APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Expansion of 1.2MTPA dry coal washery to 2.4MTPA wet coal washery. Total capacity after expansion will be 3.6MTPA | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/CG/CMIN/60423/2016 | Project Cost | 1900 lacs | |
| 2. | |
S. No. in the schedule | 2(a) Coal washeries
| Project Sector | Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Expansion of 1.2MTPA dry coal washery to 2.4MTPA wet coal washery(Total capacity after expansion will be 3.6MTPA) ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/CG/CMIN/9723/2008 | MoEFCC file number(Previous EC) | J-11015/958/2007-IA.II(M) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 1.2 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3; 743/1,2,4;745 Sirgitti Industrial area, Near Sirgitti Railway Crossing. Village : Parsada, Tahsil: Bilaspur, District : Bilaspur (C.G) | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3;
743/1,2,4;745 | Town / Village | Parsada | State of the project | Chhattisgarh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Chhattisgarh | Bilaspur | Bilaspur | | 10. | |
Nearest railway station along with distance in kms | Dadhapada, 1.5 km | Nearest airport along with distance in kms | Bilaspur, 4.5 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Bilaspur , 1.5 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | | | 13. | Name of the Applicant | Anil | | 14. | Registered Address | Maheshwari Coal Benefiacation and Infrastructure Pvt. Ltd.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3;
743/1,2,4;745
Sirgitti Industrial area, Sirgitti Railway Crossing.
Village : Parsada
Tahsil: Bilaspur
Dist | | 15. | |
Address for correspondance: | Name of the Company | MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED | Name of the Applicant | Anil | Designation (Owner/ Partner/ CEO) | Managing Director | Pin code | 495004 | E-mail | maheshwari12568@gmail.com | Telephone No. | 0712-2293225 | Fax No. | 0712-2293225 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Proposed land is in Industrial area. All expansion activity will be carried out in existing premises.The location of proposed washery is identified adjacent to existing dry coal washery because of availability of infrastructure, railway siding etc. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Proposed land is free from vegetation and temporary use for raw coal storage | 1.3 | Creation of new land uses? | No | NA | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Will be initiated only after all approval, clearance & consent. | 1.5 | Construction works? | Yes | Office Building, Washery Plant etc. | 1.6 | Demolition works? | No | NA | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Worker required for construction will be arrange from nearby villages.
Worker required for construction will be arrange from nearby villages. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Heavy Media Bath, Concrete Hoppers, Washing Tower , Conveyors, etc. | 1.9 | Underground works including mining or tunnelling? | Yes | Underground reclaimed tunnel below concrete hopper about 3- 3.5 m below ground level. | 1.10 | Reclamation works? | No | NA | 1.12 | Offshore structures? | No | NA | 1.13 | Production and manufacturing processes? | Yes | Production 1.2 MMTPA washed coal on dry basis and 2.4MMTPA washed coal by heavy media bath technology.
Total washed coal production after expansion will be 3.6MMTPA | 1.14 | Facilities for storage of goods or materials? | Yes | There will be sufficient space available for storing raw coal and coal rejected and washed coal which are a fast moving item. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | A well designed effluent treatment plant consisting of Thickener, High frequency screen, classifying cyclone etc is proposed. Entire effluent after treatment shall be reused in process. It shall be zero discharge unit. | 1.16 | Facilities for long term housing of operational workers? | No | NA | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing road network is well developed. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Existing road network is sufficient for new project | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No | 1.20 | New or diverted transmission lines or pipelines? | No | No | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No | 1.22 | Stream crossings? | No | NA | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Ground water will be used for industrial and domestic purpose. Permission will be obtained from CGWA | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | NA | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Raw Coal will be received by truck. Washed coal will be transported by railway trolley and Tarpaulin covered trucks Reject will be transported by both tarpaulin covered trucks and rail. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | NA | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | NA | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | In addition to existing About 70 Construction workers for temporary period. About 100 Number of workers and staff required for operation of plant. | 1.29 | Introduction of alien species? | No | NA | 1.30 | Loss of native species or genetic diversity? | No | NA | 1.31 | Any other actions? | No | NA | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Expansion activity will be carried out in existing premises which is in industrial area. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The total water requirement for industrial use is 670 m3/ day, including for Industrial , Domestic and Dust Suppression purpose will be pumped out from bore wells within plant premises. | 2.3 | Minerals (MT) | Yes | Raw coal 3.6 MMTPA of Coal | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Shall be finalize after design and drawing. Source will be local market. | 2.5 | Forests and timber (source – MT) | No | NA | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Total electrical power will be 300 KW. Source will be CSEDCL.100KW solar power generation unit already installed in the existing plant. | 2.7 | Any other natural resources (use appropriate standard units) | No | NA | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | NA | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | NA | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Additional jobs available in
