APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Redevelopment of staff colony at Azadpur | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/DL/NCP/100312/2019 | Project Cost | 180000000 lacs | |
| 2. | |
S. No. in the schedule | 8(b) Townships and Area Development projects.
| Project Sector | INFRA-1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 4,21,885.56 m2 ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 9.2 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Azadpur | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Azadpur | Town / Village | Azadpur | State of the project | Delhi | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Delhi | North West | Model Town | | 10. | |
Nearest railway station along with distance in kms | Azadpur Metro Station, 0.07 km | Nearest airport along with distance in kms | IGI Airport, 18.5 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Jahangir Puri , 0.35 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | North Delhi Municipal Corporation
Civic Centre Delhi | | 13. | Name of the Applicant | B | | 14. | Registered Address | O/o Addl. Deputy Commissioner (L&E) | | 15. | |
Address for correspondance: | Name of the Company | NORTH DELHI MUNICIPAL CORPORATION | Name of the Applicant | B | Designation (Owner/ Partner/ CEO) | AC | Pin code | 110033 | E-mail | azadpurdfi@gmail.com | Telephone No. | 120-4352889 | Fax No. | 120- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | No change in landuse, as site is already marked for residential staff quarters , comes under Zone-C | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | As redevelopment of the site shall be done so clearance of existing vegetation involve also the existing structure shall be demolished | 1.3 | Creation of new land uses? | Yes | New residential and commercial towers will be constructed | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil investigation, geotechnical survey and other testing is conducted. | 1.5 | Construction works? | Yes | construction works for building will involve however All construction activities of area will be confined within the project premises; there will be no physical changes outside the project boundary. Construction of building will be done systematically, with economy of materials and with due care on environmental protection. | 1.6 | Demolition works? | Yes | Site has pre existing structures which shall be demolished first so demolition works involve | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | All the construction activity including stocking of raw materials will be confined within the project site only. Inside the proposed site, a small area will be utilized temporarily for construction of sheds for the labor. Local labors from nearby area will be hired. Sanitation facilities will be developed at site. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Excavation will be carried out for foundation of building. The total excavated quantity of earth material for site area will be approx. 5 lakhs m3. The excavated soil will be re used in backfilling and other area development activities. | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | No | | 1.14 | Facilities for storage of goods or materials? | Yes | Raw material will be stored at site in a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | C& D waste during construction phase shall be stored at site and will be transport to the recycling plant , However Waste during operational stage shall be collected ans stored within site approx. 6.6 TPD waste generate, bio degradable waste of the site shall be sent to OWC, present within site and recyclable will be handed to approved vendor | 1.16 | Facilities for long term housing of operational workers? | No | Local laborers will be hired from nearby areas during construction phase. So, there will be no need to create permanent facilities for long-term housing of operational workers. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Since site is adjacent to GT Road,No new rail/road construction will be done | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | Yes | Closure or diversion of existing transport route shall affect traffic movement, but this will be of temporary phase. | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Construction Phase: It is estimated approx. 27 KLD of fresh water will be required for drinking purpose which will be imported in form of bottled cans from the local fresh water supplier during the days of construction.
It is envisaged that approx. 4846 ML of treated/fresh water will be required for the water curing of building structures.
Operational Phase:
Total water demand for the project including main and other uses will be 1,353 KLD. Main source of supply shall be municipal supply. Th | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | Currently there is no water bodies present at the site.
Runoff will increase due to increased paved surface. However, increased runoff will be managed by well-designed storm water drain network. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction Phase
During the construction phase, about 15-20 trucks are estimated per week for the transport of the material only as the local labor from the nearby area will be hired. However Adequate parking space within the project site for loading and unloading of materials will be provided.
Operational Phase:
Adequate parking space (5652 ECS) will be provided in operational phase.
Operational Phase:
Adequate parking space (5652 ECS) will be provided in operational phase. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | During Construction phase Local laborers from nearby area will be employed. So, influx of people is temporary.
