S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of “Proposed In-Situ Development” at Kathputli Colony, Near Shadipur Depot, New Delhi
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/DL/NCP/80303/2018
Project Cost 73902 lacs
2.
S. No. in the schedule8(b) Townships and Area Development projects.
Project Sector INFRA-1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 380929.71 ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/DL/NCP/80302/2012
MoEFCC file number(Previous EC)620
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 20.06 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectat Kathputli Colony, Near Shadipur Depot, New Delhi
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.at Kathputli Colony, Near Shadipur Depot, New Delhi
Town / Villageat Kathputli Colony, Near Shadipur Depot, New Delhi
State of the projectDelhi
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)DelhiWestPatel Nagar
10.
Nearest railway station along with distance in kms Patel Nagar Railway Station, 0.67 km
Nearest airport along with distance in kms IGI Airport, 9.52 km
11. Nearest Town/City/District Headquarters along with distance in kms Kirti Nagar , 0 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) NA
13. Name of the Applicant Abhinav
14. Registered Address W4D, 204/5, Keshav Kunj, Carippa Marg, Western Avenue, Sainik Farms, New Delhi-110062
15.
Address for correspondance:
Name of the Company RAHEJA DEVELOPERS LTD.
Name of the Applicant Abhinav
Designation (Owner/ Partner/ CEO) DM
Pin code 110062
E-mail rahejadeveloper01@gmail.com
Telephone No. 011-40611111
Fax No. 011-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Proposed development is as per Delhi Master Plan 2021
1.2 Clearance of existing land, vegetation and buildings? Yes Tree cutting is involved in this project. There are 79 trees are available on site. Out of which 20 trees will be cut for which permission from Forest Department has been obtained & 59 trees will be retained. Compensatory plantation will be done per norms of Forest Department
1.3 Creation of new land uses? No No new land use is proposed. The proposed site is for residential development.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing investigation has already been done.
1.5 Construction works? Yes The major construction works are given below: Site Development Road Development • Internal roads Utilities/Services • Water Supply • Sewerage • Drainage • Rain Water Harvesting Structures and Pits • Power supply and back up facility, Buildings • Remunerative Residential block • Remunerative Commercial block • EWS .
1.6 Demolition works? No Any type of demolition work is not involved in expansion project.
1.7 Temporary sites used for construction works or housing of construction workers? Yes Mostly, local labors will be employed. However temporary labor camps will be established for laborers during the construction stage. All the construction activities including storage of raw materials will be confined to the storage spaces earmarked on project site only.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Above ground building structures will include building of 4B+G/ST/PO+40. The earthwork involved for foundation and basement.
1.9 Underground works including mining or tunnelling? Yes Underground works includes excavation of earth for construction of foundation and basement etc.
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? No Not applicable
1.14 Facilities for storage of goods or materials? Yes Temporary storage facilities will be created during construction phase for storage of construction materials.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste Construction Stage : The construction stage solid waste will comprise mainly of construction waste. The construction debris generated will be reused within the site for various construction works. In addition to that there will be generation of small quantity of municipal waste from 280 (175 camp and 105 floating) construction labors. It will be ensured that the generated waste will be sent to nearest designated waste storage bins. Operation Stage: Solid waste generation
1.16 Facilities for long term housing of operational workers? No Not Applicable
1.17 New road, rail or sea traffic during construction or operation? Yes Road traffic is expected to be increased marginally during construction and operation phases of the project. No significant impact is anticipated on road and rail traffic due to construction of this complex.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing road network will be used.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes Main source of water is municipal water supply augmented with the water supply from Delhi Jal Board.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No By considering run off prior to development & run off after development there is some increment in storm water runoff. However runoff generated from the project site during monsoon season will be recharged to ground water aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During construction phase transport of personnel as well as construction materials would be required. The personnel would preferably be engaged from nearby areas. Precaution will be taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? Yes Minor and temporary impacts on environment are anticipated due to the increased traffic
1.28 Influx of people to an area in either temporarily or permanently? Yes Construction phase – Temporary influx of about 280 labors (175 camp and 105 floating) from the nearby areas is expected. Operation phase (For complete project) – 18284 persons residential + 9951 persons floating.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Land use of proposed site is residential as per Delhi Master plan 2021.
2.2 Water (expected source & competing users) unit: KLD Yes Main source of water supply is municipal water supply by Delhi Jal Board.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All materials for construction will be arranged by nominated contractors / suppliers.
2.5 Forests and timber (source – MT) Yes Negligible quantity (only at selected locations)
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Complete project will need 9538 KW of electricity. Developer will provide D.G sets of 5090 KVA for complete project for power backup in case of electricity failure.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No storage of hazardous chemicals (as per MSIHC rules) will be made, apart from limited quantity of HSD storage (for DG set operation).
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures will be adopted to restrict stagnation of water & accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes This is a rehabilitation colony specially for people living in jhuggis. It will raise the living standard of those peoples.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Excavated top soil will be properly stacked; it will be reused as top layer for horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft and road construction.
