APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s M/s Saurashtra Fuels Pvt. Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/GJ/IND/87299/2018
Project Cost 12180 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Existing Low Ash Metallurgical Coke - 84640MT/Annum and Proposed Capacity of Silico Manganese Alloy (Ferro Alloy)- 44640MT/Annum ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 79.268 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSurvey No. 164, 165, 166/1,166/2, 167,168, 170, 171, 172, 219/2, 269 Part, 37/1, 38, 39, 40/2, 44, 45, 42, 43, 50 Baraya – Patri Road, Village: Lakhapar, Taluka: Mundra, Dist: Kutch
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Survey No. 164, 165, 166/1,166/2, 167,168, 170, 171, 172, 219/2, 269 Part, 37/1, 38, 39, 40/2, 44, 45, 42, 43, 50 Baraya – Patri Road, Village: Lakhapar, Taluka: Mundra, Dist: Kutch- 370421
Town / VillageVillage: Lakhapar
State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratkutchMundra
10.
Nearest railway station along with distance in kms Bhuj Railway Station- 38.0 km approx, 38 km
Nearest airport along with distance in kms Adani Airport, 13.06 km
11. Nearest Town/City/District Headquarters along with distance in kms Mundra , 11 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Lakhapar, Baraya – Patri Road, Mundra, Kutch - 370421
13. Name of the Applicant Mrugesh
14. Registered Address Survey No.164, 165, 166/1, 166/2, 167, 168, 170, 171, 172, 219/2, 269 Part, 37/1, 38, 39, 40/2, 44, 45, 42, 43, 50, Baraya-Patri Road, Village Lakhapar, Taluka Mundra
15.
Address for correspondance:
Name of the Company M/S. SAURASHTRA FUELS PVT. LTD.
Name of the Applicant Mrugesh
Designation (Owner/ Partner/ CEO) ExecutiveHRD
Pin code 380054
E-mail saurashtrafuelsec@gmail.com
Telephone No. 079-40227500
Fax No. 079-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No About 9,01,626.44 sq.m. of land is acquired originally is in possession of Saurashtra Fuels Pvt. Ltd. Since the land is an industrial land use and the project is expansion of the existing industry, as such no change in land use is envisaged. Land document & layout is given in Annexure-I.
1.2 Clearance of existing land, vegetation and buildings? No Not Applicable
1.3 Creation of new land uses? No Not Applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Applicable
1.5 Construction works? Yes There would be construction of structures required for supporting the machineries and equipments, construction of storage shed etc.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? No Local labour shall be employed and not need of housing for construction workers. Most of the machineries would be installed by external agencies.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes There would be construction of structures required for supporting the machineries and equipments, construction of storage shed etc. No earthworks, cut and fill or excavations envisaged.
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes As above
1.14 Facilities for storage of goods or materials? Yes Manganese ore will be stored in open yard on one side of the reclaiming conveyor whereas Coke and Coal will be stored in covered storage shed on the other side. There will be 2m high concrete walls on three sides of the storage yard and the storage surfaces will be soled with concrete. Materials will be reclaimed from the storage area with the help of front end loaders and tippers and are fed to a belt conveyor through a ground hopper.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Currently the domestic effluent generated of @18.0 KLD . In future the total domestic effluent generation of @22.0 KLD shall be treated in STP and reused for gardening purpose. The cooling tower blow down, softener blow down and pressure filter back wash of @ 120.0 KLD shall be given primary treatment in ETP and then recycled for dust suppression or gardening purpose Refer Annexure – II for water and wastewater generation.
1.16 Facilities for long term housing of operational workers? No Labor will be from nearby area
1.17 New road, rail or sea traffic during construction or operation? No Not Applicable
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Not Applicable
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Local peoplLocal people will be employede will be employed
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? No Not Applicable
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Unit already exists.
2.2 Water (expected source & competing users) unit: KLD Yes Total Water requirement 457 KLD, which shall be supplied by GWIL / existing borewells.
