APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Redevelopment of GPRA Colony at Srinivaspuri, Delhi
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/DL/NCP/75890/2018
Project Cost 300000 lacs
2.
S. No. in the schedule8(b) Townships and Area Development projects.
Project Sector INFRA-1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Built Up Area 939484.55 sq. m. ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 113248.8 ha.
6. Category of project i.e. 'A' or 'B' B
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSrinivaspuri, Delhi
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.GPRA Colony
Town / VillageSrinivaspuri
State of the projectDelhi
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)DelhiSouthKalkaji
10.
Nearest railway station along with distance in kms Hazrat Nizamuddin Railway Station, 2.50 km
Nearest airport along with distance in kms Safdarjung Airport, 4.50 km
11. Nearest Town/City/District Headquarters along with distance in kms Saket, South Delhi , 6 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) South Delhi Municipal Corporation 780, Major Somnath Marg, Sector 9, R.K. Puram, New Delhi, Delhi 110022 Contact no. : 011-23227358
13. Name of the Applicant Ravi
14. Registered Address E-Wing, Nirman Bhwan, New Delhi
15.
Address for correspondance:
Name of the Company CENTRAL PUBLIC WORKS DEPARTMENT
Name of the Applicant Ravi
Designation (Owner/ Partner/ CEO) EE
Pin code 110011
E-mail srinivaspuri03@gmail.com
Telephone No. 11-23062902
Fax No. 11-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?Yes
StatusApplication for Forest Clearance yet to be submitted
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The project lies in the Zone F, Residential Area as per the Land Use Plan of MPD – 2021. The land has been allotted by Land and Development Office, Govt. of NCT, New Delhi. The total area of the project is 2,95,420.50sq. m out of which 1,62,481.28 sq. m (approx. 55% of plot area) will be developed as green area.
1.2 Clearance of existing land, vegetation and buildings? Yes There are trees, shrubs and saplings on the project site out of which 750 trees will be cleared and compensatory afforestation will be done as per the rules. The redevelopment of GPRA Colony requires the clearance of the existing residential buildings along with the other social infrastructure which accounts for the built up area of approx. 1,10,568.8sqm.
1.3 Creation of new land uses? No The project lies in the Zone F, Residential Area as per the Land Use Plan of MPD – 2021. The land has been allotted by Land & Development Office, Govt. of NCT of Delhi.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Pre-construction investigations such as hydro-geological investigation shall be carried out.
1.5 Construction works? Yes Redevelopment of GPRA colony includes demolition of existing buildings and construction of new buildings as per the modern amenities. The project envisages 9,39,484.55 sq. m. of built up area comprising Residential and Non Residential Buildings such as shop/market, school, health centre, office block and other buildings. During construction phase, temporary labour hutments will be constructed for workers.
1.6 Demolition works? Yes The project involves demolition of existing buildings. The project consists of Type I, Type II and Type III residential building and other Social Infrastructure. These buildings with the existing cumulative built up area aprox. 1,13,248.8 sqm will be demolished and in place of it; Residential buildings of Type II, Type III, Type IV, Type V and Type VI are proposed along with other social Infrastructure. Only one temple of built up area 2680 sq. m from the existing building will be retained.
1.7 Temporary sites used for construction works or housing of construction workers? Yes Temporary hutments will be provided for construction workers during construction phase.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes The project involves the redevelopment of Residential Colony; and the excavation will be carried out for laying foundation and 1 no. of basement.
1.9 Underground works including mining or tunnelling? No This project is meant for the redevelopment of GPRA Colony, Srinivaspuri and no underground work such as mining/tunnelingis required.
1.10 Reclamation works? No No reclamation work is involved.
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No There will be no production or manufacturing process involved. The project involves demolition of existing buildings; and construction of commercial and residential facilities.
1.14 Facilities for storage of goods or materials? Yes During construction phase, temporary storage room/ yards will be constructed for storage of construction material.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes During construction phase, septic tanks and waste collecting bins will be provided for disposal of liquid and solid wastes respectively. During Operation phase, there is provision of Sewage Treatment Plant of total capacity 2700 KLDwhich will be installed in separate phases,for treatment of liquid effluents. Treated effluent will be reused within the project premises to the maximum extent and the surplus will be used in nearby parks and other construction activities. Separate bins will be provid
1.16 Facilities for long term housing of operational workers? No Labour hutments will be provided onlyfor construction phase.
