(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed expansion of secured landfill (Phase IV) of Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (TSDF) at plot number 9701 –9716, GIDC Ankleshwar, proposed by M/s Bharuch Enviro Infrastructure Limited.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/MIS/100385/2019
Project Cost 5058 lacs
2.
S. No. in the schedule7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Project Sector INFRA-2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 13.4 Lacs MT ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/GJ/MIS/42857/2016
MoEFCC file number(Previous EC)10-10/2014-IA-III
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 14.58 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
b) Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot No- 9701 –9716, Gujarat Industrial Development Corporation (GIDC) Notified Industrial Estate Ankleshwar
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot No- 9701 –9716, Gujarat Industrial Development Corporation (GIDC) Notified Industrial Estate Ankleshwar
Town / VillagePlot No- 9701 –9716, Gujarat Industrial Development Corporation (GIDC) Notified Industrial Estate Ankleshwar
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratBharuchAnklesvar
10.
Nearest railway station along with distance in kms Dadhal Inaam, 2.4 km
Nearest airport along with distance in kms Surat Airport, 63 km
11. Nearest Town/City/District Headquarters along with distance in kms Ankleshwar , 4 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Bharuch Nagar Palika Station Road, Opposite Shalimar Talkies Road, Station Road, Mobin Colony, Happy Nagar, Ankleshwar, Gujarat 393001, India ‎ +91-2646 243 468 ‎
13. Name of the Applicant BD
14. Registered Address PLOT NO- D-43 Dahej Industrial Estate Tal Vagra
15.
Address for correspondance:
Name of the Company BHARUCH ENVIRO INFRASTRUCTURE LIMITED (BEIL),
Name of the Applicant BD
Designation (Owner/ Partner/ CEO) CEO
Pin code 392130
E-mail patelml1@beil.co.in
Telephone No. 264-253135
Fax No. 264-222849
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Changes in land use, land cover or topography is envisaged as Common Hazardous Waste Treatment, Storage and Disposal Facility (CHWTSDF) are proposed as per the Hazardous Wastes (Management, Handling and Trans boundary Movement) Rules 2016, and its subsequent amendments.
1.2 Clearance of existing land, vegetation and buildings? No The proposed project is part of existing TSDF site.
1.3 Creation of new land uses? No Not applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical investigations is attached
1.5 Construction works? Yes Civil construction activities are involved for development of secured landfill (Phase III) and Common Incineration Facility (Installation of 3rd Incinerator) of Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (TSDF).
1.6 Demolition works? No Not required
1.7 Temporary sites used for construction works or housing of construction workers? No Not required
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes The proposed construction/development involves to increase the existing capacity of secured landfill (Phase IV) of Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (TSDF). Excavation will be done for Landfill for laying liner and leachate collection system. The excavated soil shall be used for construction of earthen bunds and landfill lining.
1.9 Underground works including mining or tunnelling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? No Not applicable
1.14 Facilities for storage of goods or materials? Yes This is an expansion project. Existing facilities for storage of Hazardous material will be used.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Proposed expansion project of secured landfill (Phase IV). Existing facilities for stabilization of hazardous waste and treatment leachate by MEE shall be used.
1.16 Facilities for long term housing of operational workers? No Mostly local workers are involved.
1.17 New road, rail or sea traffic during construction or operation? No Mostly local workers are involved.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? No There is no additional requirement of water. Water is being supplied by GIDC.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No change in the water bodies or the land surface is expected, which will affect drainage or runoff.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Transport of personnel/material during the construction and operation phase shall be met through local resources.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Local workers will be preferred
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land falls in the industrial area and the proposed expansion project is in existing site that is earmarked for Common Hazardous Waste Treatment Storage and Disposal Facility (TSDF).
2.2 Water (expected source & competing users) unit: KLD Yes Total Water Consumption 657 KLD (Existing) including Domestic (27 KLD) that is being already available from GIDC supply. No additional water will be required.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Stones, aggregates etc will be taken from local market.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Proposed project is an expansion of existing secured landfill (Phase IV). No additional power is required. Supply source – Daxin Gujarat Vij Company Limited (DGVCL). In case of power failure, D.G. Set of 975 KVA (2 Nos.) & 600 KVA (1 Nos.) can be used. HSD, (For DG Set), Natural Gas, FO/NG (for Boiler) are used as fuel at rate of 0.54 KL/Hr, 4,80,000 Nm3/M and 350 Kg/Hr or 13200 Nm3/M respectively.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No The process of storage, treatment & disposal of hazardous waste is not likely to involve the use of hazardous chemical as per MSIHC Rules. All the industrial Hazardous waste collected at proposed site will be scientifically treated/ stabilized as per CPCB guidelines before disposing in secured landfill. Hence no health impacts envisaged.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Yes The accumulation of water shall be prevented. Limited use of insecticides may be done to prevent mosquito breeding. Suitable drainage and waste management measures will be adopted in both the construction and operational phase which will restrict stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. To prevent the adverse effects of hazardous waste during storage handling & disposal PPE shall be provided to workers.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The proposed expansion project of secured landfill site (Phase IV) of Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (CHWTSDF) will provide employment to local people in the proposed area. The scientific management (storage, treatment & incineration) of Hazardous waste shall improve the overall environment of the area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No There is no hospital, schools etc in close vicinity of the proposed project.
3.5 Any other causes No None envisaged
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes The excavated soil shall be used for bunding & lining of the landfill site.
