APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Establishment of Synthetic organic chemicals and Intermediates by Bhimani Dye chem industries located at Plot No. 02,S.No. 316, Dhanot,Ta - Kalol, Dist - Gandhinagar
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/IND2/81447/2018
Project Cost 450 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 225 MT /M ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot No. 02, S.No. 316, At - Dhanot, Ta - Kalol, Dist - Gandhinagar
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot No.02, S.No. 316
Town / VillageDhanot
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratGandhinagarKalol
10.
Nearest railway station along with distance in kms Kalol, 10 km
Nearest airport along with distance in kms Ahmedabad, 34 km
11. Nearest Town/City/District Headquarters along with distance in kms Chhatral , 3.0 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Dhanot
13. Name of the Applicant Bhavin
14. Registered Address Plot no. 2, Survey No. 316, Opp. Dharti Industrial Estate, Ta: Kalol, Gandhinagar
15.
Address for correspondance:
Name of the Company BHIMANI DYECHEM INDUSTRIES
Name of the Applicant Bhavin
Designation (Owner/ Partner/ CEO) Partner
Pin code 380006
E-mail bhavin@bhimanigroup.com
Telephone No. 079-26575474
Fax No. 079-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes This is a Proposed unit & There will be minor change in land use pattern of the project area.
1.2 Clearance of existing land, vegetation and buildings? No This is Non agriculture land.
1.3 Creation of new land uses? No Not applicable because this plot area is sufficient for the proposed manufacturing activity.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No We will do the soil testing for pre construction investigation.
1.5 Construction works? Yes Construction Activity for the proposed project will be carried out within Project site.
1.6 Demolition works? No Not applicable
1.7 Temporary sites used for construction works or housing of construction workers? No not required because local workers will be hired for construction activity.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Not Required.
1.9 Underground works including mining or tunnelling? No Not Required.
1.10 Reclamation works? No Not Required
1.11 Dredging? Yes required for construction work and Effluent Treatment Plant.
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? No All steps for control / mitigation of air pollution, water pollution and safe handling & disposal of all types of hazardous waste have been / will be considered. Therefore, there will be no significant adverse impact on topography, land use pattern and water bodies. Manufacturing process of each product with mass Balance & Chemical Reaction is attached herewith as Enclosure: 09
1.14 Facilities for storage of goods or materials? No we will provide adequate facility for storage of Goods and materials
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No We will install Effluent treatment plant for treatment & also provide proper hazardous waste storage area.
1.16 Facilities for long term housing of operational workers? No Not Applicable since local workers will be employed; no housing facilities will be required.
1.17 New road, rail or sea traffic during construction or operation? No Not applicable.Not applicable. Road Traffic will slightly increase during installation of Plant Machineries and operational activities. Traffic due to the installation of Plant Machineries will be limited to the construction period. After that we will use Existing infrastructure Road Traffic will slightly increase
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new road, rail, air/waterborne or other transport infrastructure including new or altered routes and stations, ports, airports are envisaged. Existing road, rail system is adequate for the proposed Project.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Not Applicable
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? No Land use pattern will not be Impacted.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable.
1.28 Influx of people to an area in either temporarily or permanently? No Not applicable because local people will be given preference for almost all the temporary as well as permanent jobs
1.29 Introduction of alien species? No Not Applicable.
1.30 Loss of native species or genetic diversity? No Not Applicable.
1.31 Any other actions? No Not Applicable.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Proposed project is on non agriculture land.
2.2 Water (expected source & competing users) unit: KLD Yes Water required for the operational phase will be drawn from Water Tanker.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Eco friendly construction materials will be used
2.5 Forests and timber (source – MT) No Not applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Source of the electricity will be From UGVCL
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Hazardous chemicals will be handled as per the manufacture, storage and import of hazardous chemical rules, 2000. Our industry will carry out risk assessment study and also as per the requirement onsite/ offsite emergency plan as well as disaster management plan will be prepared to avoid such incidents.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No All the Hazardous chemicals will be handled as per the manufacture, storage and import of hazardous chemical rules, 2000. Therefore disease occurrence pattern will not be changed and also no disease vectors will be affected. Further to the same no ponding of wastewater generated from the proposed activities will be carried out, therefore there is no possibility of waterborne disease.
3.3 Affect the welfare of people e.g. by changing living conditions? No Not Applicable.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable.
