S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Roha-Kotada-Nandra-Jarjok Bauxite Mining Project (Mine Lease Area – 360.3601 Ha. & Production Capacity 1,00,000 TPA) at Village: Roha, Kotada, Nana Nandra, Mota Nandra & Jarjok Tehsil: Abdasa & Naktarna, District Kutch, Gujarat, Regarding Validation of Environmental Clearance under the provision of EIA Notification 2006 and in compliance of MoEF&CC Notification dated 06th April 2018
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/MIN/80983/2018
Project Cost 52.11 lacs lacs
2.
S. No. in the schedule1(a) Mining of minerals
Project Sector Non-Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 360.3601 ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 360.3601 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage -Jarjok, Roha (Kotada), Roha, Mota Nandra, Nana Nandra
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.184P, 194P,177P, 87P, 80P, 106, 146P, 147, 148p, 155, 157, 158, 159p, 160/1p, 160/2, 161, 162, 163/1, 163/2, 164p
Town / VillageJarjok, Roha (Kotada), Roha, Mota Nandra, Nana Nandra
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratkutchAbdasa
10.
Nearest railway station along with distance in kms Deshalpar, 19.5 km
Nearest airport along with distance in kms Air force Station, 33.46 km
11. Nearest Town/City/District Headquarters along with distance in kms Deshalpar , 20.1 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Panchayat- Village- Roha, Kotada, Nana Nandra, Mota Nandra & Jarjok, Tehsil-Abdasa & Nakhtarana; Dist-Kutch (Bhuj); Gujarat- PIN- 370030 Zila Parishad- Bhuj, Gujarat. Municipality- Bhuj, Tehsil- Abdasa & Nakhtarana, Dist – Kutch (Bhuj), G
13. Name of the Applicant Chirag
14. Registered Address KHANIJ BHAVAN 132 FEET RING ROAD NEAR UNIVERSITY RING ROAD VASTRAPUR AHMEDABAD
15.
Address for correspondance:
Name of the Company GUJARAT MINERAL DEVELOPMENT CORPORATION LIMITED
Name of the Applicant Chirag
Designation (Owner/ Partner/ CEO) General Manager (Environment)
Pin code 380052
E-mail env@gmdcltd.com
Telephone No. 79-27912322
Fax No. 79-07927913038
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes It is existing operative mine. The mining activity will result into permanent land use change which will localized in form of physical change of Topography and Land Use. Out of total 360.3601 ha. ML area. Presently the land use scenario is as under – a.Total Excavated Area-16.16 Ha b.Waste dump site- 1.00 Ha c.Mineral storage-0 d.Infrastructure- Mine office, rest shelter etc.- 0.20 Ha e.Roads-5.80 Ha f.Green Belt-15.29 Ha g.Natural water bodies-2.25 Ha h.Undisturbed area -319.6601 H
1.2 Clearance of existing land, vegetation and buildings? Yes It is an existing operative mine having area under current mining is 16.16 ha. Additional requirement during modified mining plan period will be 20.78 Ha. Thus, total land use at the end of modified mining plan period will be 36.94 ha during plan period (at the end of 2020-21).The area mainly covered by dry deciduous scrub along with thorny sparse xerophytic vegetation which will require to be cleared during plan period. . The land is devoid of any major vegetation cover and appears barren.
1.3 Creation of new land uses? Yes During plan period following landuse will be developed: • Excavated area will be 36.94 Ha • Tar Roads/ mine road will be 5.80 Ha • Infrastructure (mine office, rest shelter etc.) is 0.20 Ha. • Natural Water Bodies is 2.25 Ha • Plantation & Greenbelt will be developed within 20.29 Ha. • Mineral Storage (Sub-grade/mineral area will be 2.50 Ha • Waste dump is 3.50 • Whereas, 288.8801 Ha area will remain undisturbed.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes It is existing operative mine, in which total 82 bore holes were sunk with few exploratory pits in past. Positive exploratory pits had been taken up in continuous mining operation.
