
Project Sector INFRA-2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 10.677 HA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/GJ/MIS/97174/2007
MoEFCC file number(Previous EC)Nil
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 317.42 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSurat International Airport, on Magdalla - Dumas Road, Surat
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Surat International Airport on Magdalla - Dumas Road, Surat
Town / VillageSurat
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratSuratSurat City
10.
Nearest railway station along with distance in kms Surat Railway Station, 14.0 km towards NE km
Nearest airport along with distance in kms Bhavnagar Airport, 76.1 km km
11. Nearest Town/City/District Headquarters along with distance in kms Surat , 1 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Surat Municipal Corporation (SW Zone), South West Zone Vahivati Bhavan, Municipal Shopping Center, Near Aadarsh Nagar Society, Athwalines, Surat. Telephone: 2663049-50 / 2667926 Surat Municipal Corporation – Head Quarter, "Surat Mahanagar Seva S
13. Name of the Applicant BARUN
14. Registered Address On Magdalla-Dumas Road, Surat
15.
Address for correspondance:
Name of the Company AIRPORT AUTHORITY OF INDIA,SURAT
Name of the Applicant BARUN
Designation (Owner/ Partner/ CEO) AGM
Pin code 11003
E-mail suratterminal@gmail.com
Telephone No. 0261-2700200
Fax No. 0261-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?Yes
StatusApplication for Wildlife Clearance yet to be submitted
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No No change in land use is envisaged since the project is coming up within existing premises. No significant change in topography is envisaged.
1.2 Clearance of existing land, vegetation and buildings? No Buildings: The Site of proposed development work will be done at existing Surat Airport Premise and there is no any buildings will be demolished. Land & vegetation: There is no significant vegetation at site except for scattered shrubs & herbs, which will be cleared during site preparation activities. There will be no/ negligible physical impact on the locality due to the same.
1.3 Creation of new land uses? No The land is a part of existing Airport belongs to Airport Authority of India and there will be no creation of new land use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Pre-construction investigations e.g. bore house, soil testing will be carried out before construction.
1.5 Construction works? Yes Construction activities will have temporary impact on the locality in terms of dust generation, transportation etc. The same will be mitigated by effective EIA/EMP.
1.6 Demolition works? No No demolition is envisaged.
1.7 Temporary sites used for construction works or housing of construction workers? No All the construction activity including stacking of building materials will be confined within the project site only in confined area. No temporary labour hutments are proposed. Local workers will be hired from the nearby areas during construction phase/ workers will be sourced by construction contractor.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Earthworks will be involved during construction of foundation and other allied facilities. Under proposed development work, new integrated terminal building will be constructed. Excavated materials will be used for filling at the site.
1.9 Underground works including mining or tunnelling? No No underground works including mining or tunneling will be required for the proposed development work.
1.10 Reclamation works? No No reclamation work is required.
1.11 Dredging? No No Dredging is involved
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? No Separate raw material handling yard will be made within the project premises. Cement will be separately stored under cover in bales. Sand will be stack neatly under tarpaulin cover. Bricks and steel will be laid in open. The overall physical impact considering the size will be minimal and temporary.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Waste Water: Waste water generated during operation phase will be treated in STP & treated water will be used for flushing, horticulture and HVAC & DG cooling purpose. Solid Waste: Solid waste generated during operation phase will be collected, Segregated, transported at existing solid waste site of airport and & disposed off as per SWM Rules, 2016.
1.16 Facilities for long term housing of operational workers? No During Construction phase: The workers during construction phase shall be hired from nearby areas by construction contractor and hence there is no need of providing long term housing. During Operation Phase: No new housing facilities are envisaged for the proposed project.
1.17 New road, rail or sea traffic during construction or operation? No No new road, rail or sea traffic is proposed. Existing transportation facilities will be used during construction or operation phase. Internal tracks and paths will be developed for traffic circulation during operational phase.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Only existing transport facilities will be used to transport the construction materials to the proposed development work.
1.20 New or diverted transmission lines or pipelines? Yes There is no transmission line or pipeline at the proposed development work site. Pipelines for water supply is proposed and will be connected through existing pipelines of water supply and also sewerage line will be connected to the proposed STP within project premises.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No The same is not envisaged from the project.
1.22 Stream crossings? No There are no stream crossings.
1.23 Abstraction or transfers of water from ground or surface waters? No The domestic water requirement for the project estimated to be about 531 KLD (4380 cum/ annum) will be met through SMC supply.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Water body: There is no water body in and around project premises. Land Surface Run-off: The land surface affecting the drainage will be altered (retaining the same direction - though slope will be made gentle), however the impact will be confined to the site. There will be increase in total surface run-off during post construction phase, which will be capturing through well designed storm-water pipe network of rain-water harvesting and will be used for recharge of the aquifers.