3.5 Any other causes No Not Applicable.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Required.
4.2 Municipal waste (domestic and or commercial wastes) No Not Applicable.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes As per HWM Rules, 2016, details of hazardous waste generated from the unit are given in Enclosure: 08
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product Yes Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Domestic effluent/ sewage generated will be disposed off through septic tank/ soak pit system. Therefore, no sewage sludge will be generated.
4.7 Construction or demolition wastes No Construction Waste will be used in land fill within our premises.
4.8 Redundant machinery or equipment No Not Applicable.
4.9 Contaminated soils or other materials No Not Applicable.
4.10 Agricultural wastes No Not Applicable.
4.11 Other solid wastes No Not Applicable.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Pl. Refer Enclosure No.:12
5.2 Emissions from production processes Yes Pl. Refer Enclosure No.:12
5.3 Emissions from materials handling including storage or transport No Not applicable because all the Raw materials, products and hazardous chemicals will be stored and transported by closed containers system.
5.4 Emissions from construction activities including plant and equipment Yes Due to construction activities concentration of suspended particular (SPM) in ambient air slightly increase for that particular time.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No All necessary measure will be taken for prevention of odour. Construction dust will be of Negligible .However Nevertheless, water spraying will Be carried out during construction Activities to nullify effects of such dusting
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No waste will require to be burnt in open air.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The overall noise levels during operation of the Individual machinery are difficult to predict. Since it requires its details types Number and location of the machinery. Even though we ensure about provision of adequate sound enclosure to all The equipment and machineries generating high noise.
6.2 From industrial or similar processes Yes Sources of noise are Boiler, Pumps and Motors, Machineries, etc. All the equipment in the proposed unit will be designed and operated to have the noise level not exceeding 75 -80 dB (A) at a distance of 1.5 m from the equipment. Also all the measures will be taken to limit the noise levels at the plant boundary within the stipulated limits.
6.3 From construction or demolition Yes During various construction activities, noise will slightly increase for that particular time.
6.4 From blasting or piling No Not Applicable because no such activities will be carried out.
6.5 From construction or operational traffic Yes Due to additional traffic, ambient noise level will be slightly increased.
6.6 From lighting or cooling systems Yes As far as noise is concerned, near cooling system noise level is around 80-85 dB (A). However, earplugs and earmuffs have been provided to the workers working in such areas.
6.7 From any other sources No None
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Hazardous materials will be properly handled, stored and used. Thus, there will not be any possibility of spillage of the hazardous materials. However, Risk Assessment study will be carried out and based on the same on site / off site emergency Plan will be prepared.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Domestic Effluent goes to soak pit via septic tank and industrial effluent send to ETP and finally discharge to Chhatral Enviro management System Pvt. Ltd For Spray Drying to achieve zero discharge.
7.3 By deposition of pollutants emitted to air into the land or into water No No major impact is anticipated by deposition of pollutants emitted to air into the land or into water due to all the necessary Air Pollution Control Measures to be adopted for controlling the air pollution within the limits specified by State Pollution Control Board.
7.4 From any other sources No None.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No major impact is anticipated because of the fact that all the necessary steps are planned to control air pollution, water pollution and noise level within the Gujarat Pollution Control Board norms. Also, each type of hazardous wastes will be managed as per Hazardous waste Management Rules, 2016.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No During the operation Phase, no major risk of accidents is anticipated because of the fact that a risk assessment study will be carried out and all recommended safety measures would be incorporated in the plant.
8.2 From any other causes No None.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Floods are not likely to affected unit since water body are far away As per IS standards, seismic forces have been considered for the construction of proposed structures/ buildings.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No No impact on the surrounding environment is envisaged due to infrastructure and housing facilities of the proposed expansion activities because of the following fact. • Proposed project will be carried out within the premises • Power demand will be met through UGVCLl In case of power failure DG Set will be used. • Adequate ETP is installed to achieve prescribed norms. • Proper solid waste storage area is provided having RCC roofing and covered with roof.
9.2 Lead to after-use of the site, which could have an impact on the environment No There will be no after use of site which could have and impact on the environment
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not Applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No No national or state boundary within 15 Km Radius from project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area No 2.5 km away from the project site
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Not Applicable
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 22 Oct 2018
2.NAAs such, being the the project location in the Industrial area, the proposal needs to be apprised by the SEAC/SEIAA. Please also provide the copy of land allotment letter 09 Oct 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantBhavin
DesignationPartner
Name of Company (Applicant Name should not be given here)BHIMANI DYECHEM INDUSTRIES
AddressPlot no. 2, Survey No. 316, Opp. Dharti Industrial Estate, Ta: Kalol, Gandhinagar