1.5 Construction works? No This is existing operative mine all necessary facilities are already available hence, no construction activities involved.
1.6 Demolition works? No Since it is an existing operative mine and also the land is free from any structure and, therefore, no demolition work is envisaged.
1.7 Temporary sites used for construction works or housing of construction workers? No This is existing operative mine all necessary facilities are already available hence, no construction activities involved.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No No high rise buildings envisaged
1.9 Underground works including mining or tunnelling? No • It is existing operative Bauxite mineral mine. • No underground activities involved in the project. • The mining will be done by open cast semi mechanized method.
1.10 Reclamation works? Yes • The mining area covering 360.3601 ha shall be gradually developed and exploited for bauxite. • It is estimated that by the end of 19 years, entire mineable bauxite reserves will be exhausted. • The voids shall be used for rainwater storage except a low lying part, if any. This accumulated water shall be kept suitably fenced off all around. • There are plans for developing pisciculture and picnic spot. • It is proposed to create water storages bodies during the lease period.
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes • Production capacity 1,00,000 TPA of Bauxite. • The mining is being carried out by semi mechanized open cast method involving removal of top soil/Reject/overburden, shallow hole drilling, blasting, mechanized excavation combined with manual sorting. • Sorted material is directly fed to the user industries. Transportation are carried out by hydraulic excavator, loader and tippers.
1.14 Facilities for storage of goods or materials? Yes The Ore/OB/soil would be scrapped and stacked separately and will be utilized for plantation purpose. The stacking would be for a temporary duration. • The soil thus stacked will be used in re-vegetation/plantation schemes. • Still bottom has not reached in the proposed pits. Therefore waste generated during course of mining has been dumped separately. Dump height is 4 m to 5 m from the ground surface.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No No toxic effluent or solid waste is generated from the mines, quality of soil in the surrounding areas does not have any adverse impact. The soil has been scrapped and stacked separately and is being utilized for plantation purpose. The stacking would be for a temporary duration.
1.16 Facilities for long term housing of operational workers? Yes It is existing operative Bauxite mineral mine. At present following site facilities are available in the ML area. ? A mine office is already present in the lease area for keeping the records and supervision by mines manager. ? A rest shelter for resting of laborers during lunch interval. ? Drinking water facilities ? Canteen facilities ? A first aid to the injured. ? urinals
1.17 New road, rail or sea traffic during construction or operation? No Not Applicable. Existing facilities will be used.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable. Existing facilities will be used.
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? Yes Seasonal Kanakwati River is crossing from SW part of ML area it is corner of mining lease and away from current and proposed working however all precaution are being taken to avoid pollution of the river.
1.23 Abstraction or transfers of water from ground or surface waters? Yes The total of about 32 KLD water required for various Domestic, Dust suppression, Green belt and mining operation, Source: Existing water supply (through tankers). The source of water through existing water supply (tankers). However, in case of ground water utilization prior permission/NOC from CGWA will be obtained.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There is no changes/disturbance of water course due to mining in past and also in future. As the matter of fact the mining lease area of Bauxite Mine is part of seasonal drains. Wherever required, water diversion channel shall be constructed. Direct precipitation as well as catchment area water accumulates in drains passing through the ML area. There is no chance of disturbance of water course due to mining in the past and also in the future.
1.25 Transport of personnel or materials for construction, operation or decommissioning? No It is existing operative opencast semi-mechanized Bauxite mine in which local manpower already deployed from nearby villages. Thus, no transportation of personnel envisaged. Whereas, tippers of 10 Tonne capacity is used for transportation of minerals as well as waste within the lease area.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling works are envisaged during operation of mine. Post mining, mine land shall be duly reclaimed /rehabilitated as per Final Mine Closure Plan.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable.