1.17 New road, rail or sea traffic during construction or operation? No The project site is located at a close distance of approx40 m from NH-2. No new road outside the project is proposed as part of the project. However, internal roads will be developed for smooth traffic circulation. Hazrat Nizamuddin Railway Station is approx. 2.5km away from the project site.No new rail network is proposed. Road traffic is likely to be impacted during construction and operation phases of project; No change in rail and sea traffic is anticipated.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc are not proposed in the project.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements is proposed in the project.
1.20 New or diverted transmission lines or pipelines? No No new or diverted transmission lines or pipelines are proposed
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There will not be any impoundment, damming, culverting, realignment or other changes likely to affect the hydrology of watercourses or aquifers.
1.22 Stream crossings? No There is no stream crossingin the vicinity of project area.
1.23 Abstraction or transfers of water from ground or surface waters? No No abstraction or transfer of water form ground or surface waters is proposed
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No In redevelopment of GPRA colony, adequate measures will be provided so that there will not be any changes in water bodies or the land surface affecting drainage or runoff.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Transport of personnel or materials for construction, operation will be by trucks, cars etc. during both construction and operation phases.
1.26 Long-term dismantling or decommissioning or restoration works? No The project doesn’t involve long-term dismantling or decommissioning or restoration works.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No decommissioning is proposed in the project.
1.28 Influx of people to an area in either temporarily or permanently? Yes There will be influx of people during construction phase. Approximately 500 workers will be employed during construction phase. They will be employed largely from local areas. During operation phase, 29,016 permanent population is estimated to occupy the Colony.
1.29 Introduction of alien species? No There will not be any introduction of alien species. Only native plant species will be used for landscaping.
1.30 Loss of native species or genetic diversity? Yes The project site is on old urban habitat, involving trees; shrubs and herbs, that are common to the Delhi. At present, 1600 trees are present in the project site out of which 750 trees will be re-located/fell with the prior permission of the Forest Department. The compensatory afforestation will ensure to maintain the current urban habitat.
1.31 Any other actions? No No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The project lies in the Residential Area as per the Land Use Plan of MPD-2021. The project involves the redevelopment of the existing GPRA Colony on a plot area 2,95,420.50 sq. m.
2.2 Water (expected source & competing users) unit: KLD Yes During the construction phase, it is estimated approx. 20 KLD of fresh water will be required for drinking purpose which will be procured from the local drinking water supplier during construction. The total water requirement during operation phase will be approx. 3593KLDwhich includes the fresh water requirement of 1936KLD and treated water requirement of 1657KLDfor flushing and horticulture. Fresh water requirement will be supplied by Delhi Jal Board
2.3 Minerals (MT) Yes Sand and stone aggregates will be used as Construction material.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Conventional construction material will be used. Energy efficient building materials will be used as specified in the Energy Conservation Building Code. The major materials used for the construction of the project shall be steel, cement, bricks, metal, flooring tiles/stones, sanitary and hardware items, electrical fittings and water etc. Steel and cement will be procured from authorized vendors. Sand & aggregate will be procured from local material suppliers.
2.5 Forests and timber (source – MT) Yes Timber will be required for doors and windows and will be purchased from local market.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The maximum demand load for the proposed project will be 27,849 KW for which 5 DG sets of 500 kVA capacity each will be installed as a power back up. Only low Sulphur diesel will be used for running the DG sets
2.7 Any other natural resources (use appropriate standard units) No No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No The project involves redevelopment of GPRA Colony in which storage of hazardous chemicals (as per MSIHC rules) will be required, except low sulphur diesel to run the D.G. sets.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No The project is the redevelopment of the GPRA Colony. With good housekeeping, no adverse impact is envisaged on disease profile of the region.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Redevelopment of GPRA Colony will create mass level employment thereby, improving the overall living index of the masses.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. Yes The redevelopment of the GPRA Colony involves the demotion of the existing infrastructure which may have adverse impact on the vulnerable groups. However, the demolition work will be carried out after the site barricading with GI sheets of 10 m height; to minimize the impact on the vulnerable groups
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No spoil, overburden, or mine wastes will be generated from the proposed project. Approx. 3,20,000 cubic meter of soil will be excavated for laying down foundation and basement; the excavated soil will be reused in backfilling and landscape development within the project site, to the extent feasible.
