APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Greenfield Steel Plant (Pellet Plant- 600000 TPA, DRI plant 420000 TPA, Billet Making using Induction Furnaces-400000 TPA, Automotive Components Manufacturing Facility-120000 TPA using Billets, Ferroalloy Plant-52000 TPA, and Captive Power Plant- 34 MW using WHRB and AFBC) at Borai Industrial Growth Centre, Rasmara, District Durg, Chhattisgarh by M/s Pushp Steels & Mining Pvt Ltd. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/CG/IND/85734/2018 | Project Cost | cr | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Land Area 11.421 ha, Proposed capacity-Iron ore pellets:600000 TPA, Sponge iron:420000 TPA, Steel Billets:400000 TPA, Automotive components: 120000 TPA, Ferroalloys: 52000 TPA and Electricity 34 MW ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 11.421 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Borai Industrial Area, Rasmara,District Durg,CG | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Plot allotted by Chhattisgarh State Industrial Development Corporation Limited on Lease | Town / Village | Rasmara | State of the project | Chhattisgarh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Chhattisgarh | Durg | Durg | (2.) | Madhya Pradesh | Chhindwara | Sausar | | 10. | |
Nearest railway station along with distance in kms | Rasmara, 1 km | Nearest airport along with distance in kms | Raipur, 50 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Durg , 7 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | The land is located in Borai Industrial Area of Chhattisgarh State Industrial Development Corporation Limited.Nearest Village Panchayat is located in Rasmara | | 13. | Name of the Applicant | Atul | | 14. | Registered Address | 751, Ground Floor, Kundewalan Street, | | 15. | |
Address for correspondance: | Name of the Company | PUSHP STEELS AND MINING PVT LTD | Name of the Applicant | Atul | Designation (Owner/ Partner/ CEO) | Director | Pin code | 110026 | E-mail | pushpsteels@gmail.com | Telephone No. | 11-98101520 | Fax No. | 11- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | Yes | | 18. | Whether separate application of Interlinked project has been submitted? | Yes | | 19. | If Yes, MoEF file number | J.11015/484/2006-IA.II(M) | Date of submission | 28/01/2008 | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Land has been allotted in Industrial Area of CSIDC | 1.2 | Clearance of existing land, vegetation and buildings? | No | | 1.3 | Creation of new land uses? | No | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Data available | 1.5 | Construction works? | Yes | Plant and civil structures | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Construction workers are available in surrounding villages | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Plant and civil structures will be overground | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | Yes | Production of Iron and Steel, Ferroalloys, Automotive components, iron ore pellets and electricity using conventional tested process | 1.14 | Facilities for storage of goods or materials? | Yes | Raw materials and finished products | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Water treatment plant will be made. Solid wastes will be utilized as per norms | 1.16 | Facilities for long term housing of operational workers? | No | | 1.17 | New road, rail or sea traffic during construction or operation? | No | Roads inside industrial area exists.Nearest railway siding is Rasmara, 1 km away | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | CSIDC has committed to give water to the project located in Borai Industrial Area | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | Storm water drains exists in the Borai Industrial Area | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Approach road to the project site exists. Transportation facility to the project site also exists | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Skilled, semi-skilled and unskilled workers are available in the UA-Durg-Bhilai | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | 11.421 ha land is industrial land given on lease by CSIDC | 2.2 | Water (expected source & competing users) unit: KLD | Yes | CSIDC has committed to give required water to the project. Overhead tank of CSIDC exists | 2.3 | Minerals (MT) | Yes | PP owns captive iron ore mines; obtained EC for 0.4 MTPA. Other mines (iron ore,dolomite, coal,Mn ore,etc are located in CG,MP and Odhisha | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials are available with local retailers | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | No | | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Small quantity of HSD and LDO will be stored inside plant premises | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The project will create employment for 1000 persons | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Commercial wastes will be sold to recyclers | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Spent oil and grease will be sold to authorised reprocessors | 4.4 | Other industrial process wastes | Yes | Slag and Dust will be utilized as per norms | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Used as soil conditioner | 4.7 | Construction or demolition wastes | Yes | Shall be utilised inside the project site for road making, plinth filling | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | ESP and Bag filters will be used to control emissions. Concentration of pollutants will be kept within limits. | 5.2 | Emissions from production processes | Yes | ESP and Bag filters will be used to control emissions. Concentration of pollutants will be kept within limits.
PM-30 mg/Nm3
SO2-300 mg/Nm3
NOx-300 mg/Nm3 | 5.3 | Emissions from materials handling including storage or transport | Yes | Fugitive dust will be controlled using appropriate dust suppression measures | 5.4 | Emissions from construction activities including plant and equipment | Yes | Fugitive dust will be controlled using appropriate dust suppression measures | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Fugitive dust will be controlled using appropriate dust suppression measures | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise level will be restricted to 85 dBA by using appropriate noise dampening measures | 6.2 | From industrial or similar processes | Yes | Noise level will be restricted to 85 dBA by using appropriate noise dampening measures | 6.3 | From construction or demolition | Yes | Noise level will be restricted to 85 dBA by using appropriate noise dampening measures | 6.4 | From blasting or piling | No | | 6.5 | From construction or operational traffic | Yes | Noise level will be restricted to 85 dBA by using appropriate noise dampening measures | 6.6 | From lighting or cooling systems | No | | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Small quantity of HSD and LDO will be stored. OISD norms will be followed for risk mitigation. Disaster Management Plan will be prepared | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | ZLD will be followed. Entire wastewater will be treated and recycled and reused. Treated STP water will be used for greenery development | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | All air emissions will be controlled and kept much below the discharge limits | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | OISD approved risk mitigation measures will be followed. DMP will be prepared. | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Billets will be used by rolling mills in Durg-Bhilai and Raipur region | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | 9.3 | Set a precedent for later developments | No | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | The industrial area have few iron and steel units (medium category). Their impact would be captured in the baseline environmental quality | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | small patch of forest is present 4 km west direction
Shivnath river is present 2 km east direction | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | 4 | Inland, coastal, marine or underground waters | No | | 5 | State, National boundaries | No | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | Yes | Bhilai-Durg UA | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, Schools,Places of Worship and Community Facilities of general nature exists allover Bhilai-Durg UA | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Atul | Designation | Director | Name of Company (Applicant Name should not be given here) | PUSHP STEELS AND MINING PVT LTD | Address | 751, Ground Floor, Kundewalan Street, |
| |
|