S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of 1.2MTPA dry coal washery to 2.4MTPA wet coal washery. Total capacity after expansion will be 3.6MTPA
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/CG/CMIN/60423/2016
Project Cost 1900 lacs
2.
S. No. in the schedule2(a) Coal washeries
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Expansion of 1.2MTPA dry coal washery to 2.4MTPA wet coal washery(Total capacity after expansion will be 3.6MTPA) ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/CG/CMIN/9723/2008
MoEFCC file number(Previous EC)J-11015/958/2007-IA.II(M)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 1.2 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectKhasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3; 743/1,2,4;745 Sirgitti Industrial area, Near Sirgitti Railway Crossing. Village : Parsada, Tahsil: Bilaspur, District : Bilaspur (C.G)
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3; 743/1,2,4;745
Town / VillageParsada
State of the projectChhattisgarh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)ChhattisgarhBilaspurBilaspur
10.
Nearest railway station along with distance in kms Dadhapada, 1.5 km
Nearest airport along with distance in kms Bilaspur, 4.5 km
11. Nearest Town/City/District Headquarters along with distance in kms Bilaspur , 1.5 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given)
13. Name of the Applicant Anil
14. Registered Address Maheshwari Coal Benefiacation and Infrastructure Pvt. Ltd.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3; 743/1,2,4;745 Sirgitti Industrial area, Sirgitti Railway Crossing. Village : Parsada Tahsil: Bilaspur Dist
15.
Address for correspondance:
Name of the Company MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED
Name of the Applicant Anil
Designation (Owner/ Partner/ CEO) Managing Director
Pin code 495004
E-mail maheshwari12568@gmail.com
Telephone No. 0712-2293225
Fax No. 0712-2293225
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Proposed land is in Industrial area. All expansion activity will be carried out in existing premises.The location of proposed washery is identified adjacent to existing dry coal washery because of availability of infrastructure, railway siding etc.
1.2 Clearance of existing land, vegetation and buildings? No Proposed land is free from vegetation and temporary use for raw coal storage
1.3 Creation of new land uses? No NA
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Will be initiated only after all approval, clearance & consent.
1.5 Construction works? Yes Office Building, Washery Plant etc.
1.6 Demolition works? No NA
1.7 Temporary sites used for construction works or housing of construction workers? No Worker required for construction will be arrange from nearby villages. Worker required for construction will be arrange from nearby villages.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Heavy Media Bath, Concrete Hoppers, Washing Tower , Conveyors, etc.
1.9 Underground works including mining or tunnelling? Yes Underground reclaimed tunnel below concrete hopper about 3- 3.5 m below ground level.
1.10 Reclamation works? No NA
1.11 Dredging? No NA
1.12 Offshore structures? No NA
1.13 Production and manufacturing processes? Yes Production 1.2 MMTPA washed coal on dry basis and 2.4MMTPA washed coal by heavy media bath technology. Total washed coal production after expansion will be 3.6MMTPA
1.14 Facilities for storage of goods or materials? Yes There will be sufficient space available for storing raw coal and coal rejected and washed coal which are a fast moving item.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes A well designed effluent treatment plant consisting of Thickener, High frequency screen, classifying cyclone etc is proposed. Entire effluent after treatment shall be reused in process. It shall be zero discharge unit.
1.16 Facilities for long term housing of operational workers? No NA
1.17 New road, rail or sea traffic during construction or operation? No Existing road network is well developed.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing road network is sufficient for new project
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No
1.20 New or diverted transmission lines or pipelines? No No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No
1.22 Stream crossings? No NA
1.23 Abstraction or transfers of water from ground or surface waters? Yes Ground water will be used for industrial and domestic purpose. Permission will be obtained from CGWA
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No NA
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Raw Coal will be received by truck. Washed coal will be transported by railway trolley and Tarpaulin covered trucks Reject will be transported by both tarpaulin covered trucks and rail.
1.26 Long-term dismantling or decommissioning or restoration works? No NA
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No NA
1.28 Influx of people to an area in either temporarily or permanently? Yes In addition to existing About 70 Construction workers for temporary period. About 100 Number of workers and staff required for operation of plant.
1.29 Introduction of alien species? No NA
1.30 Loss of native species or genetic diversity? No NA
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Expansion activity will be carried out in existing premises which is in industrial area.