1.28 Influx of people to an area in either temporarily or permanently? No Roha-Kotada-Nandra-Jarjok Bauxite Mine is being supervised and controlled by a team of technically and statutorily qualified personnel apart from the operating staff of skilled, semi-skilled and unskilled categories. Total 61 Manpower already involved mining operation. Thus, no additional influx of people either temporarily or permanently involved.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Total 360.3601 Ha Lease area comprises around 360.3601 Ha around Govt. waste land. No forest or agriculture land involved in the ML area.
2.2 Water (expected source & competing users) unit: KLD Yes The total of about 32 KLD Source: Existing water supplier through tankers
2.3 Minerals (MT) No Nil
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No It is existing operative mine, no construction activities involved.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Electricity- Daily power requirement will be 20-30 KW/day. Diesel requirement is being fulfilled from nearby diesel filling stations which have been required for machineries, instruments and transportation vehicles like excavators, dumpers/Tippers, dozers, etc. through contractors.
2.7 Any other natural resources (use appropriate standard units) Yes Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes One explosive Van of capacity 860 kg is being used. There will be no major storage of diesel which is being source from nearby diesel filling station.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No such substances or material is being used which cause changes in occurrence of disease or disease vectors. Proper housekeeping & sanitation is being maintained to keep the work places free from disease causing vectors. Water sprinkling carried out for dust suppression.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes GMDC has provided sufficient infrastructural resources to the surrounding villages owing to various developmental and welfare activities. • All villages are well connected by approach roads. • Water supply, transportation, educations and medical facilities are provided by GMDC to nearby villages. • A well-equipped ambulance is provided to the local community round the clock. • Provision of school bus for the children of employers is provided.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes 1. Topsoil (Alluvium M3): 14894 m3 Alluvium cover is available in the ML area. It is available in the form of overburden and inter-burden. The alluvium shall be removed separately and used for plantation. 2.Overburden (OB):79165 M3 Waste generated during course of mining has been dumped separately. Dump height is 4m to 5m from the ground surface. No backfilling performed due to non availability of matured space 3. Sub Grade:158069 M3 Waste in the form of mineral rejects is to be generated.
4.2 Municipal waste (domestic and or commercial wastes) Yes Domestic waste generated from mines office is being disposed to soak pit via septic tank. Commercial waste sold/disposed to authorized vendors.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used oil will be collected and disposed through authorized vendors.
4.4 Other industrial process wastes No There will be no other industrial process which will generate waste.
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment No No provision of STP, however negligible amount of domestic sludge generated from septic tank after long period which is easily decomposed.
4.7 Construction or demolition wastes No Not applicable
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Not applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emissions are generated from operation of HEMMs & transportation vehicles. Care is being taken to keep the emissions below standards by proper maintenance & regular monitoring.
5.2 Emissions from production processes Yes Particulate Matter emitted during drilling, blasting, Sizing with the help of rock breaker, Manual sorting and grading is being kept below the prescribed limits by adopting mitigating measures such as wet drilling, controlled blasting, water sprinkling on haul roads, development of greenbelt and plantation etc.
5.3 Emissions from materials handling including storage or transport Yes The loading of material and transportation will lead to generate dust pollutants. However, Systematic & scientific mining activities is being adopted. Periodical maintenance of HEMMs will be done regularly to control fugitive emissions. Water sprinkling during loading and unloading of excavated materials is regularly undertaken.
5.4 Emissions from construction activities including plant and equipment No Not applicable
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust will be generated during drilling, blasting, loading, unloading, handling and transportation of mined out materials. Since it is existing operative mine hence, no construction activities envisaged. There is no possibility of any odour generation.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise generated due to mining machineries during mining operation. Personal Protective Equipment (PPE) like ear muffs/ear plugs is being provided to the workers including operators of mining machinery. Periodic Noise monitoring and maintenance of mining equipment is being carried out to keep noise level within permissible limits.
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition No Not applicable
6.4 From blasting or piling Yes Controlled blasting by use of latest blasting techniques is being adopted to keep noise level within permissible limits. Plantation at designated area will serve as a noise barrier and minimize the propagation of noise. Workers working in close vicinity of machines are provided with personal protective equipment (PPEs).
