APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Neogen Chemicals Ltd
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/IND2/100557/2019
Project Cost 5500 lacs
2.
S. No. in the schedule5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 1555 ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot No. Z/109, SEZ Dahej, Tehsil: Vagra, Dist.: Bharuch-392110, Gujarat
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot No. Z/109
Town / VillageSEZ Dahej, Tehsil: Vagra, Dist.: Bharuch-392110, Gujarat
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratBharuchVagra
10.
Nearest railway station along with distance in kms Bharuch, 46 km
Nearest airport along with distance in kms Surat, 64 km
11. Nearest Town/City/District Headquarters along with distance in kms Bharuch , 46 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Bharuch District Panchayat, Near State Bank, Station Road, Bharuch. Phone Number: 02642-252471 Fax number: 02642-240951
13. Name of the Applicant HARIN
14. Registered Address 1002, 10th floor, Dev Corporate Bldg, Pokharan Road no 2Khopat, Thane -400601, Maharastra.
15.
Address for correspondance:
Name of the Company NEOGEN CHEMICALS LIMITED
Name of the Applicant HARIN
Designation (Owner/ Partner/ CEO) ExecutiveDirector
Pin code 400601
E-mail zld.dahej@neogenchem.com
Telephone No. 22-25497337
Fax No. 22-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The unit will be situated within the designated notified area SEZ promoted by GIDC Gujarat. Hence, the land use pattern will not change due to the proposed project.
1.2 Clearance of existing land, vegetation and buildings? No Land to be utilized will be a part of designated notified area SEZ promoted by GIDC Gujarat and no such clearance is required.
1.3 Creation of new land uses? No No creation of new land use as the project will be established within designated notified area SEZ promoted by GIDC Gujarat.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing will be carried out for construction activities.
1.5 Construction works? Yes Construction work will be done as per the requirement of proposed project.
1.6 Demolition works? No No demolition work is required to be carried out.
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary sites or housing will be constructed for workers, as workers will be coming from nearby villages.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes It will be as per the plant design.
1.9 Underground works including mining or tunnelling? No No such activities will be carried out.
1.10 Reclamation works? No No such activities will be carried out.
1.11 Dredging? No No such activities will be carried out.
1.12 Offshore structures? No No such activities will be carried out.
1.13 Production and manufacturing processes? Yes As per Annexure-I and II
1.14 Facilities for storage of goods or materials? Yes Unit will create storage facilities of products and raw materials as per the MSIHC and explosive rules.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Entire quantity of hazardous waste will be handled and disposed as per Hazardous & Other Waste (Management & Transboundary Movement) Rules, 2016. Domestic wastewater will be treated in STP. Industrial effluent will be treated in ETP and will be sent to GIDC drainage for final disposal.
1.16 Facilities for long term housing of operational workers? No The workers will be available from nearby local area and hence such facilities will not be required.
1.17 New road, rail or sea traffic during construction or operation? Yes There will be increase in road traffic due to the project. However existing transport routes are adequate for the proposed additional traffic.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No N.A.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No N.A.
1.20 New or diverted transmission lines or pipelines? No N.A.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No N.A.
1.22 Stream crossings? No N.A.
1.23 Abstraction or transfers of water from ground or surface waters? No Water will be sourced from GIDC supply, so no abstraction or transfers of water from ground or surface.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No such changes are envisioned. Water will be sourced from GIDC supply. Domestic wastewater will be treated in STP. Industrial effluent will be treated in ETP and will be sent to GIDC drainage for final disposal.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Locally available construction material will be used to minimize transportation. Maximum local workers will be engaged for construction as well as operational activities. No decommissioning work is required to be carried out for the proposed unit.
1.26 Long-term dismantling or decommissioning or restoration works? No No long-term dismantling or decommissioning or restoration works are required.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No N.A.
1.28 Influx of people to an area in either temporarily or permanently? Yes There will be influx of temporarily construction workers and permanent skilled manpower.
1.29 Introduction of alien species? No N.A.
1.30 Loss of native species or genetic diversity? No N.A.
1.31 Any other actions? No N.A.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The unit will be situated within designated notified area SEZ promoted by GIDC Gujarat.
2.2 Water (expected source & competing users) unit: KLD Yes For detailed water balance, refer Annexure-III. Source of water will be GIDC water supply. Total water consumption = 562 KLD [522 (Fresh water) + 40 (recycle)]
2.3 Minerals (MT) No N.A.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Cement, Stone, Steel etc will be used for construction activities as per the requirements. Locally available materials will be used to minimize transportation.
2.5 Forests and timber (source – MT) No No forest products will be used for construction work as well as during the operational phase. Timber usage will be limited to office furniture only.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Energy: 2000 kVA, Source: DGVCL Fuel: PNG- 10000 SCM/day, FO-380 kg/hr Diesel – 60 Liters per hour (for 3 DG set of 250 kVA each)
2.7 Any other natural resources (use appropriate standard units) No No other natural resources will be utilized.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes It may be noted that as per the Manufacture, Storage and Import of Hazardous Chemical Rules 2000, Hydrochloric acid, Methanol, IPA, HBr, Br2, Cl2 etc hazardous chemicals will be used in our proposed unit.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No such changes are envisioned.