2.2 Water (expected source & competing users) unit: KLD Yes The total water requirement for industrial use is 670 m3/ day, including for Industrial , Domestic and Dust Suppression purpose will be pumped out from bore wells within plant premises.
2.3 Minerals (MT) Yes Raw coal 3.6 MMTPA of Coal
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Shall be finalize after design and drawing. Source will be local market.
2.5 Forests and timber (source – MT) No NA
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total electrical power will be 300 KW. Source will be CSEDCL.100KW solar power generation unit already installed in the existing plant.
2.7 Any other natural resources (use appropriate standard units) No NA
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No NA
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No NA
3.3 Affect the welfare of people e.g. by changing living conditions? No Additional jobs available in proposed project will improve the socio – economic status by providing direct and indirect employment.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No NA
3.5 Any other causes No NA
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No NA
4.2 Municipal waste (domestic and or commercial wastes) Yes Only domestic waste 6 m3/day , and coal rejects @ 15-20 % of raw coal.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Only used machine oil shall generate during maintenance and overhauling and shall be stored in environment friendly manner and will be sold to registered oil vendors only.
4.4 Other industrial process wastes No The total rejects will be 15-20% of Raw coal i.e. maximum 0.72 MT/annum. Will be sold to nearby power plant, sponge iron plant and other plants .
4.5 Surplus product No NA
4.6 Sewage sludge or other sludge from effluent treatment Yes The sludge generated at thicker and High frequency screen will be finally blended with rejects coal.
4.7 Construction or demolition wastes No NA
4.8 Redundant machinery or equipment No NA
4.9 Contaminated soils or other materials No NA
4.10 Agricultural wastes No NA
4.11 Other solid wastes No NA
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Operation of dumpers and trucks used for the transport of coal and washed coal. The washed coal shall be transported by railways, railway siding is existing within plant layout.
5.2 Emissions from production processes Yes Crushing and Screening operations during washing process generates dust. Air Pollution Control Devices will be installed.
5.3 Emissions from materials handling including storage or transport Yes Due to handling of raw material i.e. coal. Dust suppression system are proposed to control dust. Sprinkler will be install at appropriate location
5.4 Emissions from construction activities including plant and equipment Yes The fugitive dust will be confined to construction , loading, and unloading of material only, it shall be negligible.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Fugitive emission will be generated due to construction activity. It will be controlled by water spraying
5.6 Emissions from incineration of waste No NA
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No NA
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Operation of Machineries, Movements of Vehicles shall generate noise.
6.2 From industrial or similar processes Yes Noise will be generated during operation of machinery.
6.3 From construction or demolition No NA
6.4 From blasting or piling No NA
6.5 From construction or operational traffic No NA
6.6 From lighting or cooling systems No NA
6.7 From any other sources No NA
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No NA
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No It is a Zero Discharge , Close Circuit industry with no discharge out of the premises . Entire effluent after treatment shall be reused for coal washing purpose.
7.3 By deposition of pollutants emitted to air into the land or into water No NA
7.4 From any other sources No NA
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No NA
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Coal is combustible material which can burn due to spontaneous heating if stock for long time. Emergency plan and proper arrangements for firefighting will be provided.
8.2 From any other causes No NA
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Earthquake, Cloudburst. Emergency preparedness plan will be prepared.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Employment Generation
9.2 Lead to after-use of the site, which could have an impact on the environment No NA
9.3 Set a precedent for later developments No NA
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Use of washed Coal is an environmental friendly activity. The inherited ash content of the coal along with sulphur is reduced from the coal during washing. Consequently, the emission of ash and sulphur during combustion of industrial use gets reduced.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No NA
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No NA
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No NA
4 Inland, coastal, marine or underground waters No NA
5 State, National boundaries No NA
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No NA
7 Defence installations No NA
8 Densely populated or built-up area Yes Bilaspur at 4.5Km North direction.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No NA
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Apra River 6 Km at North direction
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No NA
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No NA
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
5Uploaded Approval of mining PlanAnnexure-Uploaded Approval of mining plan
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAnil
DesignationManaging Director
Name of Company (Applicant Name should not be given here)MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED
AddressMaheshwari Coal Benefiacation and Infrastructure Pvt. Ltd.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3; 743/1,2,4;745 Sirgitti Industrial area, Sirgitti Railway Crossing. Village : Parsada Tahsil: Bilaspur Dist