proposed project will improve
the socio – economic status by providing direct and indirect employment. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | NA | 3.5 | Any other causes | No | NA | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | NA | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Only domestic waste 6 m3/day , and coal rejects @ 15-20 % of raw coal. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Only used machine oil shall generate during maintenance
and overhauling and shall be
stored in environment
friendly manner and will be sold to
registered oil vendors only. | 4.4 | Other industrial process wastes | No | The total rejects will be 15-20% of Raw coal i.e. maximum 0.72 MT/annum. Will be sold to nearby power plant, sponge iron plant and other plants . | 4.5 | Surplus product | No | NA | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | The sludge generated at thicker and High frequency screen will be finally blended with rejects coal. | 4.7 | Construction or demolition wastes | No | NA | 4.8 | Redundant machinery or equipment | No | NA | 4.9 | Contaminated soils or other materials | No | NA | 4.10 | Agricultural wastes | No | NA | 4.11 | Other solid wastes | No | NA | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Operation of dumpers and trucks used for the transport of coal and washed coal. The washed coal shall be transported by railways, railway siding is existing within plant layout. | 5.2 | Emissions from production processes | Yes | Crushing and Screening operations during washing process generates dust. Air Pollution Control Devices will be installed. | 5.3 | Emissions from materials handling including storage or transport | Yes | Due to handling of raw material i.e. coal. Dust suppression system are proposed to control dust.
Sprinkler will be install at appropriate location | 5.4 | Emissions from construction activities including plant and equipment | Yes | The fugitive dust will be confined to construction , loading, and unloading of material only, it shall be negligible. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Fugitive emission will be generated due to construction activity. It will be controlled by water spraying | 5.6 | Emissions from incineration of waste | No | NA | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | NA | 5.8 | Emissions from any other sources | No | NA | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Operation of Machineries,
Movements of Vehicles shall generate noise. | 6.2 | From industrial or similar processes | Yes | Noise will be generated during operation of machinery. | 6.3 | From construction or demolition | No | NA | 6.4 | From blasting or piling | No | NA | 6.5 | From construction or operational traffic | No | NA | 6.6 | From lighting or cooling systems | No | NA | 6.7 | From any other sources | No | NA | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | NA | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | It is a Zero Discharge , Close Circuit industry with no discharge out of the premises . Entire effluent after treatment shall be reused for coal washing purpose. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | NA | 7.4 | From any other sources | No | NA | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | NA | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Coal is combustible material which can burn due to spontaneous heating if stock for long time. Emergency plan and proper arrangements for firefighting will be provided. | 8.2 | From any other causes | No | NA | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Earthquake, Cloudburst. Emergency preparedness plan will be prepared. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | Employment Generation | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | NA | 9.3 | Set a precedent for later developments | No | NA | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Use of washed Coal is an environmental friendly activity. The inherited ash content of the coal along with sulphur is reduced from the coal during washing. Consequently, the emission of ash and sulphur during combustion of industrial use gets reduced. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | NA | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | NA | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | NA | 4 | Inland, coastal, marine or underground waters | No | NA | 5 | State, National boundaries | No | NA | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | NA | 7 | Defence installations | No | NA | 8 | Densely populated or built-up area | Yes | Bilaspur at 4.5Km North direction. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | NA | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Apra River 6 Km at North direction | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | NA | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | NA | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Anil | Designation | Managing Director | Name of Company (Applicant Name should not be given here) | MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED | Address | Maheshwari Coal Benefiacation and Infrastructure Pvt. Ltd.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3;
743/1,2,4;745
Sirgitti Industrial area, Sirgitti Railway Crossing.
Village : Parsada
Tahsil: Bilaspur
Dist |
| |
|