APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Solid Waste to Energy Facility (Using Cold Plasma Technology to convert Green Power, Purified Water and Fuel
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/DL/THE/84113/2018
Project Cost 45000 lacs
2.
S. No. in the schedule1(d) Thermal Power Plants
Project Sector Thermal Projects
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 55 MW ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectGhazipur Landfill Site, East Delhi, New Delhi
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Ghazipur Landfill Site
Town / VillageEast Delhi
State of the projectDelhi
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)DelhiEastPreet Vihar
10.
Nearest railway station along with distance in kms Anand Vihar Terminal, 2.88 km
Nearest airport along with distance in kms Hindan Air Force Airport, 9.22 km
11. Nearest Town/City/District Headquarters along with distance in kms Ghazipur , 0.24 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) East Delhi Municipal Corporation Opp. Gagan Theatre, Wazirabad Road, Mandoli Extension,Village Mandoli, Delhi-110093
13. Name of the Applicant Ajay
14. Registered Address B-2, Dhawan Deep Building, 6 Jantar Mantar Road
15.
Address for correspondance:
Name of the Company A.G. DAUTERS WASTE PROCESSING PRIVATE LIMITED
Name of the Applicant Ajay
Designation (Owner/ Partner/ CEO) ManagingDirector
Pin code 110001
E-mail ajay@agdauters.com
Telephone No. 011-40254386
Fax No. 011-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The land is designated for Solid Waste Management facility i.e. landfill site. The landfill site was established before 2006 thus, no Environment Clearance has been granted for the same. Now, the part of existing landfill park has been allotted by East Delhi Municipal Corporation for setting up of proposed project. The legacy waste lying at the existing landfill site will be transported to the plant through a special flexible conveyor system and the waste on the conveyor belts will be loaded by
1.2 Clearance of existing land, vegetation and buildings? No There are no building and distinct vegetation at site except few bushes, hence, no clearance of existing land is required.
1.3 Creation of new land uses? No The land is earmarked for Solid Waste to Energy Facility by East Delhi Municipal Corporation. There will be no change in land use as land is designated for Solid Waste Management facility i.e. landfill site.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Pre-construction soil investigation shall be carried out.
1.5 Construction works? Yes Construction work is required for setting up of Solid Waste Management Facility which will have office building, plant area etc. The construction activities will have temporary change in the physical environment of the site.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? No Construction workers will be hired from nearby areas, so no housing will be required, only temporary sanitation facilities will be made.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Above ground, there shall be construction done for above ground building or excavation will be done.
1.9 Underground works including mining or tunnelling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes By processing Solid Waste, products such as 55 MW green power, 30 KLD Purified water and 30 KLD Fuel will be generated.
1.14 Facilities for storage of goods or materials? No Temporary sheds will be used for storage of goods or materials required at the time of construction.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The proposed project itself is a facility for treatment of 200 TPD waste per day. The waste shall be processed for generation of green power, drinking water and fuel. There shall be generation of 5.5 kg/day of Municipal Solid Waste generated from workers and staff which will be disposed within the facility itself. Wastewater will be only generated from domestic uses from staff and workers which will be reused in the process, no other waste water will be generated from the process. Only ash
1.16 Facilities for long term housing of operational workers? No No housing facilities are proposed.
1.17 New road, rail or sea traffic during construction or operation? No Not applicable.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable.
1.20 New or diverted transmission lines or pipelines? No No new or diversion proposed
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable.
1.22 Stream crossings? No No stream crossing at the site.
1.23 Abstraction or transfers of water from ground or surface waters? No Water requirement for the project is around 2039 KLD out of which only 5 KLD of fresh water is required which will be met through DJB, 2004 KLD of wastewater which will be met from nearby nala and waste water generated from domestic purposes for process and 30 KLD of in-house generated purified water which will be used for landscaping and miscellaneous purposes.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No None envisaged
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Materials during construction phase shall be transported by truck, trolley etc. Construction materials like steel, aggregates, sand and cement will be sourced through local retailers and transported by road. MSW will be transported to the plant through a special flexible conveyor system during operation phase. The waste on the conveyor belts will be loaded by the JCB’s.
1.26 Long-term dismantling or decommissioning or restoration works? No None envisaged
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No None envisaged
1.28 Influx of people to an area in either temporarily or permanently? No During Construction Phase Temporary influx of people in the form of labour shall occur. Approx. 150 no of local labour shall be employed. During Operational Phase During operation of the facility 37 no. of staff and workers shall be hired.