4.2 Municipal waste (domestic and or commercial wastes) Yes Construction Phase: Municipal solid waste – Total 68.25 kg/day of waste, 52.50 kg/day (from labor camp) and 15.75 kg/day (floating labor) Operation Phase: Municipal solid wastes – 12.7 TPD The solid waste includes paper, card board, plastic cans etc. and kitchen wastes from houses. Recyclable wastes like card boards and plastic cans will be sold to authorized vendors. Biodegradable waste will be treated in onsite OWC.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Waste oil 7.77 Lts on daily basis from DG sets will be the only hazardous waste generated from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recycler authorized by CPCB/SPCB. Suitable care will be taken to prevent spills/ leaks of used oil from storage.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Dried sludge from the STP will be used as manure for horticulture development. Surplus manure will be sold to farmers.
4.7 Construction or demolition wastes Yes Most of construction waste will be used in building construction.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emission will be from Stationary Sources: DG sets Mobile Sources: Vehicular emissions CPCB approved DG sets with acoustic canopy will be used only during power failure.
5.2 Emissions from production processes No Not Applicable
5.3 Emissions from materials handling including storage or transport Yes Emissions from the vehicles/ machinery used for the construction.
5.4 Emissions from construction activities including plant and equipment Yes Slight emissions from welding activities and working of construction equipment/ machinery shall be complied with PUC certificate only.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase: • Use of RMC to reduce material handling & dust generation. •Tarpaulins will be used to cover trucks carrying debris. Water sprinkling will be practiced at regular intervals to reduce dust emissions. Dust generated during operation stage shall be minimal due to vegetated & hard surface. Sewage generated from proposed project will be treated
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise is expected to be generated during construction phase mainly from operation of heavy machinery, DG sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: Concrete Mixer - 85 dBA Generator - 75 dBA Pumps -90 - 95 dBA Trucks - 85 – 90 dBA For control of noise following measures shall be adopted: Properly maintained equipment with mufflers will be used. High noise generating
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition Yes Noise Pollution Control: Noise pollution will be due to operation of machinery as well as transportation vehicles. Following precautions shall be taken to control noise pollution : High noise generating construction activities would be carried out only during day time. Installation, use and maintenance of mufflers on equipment. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Traffic will increase due to the use of vehicles by visitors. Noise levels due to vehicles will be there. To reduce the noise level green belts and tree shall be there which shall act as good noise absorbers.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes The waste oil generated during operation phase from the DG sets will be collected and separately stored in HDPE drums over concrete floor within the premises before final disposal. All precautionary steps will be taken to avoid spillage It will be directly transferred to authorized recyclers.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Generated Sewage from the project will be treated in the STP proposed onsite, and recycled within the proposed project facility for flushing, gardening, HVAC & DG cooling.
7.3 By deposition of pollutants emitted to air into the land or into water No Dust generation during construction phase from earthworks and movement of vehicles was a temporary phenomenon and will have short term impact during construction phase. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be discharged at height stipulated by CPCB. Height of stack will be as per CPCB norms.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No STP will be installed to treat the waste water. Treated effluent will be used for flushing, horticultural purposes, HVAC & DG cooling.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No During construction phase, no such risk is anticipated. However, the contractors shall comply with the safety procedures, norms and guidelines as applicable) mentioned in the National Building Code of India and Bureau of Indian Standards. During Operation Phase, all precautionary and safety measures will be taken to minimize any accident hazard.
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project site falls in Seismic Zone-IV. The architectural and structural design of buildings will comply earthquake resistant requirement as per code. Chances of Floods are very less. Landslides and cloud bursting in the area not reported so far.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The project will be equipped with dedicated internal road, parking, internal water distribution system, fire fighting system, internal sewage collection network, lighting facilities, solar lighting, and power backup facility. Increase in water and power demand. Appropriate infrastructure like, roads, power supply and waste management facility will be developed within the site so that chances of occurrence of any adverse impacts are minimized. No Construction materials No
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments Yes This is residential/ Commercial development; there will be generation of employment during construction & operation phase.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Central Ridge, 2.84 km/S
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Yamuna River: 8.48 km, E Drain, 1.45 km, N
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Central Ridge, 2.84 km/S
4 Inland, coastal, marine or underground waters No Not located within 15 km of the proposed project location.
5 State, National boundaries Yes Delhi- U.P. border, 13.91 km, NE
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No The site does not fall under any route to any pilgrim, tourist or recreational area.
7 Defence installations No Not located within 15 km of the proposed project location.
8 Densely populated or built-up area No Density of Surrounding development is as per Delhi Master Plan.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Manmade community facilities such as, schools, hospitals are planned but are not close to the site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No The project site does not fall in the notified areas for control and regulation of ground water. There will be no extraction of ground water from the project site, the fresh water will be sourced from Delhi Jal Board.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nothing specific
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The project is located at seismic zone IV according to Indian Standard Seismic Zoning Map. Structural design will be done for this seismic zone as per code. There are no possibilities of the proposed project site getting flooded as per available records. Landslides are not applicable as the project site & surrounding land is flat.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAbhinav
DesignationDM
Name of Company (Applicant Name should not be given here)RAHEJA DEVELOPERS LTD.
AddressW4D, 204/5, Keshav Kunj, Carippa Marg, Western Avenue, Sainik Farms, New Delhi-110062
Print