3.3 Affect the welfare of people e.g. by changing living conditions? No No such changes are envisioned.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No No such changes are envisioned.
3.5 Any other causes No No such changes are envisioned.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No spoil, overburden or mine wastes will be generated.
4.2 Municipal waste (domestic and or commercial wastes) Yes Domestic wastewater will be treated in STP.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes As per Annexure-IV
4.4 Other industrial process wastes Yes As per Annexure-IV
4.5 Surplus product No No such wastes will be generated.
4.6 Sewage sludge or other sludge from effluent treatment Yes Generated sludge will be sent to TSDF.
4.7 Construction or demolition wastes No Construction wastes will be inert in nature and will be collected and utilized in filling of low-lying areas within the unit. No demolition work will be carried out for the proposed manufacturing unit.
4.8 Redundant machinery or equipment No No such wastes will be generated.
4.9 Contaminated soils or other materials No No such wastes will be generated.
4.10 Agricultural wastes No No such wastes will be generated.
4.11 Other solid wastes No No such wastes will be generated.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes As per Annexure-V
5.2 Emissions from production processes Yes As per Annexure-V
5.3 Emissions from materials handling including storage or transport No No major emissions envisioned, as all raw materials, products and hazardous chemicals will be stored and transported in closed containers.
5.4 Emissions from construction activities including plant and equipment Yes There will be generation of dust (SPM/RSPM) due to construction activities. However, proper sprinkling of water will be done to minimize impacts.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes There will be generation of particulate matters due to construction activities. However, care will be taken to make it minimum. Domestic wastewater will be treated in STP. All the reactions will be carried out in closed vessels. Therefore, no major odour will be generated.
5.6 Emissions from incineration of waste No No incinerator proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No There will be no burning of waste in open air.
5.8 Emissions from any other sources No There will be no emission from other sources.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes There will be generation of noise due to operation of various equipments/ machineries, which will be kept under the prescribed statutory norms by suitable engineering controls.
6.2 From industrial or similar processes Yes Sources of noise pollution from the plant will be Pumps & Motors, Machineries, Boilers, Cooling Tower, D.G. set etc.
6.3 From construction or demolition Yes Noise Level at different sources is expected to come below acceptable limit.
6.4 From blasting or piling No N.A.
6.5 From construction or operational traffic Yes There will be small increase in the noise level due to traffic during construction and operational phase.
6.6 From lighting or cooling systems Yes There will be generation of noise due to operation of Cooling Tower.
6.7 From any other sources No N.A.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Industry will provide adequate storage area for the safe storage of products, raw materials and hazardous chemicals. Proper care for handling of hazardous material will be taken as per the MSIHC rules & HW management Rules.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No such discharges are envisioned. Domestic wastewater will be treated in STP. Industrial effluent will be treated in ETP and will be sent to GIDC drainage for final disposal.
7.3 By deposition of pollutants emitted to air into the land or into water No No major impact is anticipated by deposition of pollutants emitted. Necessary air pollution control measures will be adopted for controlling the air pollution within the norms specified by Central/ State Pollution Control Board. Refer Annexure-V for proposed APCM.
7.4 From any other sources No N.A.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No major risk is envisioned. Domestic wastewater will be treated in STP. Industrial effluent will be treated in ETP and will be sent to GIDC drainage for final disposal. Adequate filters and scrubbers will be provided to stacks to control the air pollution within the norms. Entire quantity of hazardous waste will be handled and disposed as per Hazardous & Other Waste (Management & Transboundary Movement) Rules, 2016.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Unit will follow the Risk Assessment Guideline of factory act to minimize the accident.
8.2 From any other causes No N.A.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Area is susceptible to earthquakes (falls under Seismic Zone-III). The structural design will be in accordance with Seismic Zone-III specification to avoid the disaster due to earthquake.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No No such consequential development is envisioned.
9.2 Lead to after-use of the site, which could have an impact on the environment No N.A.
9.3 Set a precedent for later developments No N.A.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No N.A.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No such areas within 15 km of the proposed project.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Gulf of Khambhat is within 15 km of the proposed project.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No No such areas within 15 km of the proposed project.
4 Inland, coastal, marine or underground waters No No such areas within 15 km of the proposed project.
5 State, National boundaries No No such areas within 15 km of the proposed project.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No No such areas within 15 km of the proposed project.
7 Defence installations No No such areas within 15 km of the proposed project.
8 Densely populated or built-up area Yes Dahej is around 5 km from the project site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No No such areas within 15 km of the proposed project.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No No such areas within 15 km of the proposed project.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No such areas within 15 km of the proposed project.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Area is susceptible to earthquakes (falls under Seismic Zone-III).
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantHARIN
DesignationExecutiveDirector
Name of Company (Applicant Name should not be given here)NEOGEN CHEMICALS LIMITED
Address1002, 10th floor, Dev Corporate Bldg, Pokharan Road no 2Khopat, Thane -400601, Maharastra.