1.29 Introduction of alien species? No None envisaged
1.30 Loss of native species or genetic diversity? No None envisaged
1.31 Any other actions? No None envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land is designated for Solid Waste Management facility i.e. landfill site. The landfill site was established before 2006 thus, no Environment Clearance has been granted for the same. Now, the part of existing landfill park has been allotted by East Delhi Municipal Corporation for setting up of proposed project. The land where the plant is proposed is vacant landfill park. Hence, part of vacant landfill park will be used for Solid Waste Management Facility for converting waste into green pow
2.2 Water (expected source & competing users) unit: KLD Yes Water requirement for the project is around 2039 KLD out of which only 5 KLD of fresh water is required which will be met through DJB, 2004 KLD of wastewater which will be met from nearby nala and waste water generated from domestic purposes for process (2000 KLD nearby nala + 4 KLD domestic waste water) and 30 KLD of in-house generated purified water which will be used for landscaping and miscellaneous purposes.
2.3 Minerals (MT) No Not applicable.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction materials like stone, aggregates, steel and cement will be sourced through local retailers.
2.5 Forests and timber (source – MT) Yes Not envisaged.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes No external power supply will be required. 55 MW of power will be generated out of which 5 MW is used for auxiliary purpose within the site and 50 MW will be given out to the grid. Total Electric Load: 5 MW Source of power supply – Power generated within the facility.
2.7 Any other natural resources (use appropriate standard units) No Not envisaged.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not applicable.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No The project will help in solving the problem of solid waste disposal in the area and thereby managing the solid waste in a proper manner.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Proper management of waste will reduce the probability of any adverse effect on people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable
3.5 Any other causes No Not envisaged.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No None envisaged.
4.2 Municipal waste (domestic and or commercial wastes) Yes Proposed project is management of municipal solid waste hence, whatever municipal solid waste will be generated from workers will be disposed and processed within the complex itself for generation of power.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Not applicable.
4.4 Other industrial process wastes Yes Total ash of 96 kg/day from 200 TPD of waste will be generated in the form of plasma rock from the plant which will be reused within the facility.
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment No Not applicable
4.7 Construction or demolition wastes Yes Construction waste generated will be used to the extent possible. Rest of the waste will be sent to the C&D Waste disposal facility.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No As there will be no emissions or residues generated from the plant thus contamination of soil is not envisaged.
4.10 Agricultural wastes No None envisaged.
4.11 Other solid wastes Yes Ash will be generated as by-product in the form of plasma rock from effluent gasification which will be disposed within the landfill facility.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No Not applicable as there will be no combustion of fossil fuel.
5.2 Emissions from production processes No None envisaged as no missions from production process of power generation will be there.
5.3 Emissions from materials handling including storage or transport Yes During construction: Transportation of construction material in trucks from source to site, for which proper PUC checking will be done as per guidelines. The storage of MSW will be outside the project premises which is on existing landfill facility thus odour counteractants such as surfactants and neutralizers can be suggested to EDMC in order to avoid odour in the landfill facility.
5.4 Emissions from construction activities including plant and equipment Yes As only sheds will be developed there will be Dust & emissions are likely to be generated during construction activities which will be reduced by sprinkling of water in a specific time interval & timely maintenance schedule for machinery. Exhaust emission from construction machinery and vehicles will be generated.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During loading & unloading of construction material dust is likely to be generated during construction phase. Water will be sprinkled and tarpaulin cover will be provided over stored raw material to reduce dust emission.
5.6 Emissions from incineration of waste No There will be no incineration of waste.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise will be generated from turbines, air compressors, blowers, pumps, etc. Noise from turbine is envisaged to be less than 75dB(A), 1m away from the source. Turbines will be housed in enclosed room. Low noise generating machinery and equipment will be procured.
6.2 From industrial or similar processes Yes Noise will be generated in work zone from grinding machine. Equipment Noise expected to be less than 85 dB (A) at 1 m from source. Noise generating equipment & Machinery area, will be well insulated with enclosed rooms. Earmuffs will be used while running equipment of the Industry.
6.3 From construction or demolition Yes Some noise will be generated from construction equipment and machinery. This will be controlled using regular maintenance schedule and proper upkeep of vehicles, providing silencers and mufflers at appropriate places.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes No significant contribution of traffic due to operation of the project is envisaged as the proposed project will be developed within the existing landfill site only. However, slight addition can occur during construction phase for carrying construction materials and from staff during the operation phase.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No None
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Hazardous waste will not be allowed to mix with MSW as per the guidelines of MoEF&CC. The project will not involve any handling and storage of hazardous materials.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No he only source of waste water is from domestic sources which will be reused within the plant in process. The purified water of 30 KLD will be reused within the facility in landscaping purposes and miscellaneous purpose.
7.3 By deposition of pollutants emitted to air into the land or into water No No emission from the facility is envisaged.
7.4 From any other sources No Not Applicable. None envisaged
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Since, there will be no emission from the plant thus, there is no risk of long-term build-up of pollutants in the environment.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No As there is no storage of hazardous substances thus chances of fire are minimal. However, the project is located at existing landfill site so there are chances of fire from landfill gas in landfill area which might affect the proposed project area. Thus, proper fire-fighting system will be installed in the facility to mitigate the risk of fire as per prescribed norms.
