APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | M/s Ishanga Lifescience Pvt Ltd | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/GJ/IND2/82494/2018 | Project Cost | 1165.0 lacs | |
| 2. | |
S. No. in the schedule | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 193, 0.6378 ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 193 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Survey No.: 310/1/2/3, Madhvas, Tal: Kalol, Dist: Panchmahal | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Survey No. 310/1/2/3 | Town / Village | Madhvas | State of the project | Gujarat | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Gujarat | Panchmahal | Kalol | (2.) | Gujarat | Panchmahal | Kalol | | 10. | |
Nearest railway station along with distance in kms | Vadodara, 40.0 km | Nearest airport along with distance in kms | Vadodara, 35.8 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Kalol , 4.03 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | survey no. 310/1/2/3, Madhvas, Tal: Kalol, Dist.: Panchmahal - 389003 | | 13. | Name of the Applicant | RAMLAL | | 14. | Registered Address | Survey no.: 310/1/2/3, Madhvas, Tal: Kalol, Dist.: Panchmahal | | 15. | |
Address for correspondance: | Name of the Company | ISHANGA LIFE SCIENCE | Name of the Applicant | RAMLAL | Designation (Owner/ Partner/ CEO) | Director | Pin code | 389350 | E-mail | ishanga123@yahoo.com | Telephone No. | 02676-223702 | Fax No. | 02676- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Permanent land will be utilized for proposed activity
located at Madhvas village. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | It is Non- agricultural land | 1.3 | Creation of new land uses? | Yes | Land of non agricultural will be used for manufacturingof proposed products. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Already done | 1.5 | Construction works? | Yes | New construction will be carried out. | 1.6 | Demolition works? | Yes | Part of existing structure will be modified. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Local construction workers will be hired. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Plant layout is attached as Annexure: III. | 1.9 | Underground works including mining or tunnelling? | No | No such underground activity is involved. | 1.10 | Reclamation works? | No | Not Required. | 1.11 | Dredging? | No | Not Required. | 1.12 | Offshore structures? | No | Not Required. | 1.13 | Production and manufacturing processes? | Yes | Production capacity is attached as Annexure: IV and manufacturing process is attached as Annexure: VI. | 1.14 | Facilities for storage of goods or materials? | Yes | Proper facility for storage of raw material and finished goods will be provided in the unit. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Details of facilities for treatment of liquid effluent are given in Annexure: VII. Hazardous waste details attached as Annexure: XI. | 1.16 | Facilities for long term housing of operational workers? | No | Plot will be utilized for industrial purpose only. | 1.17 | New road, rail or sea traffic during construction or operation? | No | This is a private land. Road infrastructure is well developed. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable | 1.20 | New or diverted transmission lines or pipelines? | No | There will not be any said work at the site. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | 1.22 | Stream crossings? | No | No such activity is involved in the proposed project. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | The water will be taken from Bore-well. Necessary permission will be obtained. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | There will be routine movement of construction material, labor and raw materials to the site by road trucks. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | The proposed activity will be carried out in existing premises. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Construction debris will be used for foundation and road making within the plot. | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Local people will be employed for proposed activity | 1.29 | Introduction of alien species? | No | No such activity will be associated with the expansion project. | 1.30 | Loss of native species or genetic diversity? | No | No such activity is involved which can leads to loss of native species or genetic diversity. | 1.31 | Any other actions? | No | Not required other action | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | It is private & Non agricultural land. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water consumption and waste water generation detail is attached as Annexure: VII.
Source : Own borewell | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Various construction materials will be required in small quantity.
MATERIALS QUANTITY
Brick 1,20,000 Nos
Cement 6000 Nos
Sand 1000 MT
Steel 75 MT | 2.5 | Forests and timber (source – MT) | No | No forest and timber products are used. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Fuel and Energy consumption detail is attached as Annexure: VIII. | 2.7 | Any other natural resources (use appropriate standard units) | No | No other natural resources will be used. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | List of hazardous raw material is given in Annexure-XI. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | New employment will be formed. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | There will be no such effects due to the new project. | 3.5 | Any other causes | No | None | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | No such waste will be generated from the proposed project activity. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Some municipal waste will be generated. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Detail of Hazardous waste management attached as Annexure: XI. | 4.4 | Other industrial process wastes | No | No such waste will be generated. | 4.5 | Surplus product | No | No such waste will be generated. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sewage is diverted to soak pit and ETP sludge is disposed off to landfill site. | 4.7 | Construction or demolition wastes | No | ----- | 4.8 | Redundant machinery or equipment | No | All equipments will be newly purchased. | 4.9 | Contaminated soils or other materials | No | There will be no contamination to soils. Entire open space will be made RCC. | 4.10 | Agricultural wastes | No | No any agricultural waste will be generated. | 4.11 | Other solid wastes | No | Other solid waste will be disposed off as per guidelines. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Flue gas emission is attached as Annexure: IX. | 5.2 | Emissions from production processes | Yes | Detail of process gas emissions is attached as Annexure-X. | 5.3 | Emissions from materials handling including storage or transport | Yes | Details are given in Annexure –X. | 5.4 | Emissions from construction activities including plant and equipment | No | Emissions from the cement mixers will be controlled. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | All the raw materials and solvents will be handled in closed conditions. | 5.6 | Emissions from incineration of waste | No | There is no incinerator in the premises | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable, since burning of waste will not be practiced. | 5.8 | Emissions from any other sources | No | No other emissions will be observed. | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | No significant noise, vibration or emission of light & heat from the unit. The noise level will be within the prescribed limit. | 6.2 | From industrial or similar processes | No | Noise proof equipments will be used for industrial processes. | 6.3 | From construction or demolition | No | ----- | 6.4 | From blasting or piling | No | No such activity will be carried out. | 6.5 | From construction or operational traffic | Yes | Adequate measures will be taken by the unit. | 6.6 | From lighting or cooling systems | No | ----- | 6.7 | From any other sources | No | Not applicable. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Proper storage facility for hazardous chemicals and waste will be provided in the unit. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Sewage effluent will be disposed into soak pit system.
Industrial effluent will be treated & recycle back in the unit. Unit will achieve zero liquid discharge. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Process emission details is attached as annexure- X. | 7.4 | From any other sources | No | No other sources will be there. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | There will not be any long term build up of pollutants in the environment from these sources. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Risk assessment will be carried out. | 8.2 | From any other causes | No | No risk of accident from any other causes. Adequate precautionary measure will be taken by the unit. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Structures will be made earthquake proof and no possibility of flood is identified. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Employment generation, exposure to new technology, skill up gradation, Local ancillary development like rewinding of motors, maintenance people, wiremen, etc will be increased. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | There will be no significant impact on environment. | 9.3 | Set a precedent for later developments | No | The project is conventional one. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | There will be no cumulative effect from the proposed expansion project. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No protected area within 10 km from the proposed project boundary. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | ----- | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | ----- | 4 | Inland, coastal, marine or underground waters | No | ---- | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not Applicable | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | Yes | Kalol approximate distance is 4 km | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospital- Approximate 3.8 Km
School-Approximate- 0.3 km | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | ----- | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 29 Oct 2018 | 2. | NA | Please provide the following information:
(1) Availability of land with the PP.
(2) Permission from the concerned authority for setting up industry in the proposed area/conversion of land for industrial purpose.
(3) Requirement of water, source and Effluent treatment plan | 17 Oct 2018 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | RAMLAL | Designation | Director | Name of Company (Applicant Name should not be given here) | ISHANGA LIFE SCIENCE | Address | Survey no.: 310/1/2/3, Madhvas, Tal: Kalol, Dist.: Panchmahal |
|
|