(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Pigments & Dyes Manufacturing Unit
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/IND2/91048/2019
Project Cost 1000 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 1200 MT/Month ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSURVEY NO. 202 / 6 PAIKY SOKHADA, KHAMBHAT-388620, ANAND, GUJARAT
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.SURVEY NO. 202 / 6 PAIKY
Town / VillageLunej
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratAnandKhambhat
10.
Nearest railway station along with distance in kms khambhat, 7 km
Nearest airport along with distance in kms Vadodara, 83 km
11. Nearest Town/City/District Headquarters along with distance in kms Khambhat , 7 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) khambhat Nagar Palika, khambhat, Anand, Gujarat
13. Name of the Applicant Jyantikumar
14. Registered Address Survey No. 202/6/p, sokhda, khambhat,, anand, gujarat
15.
Address for correspondance:
Name of the Company COSMIC PIGMENTS AND INTERMEDIATES
Name of the Applicant Jyantikumar
Designation (Owner/ Partner/ CEO) Partner
Pin code 388620
E-mail cosmic.ec2019@gmail.com
Telephone No. 0261-2413801
Fax No. 0261-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No --
1.2 Clearance of existing land, vegetation and buildings? No --
1.3 Creation of new land uses? No The project site is located on level ground, which does not require any major land filling for area grading work.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No --
1.5 Construction works? Yes For detail Please refer Annexure – II
1.6 Demolition works? No --
1.7 Temporary sites used for construction works or housing of construction workers? No --
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes For detail Please refer Annexure – II
1.9 Underground works including mining or tunnelling? No --
1.10 Reclamation works? No --
1.11 Dredging? No --
1.12 Offshore structures? No --
1.13 Production and manufacturing processes? Yes For detail Please refer Annexure -III
1.14 Facilities for storage of goods or materials? Yes Area for storage tank farm, raw materials and finished products will be developed for the proposed project. For detail Please refer Annexure -IV
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Facilities for treatment or disposal of effluents are given as Annexure – V & Facilities for treatment or disposal of hazardous waste is given as Annexure – VI.
1.16 Facilities for long term housing of operational workers? No The unit shall be running round the clock. The operational staff will be recruited locally and working in shift, hence no housing for the operational workers.
1.17 New road, rail or sea traffic during construction or operation? No There will not be any new road/rail or sea traffic during construction or operational phase.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No --
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No --
1.20 New or diverted transmission lines or pipelines? No There will not be said work at the site.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No --
1.22 Stream crossings? No --
1.23 Abstraction or transfers of water from ground or surface waters? Yes Raw water will be sourcing from farming Well. Estimated.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No --
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes By road only
1.26 Long-term dismantling or decommissioning or restoration works? No --
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No --
1.28 Influx of people to an area in either temporarily or permanently? No During construction work local workers will be hired. In Operational phase 50 no. of workers/staff will be required for the proposed project.
1.29 Introduction of alien species? No --
1.30 Loss of native species or genetic diversity? No --
1.31 Any other actions? No --
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No --
2.2 Water (expected source & competing users) unit: KLD Yes Water Source = Ground water Water balance is given as Annexure – VII
2.3 Minerals (MT) No --
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction materials, like steel, cement, crushed stones, sand, rubble, etc. required for the project shall be procured from the local market of the region.
2.5 Forests and timber (source – MT) No --
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Fuel : Briquette : 4000 Kg/Hrs Natural gas : 960 C.Mt/Hrs /HSD for Dg set: 100 lit/Hrs Energy : 1200 KWA from MGVCL 250 KWA × 2 Nos. = 500 KWA from D.G. Set (Emergency power back up)
2.7 Any other natural resources (use appropriate standard units) No --
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes For details please refer Annexure – IX
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No --
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Direct/Indirect employment
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No --
3.5 Any other causes No --
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No --
4.2 Municipal waste (domestic and or commercial wastes) No --
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Facilities for treatment or disposal of effluents are given as Annexure – V & Facilities for treatment or disposal of hazardous waste is given as Annexure – VI.
4.4 Other industrial process wastes Yes Please refer Annexure –VI
4.5 Surplus product No --
4.6 Sewage sludge or other sludge from effluent treatment Yes Please refer Annexure – VI
4.7 Construction or demolition wastes No --
4.8 Redundant machinery or equipment No --
4.9 Contaminated soils or other materials No --
4.10 Agricultural wastes No --
4.11 Other solid wastes Yes Please refer Annexure –VI
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes For details Please refer Annexure – VIII
5.2 Emissions from production processes Yes Stack emission will remain within the norms prescribed by CPCB. Please refer Annexure – VIII
5.3 Emissions from materials handling including storage or transport Yes For details Please refer Annexure – VIII
5.4 Emissions from construction activities including plant and equipment No --
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Due to construction & vehicle movement dust emission is likely to occur.
5.6 Emissions from incineration of waste No --
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No --
5.8 Emissions from any other sources No --
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The Noise level will be within the prescribed limit. Adequate preventive & control measures will be taken at noisy area. No significant noise, vibration or emission of light & heat from the unit.
6.2 From industrial or similar processes Yes -do-
6.3 From construction or demolition No --
6.4 From blasting or piling No --
6.5 From construction or operational traffic No --
6.6 From lighting or cooling systems Yes Adequate Lighting is provided in unit and also local ventilation system is provided.
6.7 From any other sources No --
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes For detail please refer Annexure – IX
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No --
7.3 By deposition of pollutants emitted to air into the land or into water No --
7.4 From any other sources No --
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No --
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes For detail please refer Annexure – IX
8.2 From any other causes Yes For detail please refer Annexure – X
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No --
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes For detail please refer Annexure – XI
9.2 Lead to after-use of the site, which could have an impact on the environment No --
9.3 Set a precedent for later developments No --
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No --
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No protected area within 5 km from the proposed project boundary
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Sabarmati river is around 24 Km away from the project site. And costal zone is around 15.02 Km away from the project site.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No No protected area or sensitive species within 5 km from the proposed project boundary.
4 Inland, coastal, marine or underground waters No --
5 State, National boundaries No NA
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No NA
7 Defence installations No NA
8 Densely populated or built-up area No --
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No NA
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No NA
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No NA
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No NA
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Query Reply- 21-01-2019
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 21 Jan 2019
2.NAPlease provide the following information: (1) Provide project name (not PPs name nor company name) in S.No. 1 of Form 1. (2) Please provide the copy of land allotted in the name of PP and permission for its industrial use. (3)Please confirm whether the unit 2 and Unit 1 are adjacent units. And if so, justification for applying separately. 10 Jan 2019
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantJyantikumar
DesignationPartner
Name of Company (Applicant Name should not be given here)COSMIC PIGMENTS AND INTERMEDIATES
AddressSurvey No. 202/6/p, sokhda, khambhat,, anand, gujarat