APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Kandla- Viramgam-Gandhinagar-Sanand Section of Kandla Gorakhpur Pipeline | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/GJ/IND2/114428/2019 | Project Cost | 14000 lacs | |
| 2. | |
S. No. in the schedule | 6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 5.10 MMTPA ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | Yes | a) | Protected areas notified under the wildlife (Protection) Act, 1972 | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Pipeline from Kandla | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Plot /khasra nos are not available now as cadastral details are awaited and actual details can be provided only after acquisition of Right of way for pipeline laying as per P&MP Act | Town / Village | kandla, Kidana,Goraiya
Viramgam | State of the project | Gujarat | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Gujarat | Morbi | Halvad | (2.) | Gujarat | Morbi | Maliya | (3.) | Gujarat | kutch | Bhachau | (4.) | Gujarat | kutch | Anjar | (5.) | Gujarat | kutch | Gandhidham | (6.) | Gujarat | Mahesana | Kadi | (7.) | Gujarat | Gandhinagar | Kalol | (8.) | Gujarat | Gandhinagar | Gandhinagar | (9.) | Gujarat | Ahmedabad | Viramgam | (10.) | Gujarat | Ahmedabad | Sanand | (11.) | Gujarat | Surendranagar | Dhrangadhra | (12.) | Gujarat | Surendranagar | Dasada | | 10. | |
Nearest railway station along with distance in kms | Gandhidham, 13 km | Nearest airport along with distance in kms | Kandla, 22 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Gandhidham , 17.6 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | C/o IndianOil Corporation Near fore shore terminal old kandla District Kachch | | 13. | Name of the Applicant | Ram | | 14. | Registered Address | C/o IndianOil Bhawan,A-1, Udyog Marg | | 15. | |
Address for correspondance: | Name of the Company | IHB LIMITED | Name of the Applicant | Ram | Designation (Owner/ Partner/ CEO) | Chief Operating Officer | Pin code | 201301 | E-mail | coo@ihbl.in | Telephone No. | 120-2448716 | Fax No. | 120- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | Yes | Status | Application for Forest Clearance yet to be submitted | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | Yes | Status | Application for Wildlife Clearance yet to be submitted | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | Yes | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | Yes | Area of Forest land Involved (hectares) | 0.0454 ha. | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The Pipeline RoW shall be restored to its original condition for agricultural purpose, after laying of pipeline | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Temporary clearance of standing crops is expected during the project execution phase. Compensation will be paid for crops by Competent Authority, as per Petroleum and Mineral Pipeline Act 1962. Permanent Structures and Buildings will not be affected. | 1.3 | Creation of new land uses? | No | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | During pre project phase, Soil testing and Soil Investigation Survey were carried out for entire pipeline stretch | 1.5 | Construction works? | Yes | Involves Civil, Mechanical, Electrical, Telecom and Instrumentation works, SCADA at Stations along with laying of Cross Country Pipeline. | 1.6 | Demolition works? | No | Nil | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary spread camps used for housing contract workers during pipeline laying activity. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Buildings/Structures shall come at Stations, SV locations at defined intervals en-route the pipeline stretch and residential colony at originating and terminal station | 1.9 | Underground works including mining or tunnelling? | No | Only underground laying of pipelines at a depth of 1.2 to 1.5 mtr along with crossings of roads, rivers through HDD technique is envisaged. | 1.10 | Reclamation works? | No | Nil | 1.12 | Offshore structures? | No | Nil | 1.13 | Production and manufacturing processes? | No | No Manufacturing or Production activity is involved. Only transportation of LPG through pipeline is envisaged. | 1.14 | Facilities for storage of goods or materials? | No | A small storage for spares & equipment maintenance at station | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | Negligible amount of solid waste and residue if any shall be generated. Soak pit & septic tank will be provided for disposal of waste as per Statutory guidelines | 1.16 | Facilities for long term housing of operational workers? | Yes | Residential facility would be constructed for operating workers. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Nil | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Nil | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Nil | 1.20 | New or diverted transmission lines or pipelines? | No | Nil | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Nil | 1.22 | Stream crossings? | Yes | Major river crossings are to be executed through HDD technique, which does not disturb the banks of the rivers/streams. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Pipeline construction usually does not require large quantities of water. The required quantity shall be arranged through available means. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Nil | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Through road-worthy transport for construction purpose. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Nil | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Nil | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Temporary influx of small number of man power is envisaged during construction phase as skilled man power will come from outside. | 1.29 | Introduction of alien species? | No | Nil | 1.30 | Loss of native species or genetic diversity? | No | Nil | 1.31 | Any other actions? | No | Nil | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The pipeline will be laid mainly through agricultural fields. After construction phase of short duration, land will be restored again and handed over to the land owner for carrying out agricultural activity. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | During construction phase, there will be requirement of 20 KLD of water, which will be met by tanker supply. During operation phase, water requirement will be 5 KLD and will be met through tanker supply. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Locally available construction materials like sand, bricks, aggregates will be used for construction activity. | 2.5 | Forests and timber (source – MT) | No | Nil | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power requirement is planned to be met by Gujarat Electricity Board’s Power Supply. | 2.7 | Any other natural resources (use appropriate standard units) | No | Nil | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Liquefied Petroleum Gas(LPG) will be transported through this pipeline. