APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Environmental Clearance for propose Synthetic Organic Chemicals and Pesticides manufacturing unit at GIDC, Dahej | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/GJ/IND2/114411/2019 | Project Cost | 1875 lacs | |
| 2. | |
S. No. in the schedule | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 2350 MTPA ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 1.945 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | D-2/CH-51, GIDC Dahej – II, Village - Dahej, Tehsil - Vagra, Dist. - Bharuch, Gujarat | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | D-2/CH-51, GIDC Dahej – II | Town / Village | Dahej | State of the project | Gujarat | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Gujarat | Bharuch | Vagra | | 10. | |
Nearest railway station along with distance in kms | Bharuch Railway Station, 39.13 km | Nearest airport along with distance in kms | Vadodara Airport, 91.34 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Dahej , 4.02 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Dahej village – 4.02 km in West direction | | 13. | Name of the Applicant | Sonir | | 14. | Registered Address | D-2/CH-51, GIDC Dahej - II | | 15. | |
Address for correspondance: | Name of the Company | JEEVAN CHEMICALS PVT. LTD. | Name of the Applicant | Sonir | Designation (Owner/ Partner/ CEO) | Director | Pin code | 400092 | E-mail | jeevanec2019@gmail.com | Telephone No. | 022-28990487 | Fax No. | 022-28991597 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Project site is located in the Dahej GIDC II, which
is well developed designated industrial area and
well connected with roads and rail network. | 1.2 | Clearance of existing land, vegetation and buildings? | No | There is no vegetation and building on the project
site. | 1.3 | Creation of new land uses? | Yes | Project land will be developed for industrial
activities. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil testing will be carried out before detailed
engineering design. | 1.5 | Construction works? | Yes | Industrial building, admin block, storage area for
raw material and finished product, treatment area
etc will be constructed above the ground. | 1.6 | Demolition works? | No | Not applicable as project site is open land. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Local personnel will be employed for the
construction works. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Excavation for foundation work and construction
work for industrial unit. | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Proposed project is pesticide and synthetic organic
chemicals, detail is given in PFR. | 1.14 | Facilities for storage of goods or materials? | Yes | The Separate area will be provided for the storage
of finished goods and raw materials. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | • Wastewater from industrial activities will be
treated in ETP having primary treatment
followed by MEE to achieving GPCB norms.
• Sewage will be treated in septic tank/soak pit.
• Solid/hazardous waste collection, storage,
transportation and disposal will be done as per
Hazardous and Other Wastes (Management
and Trans boundary Movement) Rules, 2016. | 1.16 | Facilities for long term housing of operational workers? | No | Local personnel will be employed, hence not
applicable. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing road network will be used for
transportation. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Proposed project will be established in GIDC II
which is already having infrastructure facility. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Water will be sourced from GIDC water supply
system. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Existing road network will be used for
transportation of material and personnel. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | 55 nos. of personnel will be employed during
operation phase. | 1.29 | Introduction of alien species? | No | Local species will be planted within green belt. | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Project area (20,000 sq. m) will be developed
for industrial activities. Layout plan is showing
as Figure 3-3 in PFR. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Source: Dahej GIDC water supply system
Water Requirement – Operation
• Domestic : 2.75 KLD
• Industrial : 34.85 KLD
• Greenbelt : 10.00 KLD
TOTAL : 47.60 KLD | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials like stone, aggregates,
Sand, morrum will be purchase from local
market. | 2.5 | Forests and timber (source – MT) | No | None | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity Requirement
Source : Dakshin Gujarat Vij Company
Limited (DGVCL)
• Requirement: 525 KVA
• D. G. set: 500 KVA for standby
Fuel Requirement:
• NG: 300 Nm3/Hr.