4.2 Municipal waste (domestic and or commercial wastes) Yes The solid waste generated from the project shall be mainly domestic waste and estimated quantity of the municipal waste shall be approx. 16,465.63kg per day. The municipal solid wastes will be managed as per the provision of Solid Waste Management Rules 2016.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The hazardous waste generated from the Residential Colony such as waste oil will be managed as per the provisions of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge generated from the Sewage Treatment Plant will be rich in organic content and used as an excellent fertilizer for horticultural purposes.
4.7 Construction or demolition wastes Yes Construction waste generation will be limited to the construction phase only and will be limited to project site only. These will be reused for backfilling and road construction within the site after manual segregation. Unusable and excess construction debris will be disposed at designated places in tune with the local norms.
4.8 Redundant machinery or equipment No No Redundant machinery or equipment is involved.
4.9 Contaminated soils or other materials No Soil contaminated with hazardous waste will be treated as hazardous waste. However, all precautions will be taken to ensure that the soil
4.10 Agricultural wastes Yes Approx. 8.03 kg/day of horticultural wastes
4.11 Other solid wastes Yes E-wastes which will be generated from the project will be handled as per the E-waste (Management) Rules, 2016.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Transportation of goods during construction phase and DG set operation will lead to air pollution. Management measures are proposed to mitigate the impacts. The operation of project does not envisage any major air pollutant generating sources except D.G. sets and vehicular movement. The DG sets will be a source of air emission during the operation phase in case of power failure. Stacks of adequate height will be provided (as per the CPCB norms) to disperse the pollutants generated from D.G Sets.
5.2 Emissions from production processes No There is no production process involved in the redevelopment of the GPRA Colony
5.3 Emissions from materials handling including storage or transport Yes There will be emissions from material handling, transportation and storage. Measures will be taken as per the proposed Environment Management Plan such as covering of construction material during transportation and storage, water sprinkler etc.
5.4 Emissions from construction activities including plant and equipment Yes There will be dust emission from construction activities. However,it is proposed to be mitigated by following best building construction practices such as providing dust screens, regular water sprinkling etc.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is likely to be generated during construction. Water sprinkler and tarpaulin covers will be provided over stored loose, raw material to reduce dust emission. On site sanitation facilities will be provided for construction workers during construction phase. Hence, no foul odour is envisaged.
5.6 Emissions from incineration of waste No No incineration of wastes is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No burning of waste is proposed.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The machinery which will be used for construction will be of high standard and will adhere to international standard. These standards take care of noise pollution / vibration and also air emissions. Hence, impacts due to construction machinery are envisaged to be insignificant. The construction activities will be restricted to daytime only. Sources of noise in the operational phase will be D.G. sets and vehicular movements. D.G. sets will be enclosed in acoustic enclosures. The D.G. Sets will be
6.2 From industrial or similar processes No No industrial processes are involved in the redevelopment of project
6.3 From construction or demolition Yes Due to the various construction and demolition activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities: Excavation activities, Concreting and mixing, Construction plant, Heavy vehicle movement and Operation of D.G. set.
6.4 From blasting or piling No No blasting is proposed and piling will be done in way that does not emanate noise pollution.
6.5 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase. The site shall be enclosed in the GI sheet barricades during the construction phase to reduce the impact of construction noise outside the project site. Tree plantation all around the project site and road sides in the operation phase will reduce the impact of the air and noise pollution.
6.6 From lighting or cooling systems Yes Machineries and equipment for lightening and cooling system having acoustic enclosure will be used to control noise pollution.
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes The used oil from D.G Set will be carefully stored in HDPE drums at isolated storage and periodically sold to authorized recyclers. All precaution will be taken to avoid spillage from storage as per the Hazardous and Other Wastes (Management & Transboundary Movement) Rules 2016.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There will be no discharge of untreated sewage on land or into water bodies. During construction phase, sewage will be collected in septic tanks. During operation phase, sewage will be treated in the proposed STPs of total 2700 KLD capacity (phase wise installation). Treated sewage from STP will be reused in flushing and landscaping and the surplus will be used in nearby parks and other construction activities.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Minor air emissions will be there due to increased vehicular movement and occasional use of D.G. sets for which effective measures will be taken like adequate greenbelt development and use of low sulphur diesel in D.G. sets etc.