8.2 From any other causes No None
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The area under study falls in Zone-IV, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively will be adopted.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes All supporting infrastructure exists near site as the project site present within city Delhi. All supporting infrastructure exists near site.
9.2 Lead to after-use of the site, which could have an impact on the environment No Proper care will be taken to avoid any adverse impact on the environment. As the proposed project is environment friendly thus, there shall be no negative impact on the environment.
9.3 Set a precedent for later developments Yes Proper and Planned development for the Solid Waste Management facility.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No No impact. It will set a precedent for Solid Waste Management facility.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Okhla Bird Sanctuary- 6.41 km SW
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Water sources or other waterbodies Yamuna River- 6.17 Km SW Hindan River- 6.12 Km NE Sanjay Lake-2.24 km SW Drain- 0.29 km SE Drain- 0.98 km SW Drain near hasanpur- 1.86 km NW Forest Restricted Forest- 5.04 km SWW
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Okhla Bird Sanctuary- 6.41 km SW
4 Inland, coastal, marine or underground waters No None
5 State, National boundaries Yes Uttar Pradesh- 0.49 Km NE
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Roads NH -24- 0.37 km NNW Dadri Main Road- 4.57 Km SW Ghazipur Road- 0.93 Km SWW Railway Station Anand Vihar Terminal- 2.88 Km NW Mandawli Railway Junction- 3.91 Km W Chander Nagar Railway Station- 3.91 km N Vivek Vihar Junction- 5.27 km NNW Airport Hindan Airforce Airport-9.22 km NE IGI Airport Delhi- 12.35 Km SW
7 Defence installations Yes Hindan Airforce Airport- 9.22 km NE
8 Densely populated or built-up area Yes Ghazipur Dairy Farm- 0.24 Km W
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospital Max Super Speciality hospital- 0.96 Km NE Ashok Hospital- 1.20 Km NW Urban Health Center- 1.90 Km NW Ghazipur Dispensary- 0.93 Km NW Post Office Post Office at Khichripur- 1.57 Km SW Post Office at Kalyanvas- 1.89 Km SW Indian Post at Hasanpur- 1.94 Km NW Place of Worship Sri Shiv Mandir-1.37 Km NW Nav Durga Mandir- 1.36 Km NW Ayyappa Mandir- 1.07 km SE Schools Khichripur Govt School-1.30 Km SW MCD Primary School- 0.97 Km NW Kala Niketan School-1.16 Km NW Shan School-
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes • Bastion, where a wall of Jahan panah meets the wall of Rai Pithora’s fort, Adchini-14.93 km SW • Lal Gumbad, Chirag Delhi- 14.80 km SW • Tomb of Bahlol Lodi-13.96 km SW • Tomb of Mirza Muzaffer, Chota Batasha-8.50 km SW • Bagh-i-Alam Gumbad with a Mosque-8.35 km SW • Kali Gumti-14.94 km SW • Tohfewala Gumbad-14.94 km SW • Arab Sarai- 14.30 km SW • The Gate way of Arab Sarai facing North towards Purana Qila-8.89 km SW • The Gate way of Arab Sarai facing East towards the tomb of Humayun
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Yes Okhla Industrial Area- 10.46 km SW
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Area falls in seismic zone IV No flooding in the area according to previous record
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
Additional Attachments, if any
Attached File
ADS Letter
ADS Letter
ADS Letter
ADS Letter
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAs per Minutes of Meeting of 26th EAC (Thermal Projects) dated 27th March,2019, We understand that MoEF&CC has received Detailed Project Report of the Proposed Project from Institute of Plasma Research, Gandhinagar. Hence, we would request you to grant us Terms of Reference. 21 May 2019
2.NA

Accordingly, the proposal has been  deferred till such time the above  issues are resolved.

11 Apr 2019
3. ADS Reply LetterReply of queries raised as mentioned in Minutes of Meeting held on 22nd February 2019 for the 55 MW Waste to Energy Plant based on 200 TPD Municipal Solid Waste using Cold Plasma Technology at Gazipur Sanitary Landfill (East Delhi Municipal Corporation) by M/s A.G. Dauters Waste Processing Private Limited is attached herewith. 14 Mar 2019
4.NAok 11 Mar 2019
5. ADS Reply LetterThe detailed project report with along with technology and material balance has been enclosed. 10 Jan 2019
6. ADS Raise LetterPlease provide the information as per attached letter. 04 Jan 2019
7.NACommittee after deliberations, deferred the project for submission of detailed project report along with the technology including the material balance 20 Dec 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAjay
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)A.G. DAUTERS WASTE PROCESSING PRIVATE LIMITED
AddressB-2, Dhawan Deep Building, 6 Jantar Mantar Road
Print