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Nil | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Nil | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Nil | 3.5 | Any other causes | No | Nil | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Nil | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Very small quantity of domestic waste will be generated during construction period of pipeline. Septic Tank followed by Soak Pit will be provided at workers camp. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Nil | 4.4 | Other industrial process wastes | No | Nil | 4.5 | Surplus product | No | Nil | 4.6 | Sewage sludge or other sludge from effluent treatment | No | Nil | 4.7 | Construction or demolition wastes | No | A small quantity of construction waste, which shall be disposed- off in environment friendly manner | 4.8 | Redundant machinery or equipment | No | Nil | 4.9 | Contaminated soils or other materials | No | Nil | 4.10 | Agricultural wastes | No | Nil | 4.11 | Other solid wastes | No | Nil | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | During construction minor emissions are envisaged from equipments/machineries used for construction activity, DG sets. DG sets will be installed for usage during power breaks and the emission will be within the permissible limit and used through sufficient height of stacks | 5.2 | Emissions from production processes | No | No processing is involved in the production stage. | 5.3 | Emissions from materials handling including storage or transport | No | Nil | 5.4 | Emissions from construction activities including plant and equipment | Yes | There will be negligible quantity of emission from the portable DG sets, machineries used during construction activity. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | During construction phase, very nominal amount of dust is likely to be generated. Adequate preventive measures such as water sprinkling will be taken to minimize dust generation. | 5.6 | Emissions from incineration of waste | No | Nil | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Nil | 5.8 | Emissions from any other sources | No | Nil | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Very minimal noise will be generated during construction phase due to running of equipment. It would be reduced by controlling the equipment speed and use of PPEs. | 6.2 | From industrial or similar processes | No | No industrial process is involved. The project involves only transportation of LPG. | 6.3 | From construction or demolition | Yes | During construction phase, small noise will be generated due to movement of machinery. Due to arc welding, some light may be emitted. Overall pollution load is expected to remain negligible and for a short duration. | 6.4 | From blasting or piling | Yes | Piling foundation is limited to the construction of building within the station premises. Quantity of piling envisaged is less and hence, generation of noise will be negligible. During pipeline laying, some rocky terrain may require blasting for trenching purpose. | 6.5 | From construction or operational traffic | Yes | Small levels of noise will be increased only during construction phase by vehicular traffic. PUC certified vehicles would be used for construction and speed limits would be adhered. No traffic movement is expected during operating phase and PPEs will be used. | 6.6 | From lighting or cooling systems | No | Nil | 6.7 | From any other sources | No | Nil | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Minimal risk is associated with transportation of LPG as pipeline system is a closed loop. However, risk study will be carried out for the project. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Nil | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Nil | 7.4 | From any other sources | No | Nil | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Nil | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Risk assessment study shall be carried out for the project as applicable. The facilities will confirm to international standards and also to the standards stipulated by OISD, PESO and other statutory authorities regarding safety of LPG pipeline installation against the fire, explosion etc. | 8.2 | From any other causes | No | Nil | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Facilities will be designed in accordance with the national & international standards & codes of practices factoring into probable natural disasters, thus safeguarding men and environment against any possible mishap. Pipeline is proposed to be laid through HDD technique across major rivers, which minimizes the risk of erosion of banks & exposure of pipeline. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | LPG availability in the region would help in meeting demand of LPG. This would also help in realize Government of India’s dream project of making clean and environmental friendly fuel available to every domestic household in the country. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | After the pipeline is laid, the land is restored back to its original condition and the land is fit for cultivation purpose. | 9.3 | Set a precedent for later developments | No | Nil | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Nil | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | The proposed LPG pipeline shall pass through Wild Ass Sanctuary for about 10.77 km length. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | The proposed LPG pipeline shall pass through Wild Ass Sanctuary and forest area. Detail will be provided in EIA report | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | The proposed LPG pipeline shall pass through Wild Ass Sanctuary and forest area. Detail will be provided in EIA report | 4 | Inland, coastal, marine or underground waters | Yes | Detail of river/canal crossings through HDD without affecting its course. Details will be provided in EIA report. | 5 | State, National boundaries | Yes | The pipeline lies in Gujarat State | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Nil | 7 | Defence installations | No | Nil | 8 | Densely populated or built-up area | Yes | Details will be provided in EIA report. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Details will be provided in EIA report. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Details will be provided in EIA report. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Nil | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Adequate safeguards will be incorporated in the design of the facilities to withstand natural hazards | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Ram | Designation | Chief Operating Officer | Name of Company (Applicant Name should not be given here) | IHB LIMITED | Address | C/o IndianOil Bhawan,A-1, Udyog Marg |
| |
|