In the operational phase, most of the expected occupants will be from the surrounding areas. Hence, the project will lead to a redistribution of occupants within the region. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | Yes | The project construction activities will necessarily comprise of removal of vegetation and tree cover from the site. Clearing of vegetation on the site will involve removal of local floral species found on the site. | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Land is developed as per the master plan | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water requirement for proposed project is 1,353 KLD. The fresh water will be obtained from water supply department of DJB. Efficient dual flushing fixtures will be provided for conservation of fresh water. There will be a dual plumbing system for use of water for different applications thus saving on the high quality water | 2.3 | Minerals (MT) | Yes | Minerals such as sand and aggregates will be required during the construction phase. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | All materials for construction will be arranged through select suppliers. | 2.5 | Forests and timber (source – MT) | Yes | All material forests and timber will be provided by selected suppliers. However steel frames etc. shall be used to minimize the use of timber. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Demand load estimated for project is approx. 9543.83 kVA | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Diesel for DG sets will be stored in drums in earmarked locations. It shall also be handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and Material Safety Data Sheet. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Suitable drainage and waste management measures (with frequent spray of insecticides etc.) will be adopted in both the construction and operational phase such that there will be no stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Green building will be sustainable and involve welfare of occupants | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | During construction phase, spoil and overburden waste is likely to be generated. As far as possible, the inert solid waste generated will be reused in construction work of roads/pavement depending upon the suitability of the material and the unused material shall be dumped to the closest land fill site. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | • It is estimated that maximum solid waste generation would be about 6,639 kg/day;• These solid wastes will be collected separately by putting separate bins at the source of generation • Bio-degradable waste will be subjected to the compost/resultant will be used as manure. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | | 4.4 | Other industrial process wastes | No | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge generated from the STP plant will be dried and later will be used as manure for green belt development. | 4.7 | Construction or demolition wastes | Yes | The construction waste will consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc.
Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | Yes | Landscape wastes of 1.5 kg/day will be generated. | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | The project does not envisage any major air pollution sources except operation of DG sets during power failure and vehicular traffic. | 5.2 | Emissions from production processes | Yes | No production processes involved. Hence, there will be no such emissions. | 5.3 | Emissions from materials handling including storage or transport | Yes | Small quantities of fugitive emissions are envisaged during transport and handling of construction materials. Such emissions will be temporary and controlled by the use of sprinkling and other viable techniques like covering of loose material. | 5.4 | Emissions from construction activities including plant and equipment | Yes | This will be restricted to the construction phase and the construction site only. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is anticipated during loading and unloading of construction material and excavation of upper earth surface. These will however be temporary in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Source of noise in the operational phase will be from backup DG sets (which will be in operation only during power failure) and pumps & motors. All the machinery will be of highest standard of reputed make and will comply with standard i.e. The DG set room will be provided with acoustic enclosure to have minimum 25 dB(A) insertion loss or for meeting the ambient noise standard whichever is on higher side as per E (P) Act, GSR 371 (E) and its amendments. Therefore, no significant impact due to op | 6.2 | From industrial or similar processes | No | | 6.3 | From construction or demolition | Yes | Due to various construction and demolition activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:
• Concreting, mixing & operation of DG sets.
• Construction plant and heavy vehicle movement. | 6.4 | From blasting or piling | No | | 6.5 | From construction or operational traffic | Yes | Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt. | 6.6 | From lighting or cooling systems | No | | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The used oil from DG sets will be carefully stored in HDPE drums at isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per The Hazardous Wastes (Management & Handling) Rules, 1989. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | There will be no discharge of untreated sewage on land or into water bodies. Adequate treatment of sewage will be carried out in a STP of capacity 1200 KLD, proposed within the project premises. Treated sewage will be re-used for flushing, landscaping and HVAC Cooling. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | The DG Sets will be provided with stacks of adequate height. Hence dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location. | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | To deal with any fire related accident, fire fighting facility of single handed hydrant valve, long hose reel, and portable fire extinguisher shall be provided. | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Building design is being done taking into consideration the natural disasters like, earthquake | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Appropriate infrastructure like roads, power supply, waste management and waste water treatment will be developed within the project site. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | Will lead to urban expansion of the city | 9.3 | Set a precedent for later developments | Yes | being designed and developed under IGBC gold rating, where principles of sustainability have been incorporated into the design. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | will have same impact as redevelopment take place in model town | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Central Ridge Forest-9 km | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Yamuna River-4.9 km
Naini lake- 1.3 km | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Central Ridge Forest-Approx. 9 km | 4 | Inland, coastal, marine or underground waters | No | | 5 | State, National boundaries | Yes | Delhi- UP Border-10 km
Delhi-HR Border-15 km | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | GT- Karnal Road-Adjacent,
Azadpur flyover- 0.46 km | 7 | Defence installations | No | | 8 | Densely populated or built-up area | Yes | Jahangir Puri-Approx. 0.35 km
Mauzi wal Bagh-Approx. 0.4 km | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Holy Child Public School-Approx. 0.4 km | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Yamuna River-Approx. 4.9 km | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | Earthquake- IV | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | B | Designation | AC | Name of Company (Applicant Name should not be given here) | NORTH DELHI MUNICIPAL CORPORATION | Address | O/o Addl. Deputy Commissioner (L&E) |
| |
|