1.25 Transport of personnel or materials for construction, operation or decommissioning? No Construction Phase - Contractor will arrange for labor and workmen with their transport.
1.26 Long-term dismantling or decommissioning or restoration works? No Not envisaged.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not envisaged.
1.28 Influx of people to an area in either temporarily or permanently? No During Construction phase: Temporary influx of people in the form of labours is envisaged. Approx. 100 no. of local labours shall be employed. During Operation Phase: During operation phase terminal building passengers with visitors, AAI staffs, other airlines and food court staffs.
1.29 Introduction of alien species? No No such possibility is envisaged due to construction and operation phase of the proposed development work.
1.30 Loss of native species or genetic diversity? No There will be no loss of any native species or genetic diversity due to the proposed expansion.
1.31 Any other actions? No None
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land is a part of existing Airport. The area earmarked for the proposed extension of terminal building is about 17,035 m2, for Apron (including Shoulder, GSE & Shoulder converted to apron) is 34,940 m2 and for construction of Parallel Taxi Track (including Shoulder) is 91535 m2 within the existing airport premises.
2.2 Water (expected source & competing users) unit: KLD Yes During operations phase, total water requirement will be 531 KLD (Domestic). Out of which 301 KLD will be fresh water and 230 KLD will be recycled/treated water. The water requirement for Landscaping, HVAC & DG cooling will be about 250 KLD (treated water) and the same will be supplied by Surat Municipal Corporation (SMC) water supply
2.3 Minerals (MT) Yes Cement, bricks, aggregate and sand will be required for construction of the proposed development.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The major materials required for construction of the project are steel, tiles, glass, cement, agate, bricks, flooring tiles / stones, sanitary and hardware items, electrical fittings, etc.
2.5 Forests and timber (source – MT) No Not envisaged
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes DG sets of capacity of 1000 kVA (3 nos.) used in case of power cut or failure. Renewable source of energy in the form of solar will be proposed as per ECBC, 2017 & Gujarat building Bye Laws 5% of connected load (4045 KW) i.e, 200 KW solar PV power plant will be established to generate solar power.
2.7 Any other natural resources (use appropriate standard units) Yes Aggregate and sand will be required for construction purpose.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes No hazardous substances or material (as per MSIHC rules) will be used at the proposed development work during construction and operation phase. Small quantity of paints and HSD for DG sets operation will be used; however, quantity of these materials will be much less than the threshold quantity mentioned in MSIHC Rule.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No such possibility is anticipated during construction and operation phase of proposed development work.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Approximately 100 nos. of worker will get employment during construction phase of the project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged
3.5 Any other causes No Not envisaged
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No such waste will be generated from the construction of the proposed development work.
4.2 Municipal waste (domestic and or commercial wastes) Yes Construction phase:- Solid waste during construction phase will be 15 kg/day which shall be disposed off SWM Rules, 2016. Operations Phase :- Solid waste during operation phase will be approx 1414 kg/day which shall be collected in separate bins & disposed as per SWM Rules, 2016.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Spent oil, hence authorization under HOWR is not required) will be generated from transformers & DG sets, which will be carefully stored in High Density Polythene (HDPE) drums at isolated area having impervious base, afterwards sold to the registered vendors. Suitable care will be taken so that spills/leaks of spent oil from storage could be avoided.
4.4 Other industrial process wastes No None
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes About 48 KLD wet sludge will be generated from STP, which will be used as manure in landscaping (after digestion).
4.7 Construction or demolition wastes No Construction & demolition waste generated during construction phase will be disposed as per C & D Rules, 2016.
4.8 Redundant machinery or equipment No No redundant machinery or equipment will be used.
4.9 Contaminated soils or other materials No Due care will be taken so that there is no contamination of soil or other materials.
4.10 Agricultural wastes No During Operational Phase 1.77 kg/day agricultural waste will be generated.
4.11 Other solid wastes No Agriculture waste
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The details of emissions from the project are summarized as under: Stationary sources: There will be emissions from DG sets of capacity 1000 kVA- 3 nos. Low sulphur-content fuel (HSD: Sulphur content - 0.05%), will be used to contain the emissions within the permissible norms. Mobile sources: There will be emissions from vehicular exhausts during movement of vehicles.
