APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Greenfield Steel Plant (Pellet Plant- 600000 TPA, DRI plant 420000 TPA, Billet Making using Induction Furnaces-400000 TPA, Automotive Components Manufacturing Facility-120000 TPA using Billets, Ferroalloy Plant-52000 TPA, and Captive Power Plant- 34 MW using WHRB and AFBC) at Borai Industrial Growth Centre, Rasmara, District Durg, Chhattisgarh by M/s Pushp Steels & Mining Pvt Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/CG/IND/85734/2018
Project Cost cr
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Land Area 11.421 ha, Proposed capacity-Iron ore pellets:600000 TPA, Sponge iron:420000 TPA, Steel Billets:400000 TPA, Automotive components: 120000 TPA, Ferroalloys: 52000 TPA and Electricity 34 MW ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 11.421 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectBorai Industrial Area, Rasmara,District Durg,CG
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot allotted by Chhattisgarh State Industrial Development Corporation Limited on Lease
Town / VillageRasmara
State of the projectChhattisgarh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)ChhattisgarhDurgDurg
(2.)Madhya PradeshChhindwaraSausar
10.
Nearest railway station along with distance in kms Rasmara, 1 km
Nearest airport along with distance in kms Raipur, 50 km
11. Nearest Town/City/District Headquarters along with distance in kms Durg , 7 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) The land is located in Borai Industrial Area of Chhattisgarh State Industrial Development Corporation Limited.Nearest Village Panchayat is located in Rasmara
13. Name of the Applicant Atul
14. Registered Address 751, Ground Floor, Kundewalan Street,
15.
Address for correspondance:
Name of the Company PUSHP STEELS AND MINING PVT LTD
Name of the Applicant Atul
Designation (Owner/ Partner/ CEO) Director
Pin code 110026
E-mail pushpsteels@gmail.com
Telephone No. 11-98101520
Fax No. 11-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? Yes
18. Whether separate application of Interlinked project has been submitted? Yes
19.
If Yes, MoEF file numberJ.11015/484/2006-IA.II(M)
Date of submission28/01/2008
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Land has been allotted in Industrial Area of CSIDC
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Data available
1.5 Construction works? Yes Plant and civil structures
1.6 Demolition works? No
1.7 Temporary sites used for construction works or housing of construction workers? No Construction workers are available in surrounding villages
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Plant and civil structures will be overground
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? Yes Production of Iron and Steel, Ferroalloys, Automotive components, iron ore pellets and electricity using conventional tested process
1.14 Facilities for storage of goods or materials? Yes Raw materials and finished products
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Water treatment plant will be made. Solid wastes will be utilized as per norms
1.16 Facilities for long term housing of operational workers? No
1.17 New road, rail or sea traffic during construction or operation? No Roads inside industrial area exists.Nearest railway siding is Rasmara, 1 km away
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? No CSIDC has committed to give water to the project located in Borai Industrial Area
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Storm water drains exists in the Borai Industrial Area
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Approach road to the project site exists. Transportation facility to the project site also exists
1.26 Long-term dismantling or decommissioning or restoration works? No
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? No Skilled, semi-skilled and unskilled workers are available in the UA-Durg-Bhilai
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No 11.421 ha land is industrial land given on lease by CSIDC
2.2 Water (expected source & competing users) unit: KLD Yes CSIDC has committed to give required water to the project. Overhead tank of CSIDC exists
2.3 Minerals (MT) Yes PP owns captive iron ore mines; obtained EC for 0.4 MTPA. Other mines (iron ore,dolomite, coal,Mn ore,etc are located in CG,MP and Odhisha
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction materials are available with local retailers
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) No
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Small quantity of HSD and LDO will be stored inside plant premises
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project will create employment for 1000 persons
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) Yes Commercial wastes will be sold to recyclers
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Spent oil and grease will be sold to authorised reprocessors
4.4 Other industrial process wastes Yes Slag and Dust will be utilized as per norms
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes Used as soil conditioner
4.7 Construction or demolition wastes Yes Shall be utilised inside the project site for road making, plinth filling
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes ESP and Bag filters will be used to control emissions. Concentration of pollutants will be kept within limits.
5.2 Emissions from production processes Yes ESP and Bag filters will be used to control emissions. Concentration of pollutants will be kept within limits. PM-30 mg/Nm3 SO2-300 mg/Nm3 NOx-300 mg/Nm3
5.3 Emissions from materials handling including storage or transport Yes Fugitive dust will be controlled using appropriate dust suppression measures
5.4 Emissions from construction activities including plant and equipment Yes Fugitive dust will be controlled using appropriate dust suppression measures
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Fugitive dust will be controlled using appropriate dust suppression measures
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise level will be restricted to 85 dBA by using appropriate noise dampening measures
6.2 From industrial or similar processes Yes Noise level will be restricted to 85 dBA by using appropriate noise dampening measures
6.3 From construction or demolition Yes Noise level will be restricted to 85 dBA by using appropriate noise dampening measures
6.4 From blasting or piling No
6.5 From construction or operational traffic Yes Noise level will be restricted to 85 dBA by using appropriate noise dampening measures
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Small quantity of HSD and LDO will be stored. OISD norms will be followed for risk mitigation. Disaster Management Plan will be prepared
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes ZLD will be followed. Entire wastewater will be treated and recycled and reused. Treated STP water will be used for greenery development
7.3 By deposition of pollutants emitted to air into the land or into water Yes All air emissions will be controlled and kept much below the discharge limits
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes OISD approved risk mitigation measures will be followed. DMP will be prepared.
8.2 From any other causes No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Billets will be used by rolling mills in Durg-Bhilai and Raipur region
9.2 Lead to after-use of the site, which could have an impact on the environment No
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes The industrial area have few iron and steel units (medium category). Their impact would be captured in the baseline environmental quality
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes small patch of forest is present 4 km west direction Shivnath river is present 2 km east direction
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area Yes Bhilai-Durg UA
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals, Schools,Places of Worship and Community Facilities of general nature exists allover Bhilai-Durg UA
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAtul
DesignationDirector
Name of Company (Applicant Name should not be given here)PUSHP STEELS AND MINING PVT LTD