4.2 Municipal waste (domestic and or commercial wastes) Yes Management of Municipal Solid waste from office, canteen, etc is done as per MSW (Management & Handling) Rule, 2016 as amended thereof. In Biogas plant, biodegradable kitchen solid waste is processed and the bio gas generated is used as fuel in the incinerator plant.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The proposed expansion project of secured landfill (Phase IV) of Common Hazardous Waste Treatment, Storage & Disposal Facility (TSDF) will be developed & operated to treat and dispose the hazardous waste as defined under Hazardous Wastes (Management, Handling & Trans boundary Movement) Rules 2016. Incineration Ash, discarded containers and used oil are generated from Common Incineration facility, which will be handle as per the GPCB norms.
4.4 Other industrial process wastes No Leachate / Effluent from landfill will be treated in the existing Multiple Effect Evaporator (MEE) plant. Whenever MEE is not in operation, Leachate will be sent to CETP of Enviro Technology Limited at Ankleshwar.
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Residue from MEE shall be disposed in Landfill Site.
4.7 Construction or demolition wastes No Not envisaged
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No The hazardous waste shall store in covered area paved with liner system.
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emissions from DG set containing PM, SO2 and NOX within permissible limit will be let-out through stack. Emission from Boilers/ Heaters/ Furnace/ and other processes involving fuel SPM: 150 mg/nm3 SO2 : 100 PPM NOX :50 PPM
5.2 Emissions from production processes Yes Proposed expansion of landfill facility shall generate fugitive emissions which will be controlled by water sprinkling. During post closure air vents shall be provided.
5.3 Emissions from materials handling including storage or transport Yes Dust generation due to material handling and transportation during operation phase shall be controlled by sprinkling water.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive emissions are likely during the construction & transportation activities due to use of construction equipment. These are temporary in nature.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust generation during the construction phase shall be suppressed by sprinkling water. The hazardous waste shall be transported in closed containers and will be stored & treated in a confined area and its processing within a time limit.
5.6 Emissions from incineration of waste Yes The existing integrated TSDF has the incinerator system equipped with Bag Filter & Scrubber to contain all parameters within prescribed limits.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise levels are expected from the use of pumps and motors Necessary PPEs (earplug, muffs) will be provided for the personnel working in these area. All other machinery shall be maintained to minimize the noise levels
6.2 From industrial or similar processes Yes All machineries used for treatment of Hazardous Waste including incinerator at TSDF site shall be maintained to minimize noise levels.
6.3 From construction or demolition Yes Due to various construction activities there will be short term noise impacts in the immediate vicinity of the project site. Regular maintenance of all the machinery shall be carried out to minimize noise levels.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes Noise generation due to vehicular movement during construction & operation phase shall not be very significant. However regular maintenance of vehicles shall be carried out. Additional plantation shall be undertaken.
6.6 From lighting or cooling systems No All the DG sets have acoustic enclosures as per norms
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The proposed expansion of existing landfill facility already has facility for storage, treatment and disposal the hazardous waste as per the Hazardous Waste (Management Handling & Trans boundary Movement) Rules 2008 and its subsequent amendments. Spent oil from DG set shall be stored separately & sold to registered recycler
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Leachate will be pumped from leachate wells and will be sent to MEE at plant site/ CETP at Ankleshwar for treatment and disposal.
7.3 By deposition of pollutants emitted to air into the land or into water No Not Applicable
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Implementation of proper Environmental Management Plan shall maintain the levels of pollutant within prescribed limits
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Explosives shall not be used. To deal with any accident, firefighting facility, fire extinguishers, exit sign board, alternative source of electricity supply, fire alarm system, and water storage tank for firefighting has been provided at TSDF site. PPEs are provided to the worker Training and awareness about the safety norms is being provided to all involved in project activities.
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project area falls under Seismic zone-III.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The project will have positive impact on the environment in terms of better hazardous waste management in the region. More employment opportunities will be created and aesthetics of the area will be improved. No impact Not applicable Not applicable Sustainable disposal of hazardous waste. NA
9.2 Lead to after-use of the site, which could have an impact on the environment No The closure plan of the proposed expansion project of secured landfill (Phase III) and Common Incineration System/Facility of Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (CHWTSDF) includes to development of greenery and management of storm water drainage. The post project monitoring shall be carried out in accordance with the prescribed norms.
9.3 Set a precedent for later developments Yes The project aims at providing high quality TSDF for treatment of hazardous waste from existing and upcoming industrial units in the area.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No The proposed project is an expansion project to increase the existing capacity of secured landfill (Phase III) and Common Incineration Facility of TSDF.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No There are no national park and eco sensitive zone within 15 km from the proposed site.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Narmada River- 09 km from Project Site
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes Ankleshwar, approximately 4 kms (aerial distance) in NW direction.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes School/Colleges: Lions's School-3.15 Km, SW Ascent Primery School - 4.9Km, NW Govt. Engineering College - 11.5 Km, NW Hospitals: Aman Medical - 11.3 Km, NW Worship Places: Ram Kund Temple - 7.5 Km NW
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Narmada River which is approximately 9.0 Km in the North West direction from the project site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The plant area falls in Seismic zone-III, the area is not prone to subsidence, landslides, erosion, flooding etc.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
Additional Attachments, if any
Attached File
Geo Technical Report
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantBD
DesignationCEO
Name of Company (Applicant Name should not be given here)BHARUCH ENVIRO INFRASTRUCTURE LIMITED (BEIL),
AddressPLOT NO- D-43 Dahej Industrial Estate Tal Vagra