2.3 Minerals (MT) Yes Dolomite, Quartz, Coal, Mn Ore
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Not Applicable
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Existing – 1.5 MW Proposed – 30 MW Source - PGVCL / Proposed CPP (In Future)
2.7 Any other natural resources (use appropriate standard units) Yes Mn Ores -1950 kg/MT Coal – 240 kg/MT Dolomite – 160 kg/MT Quartz-585 kg/MT
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not Applicable
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? No Not Applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) No Not Applicable
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used Oil, SiMn Slag, Bag Filter dust, ETP Sludge, Refer Annexure – III for details.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes ETP Sludge & Septic Tank / Soak Pit Sludge can be used as manure after dewatering. To be managed as per the applicable governing laws.
4.7 Construction or demolition wastes No Not Applicable
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Please refer Annexure IV
5.2 Emissions from production processes Yes Please refer Annexure IV
5.3 Emissions from materials handling including storage or transport Yes The proposed furnace has smoke collection hood of low hood design which prevent any fugitive gas emissions. The gas emissions from the furnace are routed to the smoke stacks through gas off-takes provided on the furnace hood. Fugitive fume emissions that take place during furnace tapping operations are sucked out by a separate blower and are channelized to the bag house for dust separation and subsequent cleaned gas let-off.
5.4 Emissions from construction activities including plant and equipment Yes During construction stage, excavation, construction of buildings, vehicular movement, etc, will generate fugitive dust and vehicular emission in and around the proposed site. This is temporary, short term and reversible. This dust will be coarser size and will not travel long distance and could be suppressed by water sprinkling and existing green belt area.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes As above
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes • Noise will remain within the statutory limits. Equipments shall be designed to conform to noise levels prescribed by regulatory authorities; • Provision of acoustic enclosures to noise generating equipments like pumps; • Equipments and machineries generating noise shall be provided with padding/isolators to reduce the noise level at source; • Equipment’s foundation and structures will be designed to reduce vibrations; • Provision of thick greenbelt to attenuate the noise levels;
6.2 From industrial or similar processes Yes As above
6.3 From construction or demolition Yes During the construction the deployment of construction equipments like tractors, trucks, cranes, compressors, diesel generators, concrete mixing machines, etc, might increase in the ambient noise levels. However, these noise generating equipments will be operating intermittently and dispersed in different places reasonably away from each other.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic No Not Applicable
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No hazardous materials / chemicals to be used
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Currently the domestic effluent generated of @18.0 KLD is disposed through septic tank / soak pit system. In future the total domestic effluent generation of @22.0 KLD shall be treated in STP and reused for gardening purpose. The cooling tower blow down, softener blow down and pressure filter back wash of @ 120.0 KLD shall be given primary treatment in ETP and then recycled for dust suppression or gardening purpose Refer Annexure – II for water and wastewater generation.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Stack of appropriate height will be installed for flue gas stack & fugitive gas control system shall be provided.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No All EMS components shall run round the clock; and in case of failure of any of the system there will be safe storage arrangement, which will help for safe storage of waste/effluent. In case of extreme emergency plant will be closed till the system gets operational
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Due care shall be taken to prevent any disaster.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Such disasters are out of human control
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No There would not be any development of supporting facilities, ancillary development or development stimulated by the project. However, the existing low ash metallurgical coke shall be used as a raw material for proposed production.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable as there are no such areas in the vicinity of 15 km.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not Applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No The area is specially developed for industrial development as there are already existing plant.
4 Inland, coastal, marine or underground waters No Not applicable as there are no such areas near the vicinity of 15 km.
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area No Area is not densely populated
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes The site is surrounded by many such areas.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No None within 15 km area
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None within 15 km area
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No No such hazard identified so far
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantMrugesh
DesignationExecutiveHRD
Name of Company (Applicant Name should not be given here)M/S. SAURASHTRA FUELS PVT. LTD.
AddressSurvey No.164, 165, 166/1, 166/2, 167, 168, 170, 171, 172, 219/2, 269 Part, 37/1, 38, 39, 40/2, 44, 45, 42, 43, 50, Baraya-Patri Road, Village Lakhapar, Taluka Mundra