• HSD: 65 L/Hr. sourced from local market | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | All hazardous chemicals will be stored in
separate storage area with proper safety
equipments i.e. dyke wall, tank farm,
extinguishers, etc. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | None | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Proposed project would have positive impact
on the socio-economic of nearby area. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | None | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Organic waste generated from proposed staff will
be disposed through authorized agency. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Solid/hazardous waste collection, storage,
transportation and disposal will be done as per
Hazardous and Other Wastes (Management and
Trans boundary Movement) Rules, 2016. | 4.4 | Other industrial process wastes | Yes | Solid/hazardous waste is mentioned in PFR. | 4.5 | Surplus product | No | -- | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | ETP sludge will be stored and disposed to TSDF
site for land filling as per guideline. | 4.7 | Construction or demolition wastes | Yes | Recyclable construction waste like steel, iron rod
etc. will be sold to the vendors, while inert waste
(brick, concrete, masonry, aggregates etc.) will be reused for leveling and base material of internal
road. | 4.8 | Redundant machinery or equipment | No | None | 4.9 | Contaminated soils or other materials | No | Pucca floor will be provided at storage and
manufacturing area, so no chances of soil
contamination. | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | No | Not Applicable | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Flue gas emission from boiler, Thermopack and
D.G. Set. Moreover the transportation of vehicles
used for transportation of finished products; Raw
materials; waste disposal etc. shall also generate the flue gas emission. | 5.2 | Emissions from production processes | Yes | Emission of NO2, HCl, HBr and NH3 from vent
attached to reactor. Refer PFR. | 5.3 | Emissions from materials handling including storage or transport | Yes | The material handling including storage and
transportation may contribute to fugitive and VOC
emission. | 5.4 | Emissions from construction activities including plant and equipment | Yes | There will be flue gas emission and fugitive dust
emission from construction activities. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust will generate during construction and
handling of materials. Mitigation measures will be
provided to control it. | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise from operation of equipment will be
expected. | 6.2 | From industrial or similar processes | Yes | Noise will be generated from industrial activities. | 6.3 | From construction or demolition | Yes | Noise from construction activities will be generated. | 6.4 | From blasting or piling | No | Not Applicable | 6.5 | From construction or operational traffic | Yes | Due to construction and operational traffic, noise
level would be increased for a short interval. | 6.6 | From lighting or cooling systems | No | Not Applicable | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Fugitive emissions will be occurred during
storage and handling of raw material.
However, necessary precautionary measures
will be taken. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | • Sewage will be treated in septic tank/soak
pit system.
• Industrial Effluent will be treated in ETP
having primary treatment and MEE to
achieving GPCB norms. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Adequate stack height with SMF will be
provided with flue gas stack. Caustic scrubber
will be installed with process vent as air
pollution control equipment. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Detailed risk assessment will undertake for
all hazardous chemicals and all the
necessary precautionary measures as
suggested in RA will be implemented. | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Project site is not affected by floods or
earthquake. Disaster management plan will
be in place for any emergency. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Proposed project will have positive impact
on surrounding area due to development of
GB, CER activities, direct and indirect
employment etc. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | Proposed project will have impact on
environmental parameters. Environment
management plan will be in place to
mitigate the impact. | 9.3 | Set a precedent for later developments | No | -- | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | There will be cumulative effects due to
various chemical industries located in
nearby area. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Project site located in
notified industrial area i.e.
GIDC Dahej II. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Narmada River
3.97 km in South direction | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | None | 4 | Inland, coastal, marine or underground waters | Yes | Gulf of Khambhat
Around 13.18 km in West
direction | 5 | State, National boundaries | No | None | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None | 7 | Defence installations | No | None | 8 | Densely populated or built-up area | Yes | Dahej Village
4.02 km in West direction | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, schools, places of worship, community
facilities are available within study area | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | None
Project site is falls in
Seismic Zone – III. | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 19 Aug 2019 | 2. | NA | Please refer our earlier observations and information may be provided accordingly | 19 Aug 2019 | 3. | NA | The correction have been made as per the instruction received | 16 Aug 2019 | 4. | NA | Please inform whether the project site falls in the polluted area as per CPCB/NGT order | 14 Aug 2019 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Sonir | Designation | Director | Name of Company (Applicant Name should not be given here) | JEEVAN CHEMICALS PVT. LTD. | Address | D-2/CH-51, GIDC Dahej - II |
|
|