5.2 Emissions from production processes No There is no production process in the project.
5.3 Emissions from materials handling including storage or transport Yes The emission expected from construction phase will be dust arising from material handling and vehicular emission from transport vehicles. These include the emissions due to idling of the vehicles during loading and unloading activities. Management: Idling of the vehicles will be reduced to the extent possible
5.4 Emissions from construction activities including plant and equipment Yes Emissions will be low in magnitude, temporary in nature and reversible. Sprinkling of water will be practices daily and before entry of trucks bringing in materials during construction phase.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During excavation and earth work dust emissions are anticipated, however, this dust comprising coarse particles will be settled at short distance. No odour problem is anticipated from construction materials, sewage and waste as same will be handled as per standard practice.
5.6 Emissions from incineration of waste No No incineration activity will take place.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources Yes Air emissions due to aircraft take off, landing taxiing and from apron parking are other existing sources of air emissions. Emissions from vehicular movement during construction and operation phases.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes From construction equipment and DG set, 70 to 80 dB (A) noise levels may be generated. However, acoustic enclosures will be fitted with DG sets to control the noise levels.
6.2 From industrial or similar processes No None
6.3 From construction or demolition Yes Negligible. Noise due to construction activities shall be minimal and temporary in nature. No heat or light emissions are envisaged.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes Some amount of noise (70 – 75 dB (A)) will be generated from vehicular movement in the construction and operational phase. Plantation around the boundary wall shall be done to reduce noise from traffic.
6.6 From lighting or cooling systems No No noise will be generated from lighting or cooling systems
6.7 From any other sources Yes Noise will be generated during takeoff and landing and taxing of aircraft
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The hazardous waste generated is Used oil only and it will be stored in HDPE drums and kept in covered rooms under lock and key and is sold to authorized vendors only. Special care is being taken to prevent leakages and spills. No additional hazardous waste generation due to proposed development.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes During operational phase, approx. 481 KLD waste water will be generated & treated in proposed 600 KLD STP. The treated wastewater from the STP will be used for flushing, horticulture and HVAC & DG cooling.
7.3 By deposition of pollutants emitted to air into the land or into water No The dust generation may take place due to material handling and earth works at construction site. These emissions are neutral in nature and will be settled in the immediate vicinity hence no impact is anticipated. During operation, DG set emissions stack will be provided as per CPCB guideline. Sewage will be treated in sewage treatment plant (STP).
7.4 From any other sources No There will not be any other sources.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No such impact is anticipated.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes During Construction Phase: All appropriate measures shall be taken to avoid accidents. During Operational Phase: Proper Disaster management & fire fighting system will be installed at site.
8.2 From any other causes Yes •Emergency during Aircraft landing and takeoff •Traffic movement inside Airport • Short circuit at terminal building.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The airport is located in Seismic Zone -III. Suitable safeguards will be taken.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The proposed development of Surat Airport is aimed to provide better facilities for tourist, business and local passengers. Any development activity around the civil enclave will be discouraged or it will be as per applicable siting criterion.
9.2 Lead to after-use of the site, which could have an impact on the environment No None
9.3 Set a precedent for later developments No Not anticipated
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not anticipated
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes a) Dargah known as Khawaja Dana Saheb's Rouza * - 11.8 11.8 Km towards NE b) Tomb of Khawaja Safar Sulemani (Khudawand Khan Rojo)* -13.0 Km towards NE c) Old English Tombs *-13.72 Km towards NE d) Old Dutch & Armenian Tombs & Cemeteries *- 13.73 Km towards NE
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Tapi River- 2.7 Km towards NNW Mindhola River - 6.4 Km towards S Tena River - 10.0 Km towards NNW
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Hazira Bird Sanctuary - 11.4 Km towards WSW
4 Inland, coastal, marine or underground waters Yes Coastal area of Arabian Sea- 3.2 Km towards SW
5 State, National boundaries Yes None
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes SH-168 :- Adjacent to Airport Boundary SH-170 :- 12.0 km towards ENE SH-197:- 13.0 km towards NNE SH-169 :- 13.9 km towards NNE
7 Defence installations No None
8 Densely populated or built-up area Yes Magdalla :- 0.7 km towards NNE
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals: a) Green Leaf Hospital:-4.9 km towards NE b)Sunshine Global Hospital :- 5.6km towards NNE Places of worship: a)Vesu Ambaji Temple :- 3.8 km towards NE b) Rundhnath Mahadev Temple :- 4.3 km towards NNE Schools: a) Kendriya Vidyalaya No.3, ONGC Surat :- 3.0 km towards NNE b) S.D. Jain Modern School :- 5.0 km towards NNE
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No The project site is categorized as non-notified, safe zone for ground water use.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The area is classified as Zone III (Moderate) as per the BIS classification.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantBARUN
DesignationAGM
Name of Company (Applicant Name should not be given here)AIRPORT AUTHORITY OF INDIA,SURAT
AddressOn Magdalla-Dumas Road, Surat