7.4 From any other sources No No any other sources are involved except the mentioned above.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No There is no risk of long term buildup of pollutants in the environment.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No The project does not involve major hazardous construction activity. Hence chances of explosions, spillages, fires etc. are minimal. During construction, suitable personal protective equipment will be provided to all construction workers as required under the health & safety norms. Awareness & Training about safety norms will be provided to all the supervisors and construction workers involved in construction activities. No major hazardous waste will be stored within project site. The flattened g
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The proposed project lies outside any flood zone. It lies in zone IV of BIS seismic zone classification. Accordingly, the project has been designed accordingly. The project site lies in the plains and bears no chance of landslide.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The project comprises the redevelopment of the GPRA Colony which is likely to develop supporting services and infrastructure in and around the area. The project is as per the landuse of MPD2021. Hence, its water and power requirement has already been accounted for in the regional planning. The project shall manage the wastes and waste water generated within the site. There will be no industries.
9.2 Lead to after-use of the site, which could have an impact on the environment Yes The redevelopment of residential colony will lead a planned development and will have a positive impact on the environment.
9.3 Set a precedent for later developments Yes The redevelopment of GPRA Colony will set a precedent for many future developments.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes The redevelopment of residential colony lies in Sriniwaspuri where many other projects of similar nature exist. A better-planned and executed project has to yield better result individually. The old buildings are in dilapidated conditions and the need of hour is planning of a new habitat, keeping the increased demand for urban housing requirement. However, a traffic study will be carried out to assess the traffic impact of the proposed project on existing status.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Jahanpanah City Forest 3.0 Km SW Okhla Bird Sanctuary 3.5 Km E Asola Bhati Wildlife Sanctuary 6.5 Km S Central Ridge Reserve Forest 7.6 Km NW Northern Ridge Reserved Forest 12.0 Km N Rajokari Protected Forest 12.5 Km SW GarhiMendu PF 13.7 Km N
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Yamuna River 2.6 Km NNE Jahanpanah City Forest 3.0 Km SW Okhla Bird Sanctuary 3.5 Km E AsolaBhati Wildlife Sanctuary 6.5 Km S Central Ridge Reserve Forest 7.6 Km NW Northern Ridge Reserved Forest 12.0 Km N Rajokari Protected Forest 12.5 Km SW GarhiMendu PF 13.7 Km N
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Yamuna River 2.6 Km NNE Jahanpanah City Forest 3.0 Km SW Okhla Bird Sanctuary 3.5 Km E AsolaBhati Wildlife Sanctuary 6.5 Km S Central Ridge Reserve Forest 7.6 Km NW Northern Ridge Reserved Forest 12.0 Km N Rajokari Protected Forest 12.5 Km SW GarhiMendu PF 13.7 Km N
4 Inland, coastal, marine or underground waters Yes Yamuna River 2.6 KM NNE Nazafgarh nala 14 Km N
5 State, National boundaries Yes Delhi Uttar Pradesh Border 3.7 Km ; E
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes National Highway 2 - 0.4 Km; NE National Highway 24 -3.3 Km; N Hazarat Nizamuddin Railway Station 2.5 Km; N
7 Defence installations Yes Delhi Cantonment 10.4 Km NW
8 Densely populated or built-up area Yes Delhi 0 km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Gurudwara (Yadgaar Baba Banda Singh Bhahadur), Sriniwaspuri 0.27 Km E Arya Samaj Mandir -0.32 Km E Radha Krishana Temple 0.49 Km S Nurses Residential Complex, Sriniwaspuri 0.2 Km W Indian Oil Petrol Pump, Sriniwaspuri 0.6 Km W Cambridge School, Sriniwaspuri 0.2 Km W Leprosym Society 0.2 Km W
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Yamuna River 2.6 Km NNE Jahanpanah City Forest 3.0 Km SW Okhla Bird Sanctuary 3.5 Km E AsolaBhati Wildlife Sanctuary 6.5 Km S Central Ridge Reserve Forest 7.6 Km NW Northern Ridge Reserved Forest 12.0 Km N Rajokari Protected Forest 12.5 Km SW GarhiMendu PF 13.7 Km N
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Yes Okhla Industrial Area 3.5 Km SE Naraina Industrial Area 13.0 KM NW
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The area falls under zone IV for seismicity and earthquakes; the project area is not susceptible to flooding; landslide or erosion.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Site Plan
Form 1
ADS Letter
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe reply to the additional Detail Sought is attached herewith. Hope this meets to your satisfaction. Kindly grant the ToR at the earliest. 07 Dec 2018
2.NAKindly see the minutes of 35th meeting of EAC Infra-2 12 Nov 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantRavi
DesignationEE
Name of Company (Applicant Name should not be given here)CENTRAL PUBLIC WORKS DEPARTMENT
AddressE-Wing, Nirman Bhwan, New Delhi
Print