6.5 From construction or operational traffic Yes Operation of dumpers and other machinery may generate noise. However noise level is being maintained within prescribed limits by adopting site specific mitigation measures.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not Applicable since no hazardous material involved during mining process except the explosive which stored and handled as per the permission letter of controller of explosive and will not contaminate neither the land nor water bodies.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage is being treated in Septic tank followed by Soak Pit. Neither any chemical nor toxic effluents are discharged from the area nor any toxic substance used in the mining or allied activities.
7.3 By deposition of pollutants emitted to air into the land or into water Yes All the emissions from the Mine operations are controlled and in compliance with CPCB/SPCB norms
7.4 From any other sources No Not envisaged.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not envisaged.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No The extent of accident is expected to be nil because of adequate precautions and safety measures such as properly designed blasting by effective stemming and use of optimum charge/delay detonators. Fire extinguishers shall be provided in all HEMMS explosive magazine, workshop and mine office. Explosive are handled under the supervision of licensed person. DGMS & Controller of Explosive operational guidelines is followed
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Seismically, this area is categorized under Zone-V as per IS-1893 (Part-1)-2002.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes GMDC was established in 1963, the company has done lot of activities for benefit and development of society in the area. The activities of the company given in brief: • Water Resource Management • Health care program • Women empowerment • Education • Infrastructure development • Skill development programme
9.2 Lead to after-use of the site, which could have an impact on the environment Yes Post mining, once minerals is excavated, the mined out area shall use for rainwater storage. This accumulated water shall be kept suitably fenced off all around. Thus, water storage bodies will be created. There are plans for developing pisciculture and picnic spot. At the end of lease period 35 Ha. land will be under plantation and green belt.
9.3 Set a precedent for later developments Yes This is an existing operative mine project has set precedence in the area for environmental preservation and socio-economic improvement.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No There are no other existing or planned projects adjoining to existing Bauxite mine hence, no direct cumulative impact are envisaged. GMDC already adopted site specific mitigation measures in line with existing EC conditions.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Wetlands - None within 15 km radius. Coastal Zone - None within 15 km radius. Mountains –None within 15 km radius.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None within 15 km radius
4 Inland, coastal, marine or underground waters No None within 15 km radius
5 State, National boundaries No None within 15 km radius
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No None within 15 km radius
7 Defence installations No None within 15 km radius
8 Densely populated or built-up area Yes Naredi-3.15 Km, WSW
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Rural Hospital, Abdasa -30.31 Km, W GMDC First Aid Centre -2.45 Km, NE Temple-Kotada Roha -2.33 km, ESE
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes • Kankavati Nadi (Near-Kolada Village) Adjacent on SW of corner site. • Balachod Canal-6.19 km, WNW • Naira River-6.12 km, WNW Forests – • Jungle (Nr.-Naredi Village) Adjacent • Khirsara RF 5.14 km, ESE • Jarjok RF 1.68 km, S • Bhittara RF 3.4 km, SSW • Makda RF 4.17 km SSE • Moti Maun RF 5.9 km, SE • Roha RF 0.56 km, E
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None within 15 km radius
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Seismically, this area is categorized under Zone-V as per IS-1893 (Part-1)-2002.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
5Uploaded Approval of mining PlanN/A
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1. Eds Reply LetterThe correction have been made as per the instruction received 16 Mar 2021
2.NAPP needs to submit the latest certified Compliance report and latest past production details certified by DMG. 10 Mar 2021
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRoha Kotara Nandra Jarjok Bauxite Mining Project (Mine Lease, Area – 360.36 Ha. & Production Capacity 1,00,000 TPA) 17 Apr 2019
2.NADeferred 22 Nov 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantChirag
DesignationGeneral Manager (Environment)
Name of Company (Applicant Name should not be given here)GUJARAT MINERAL DEVELOPMENT CORPORATION LIMITED