APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Dindi Chemical and Pharma Park | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/AP/NCP/73368/2018 | Project Cost | 270000 lacs | |
| 2. | |
S. No. in the schedule | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| Project Sector | INFRA-1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 628.18 ha ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Sy no 87-96,123 -132, 250-275, 289, 291, 299, 400-404, 428, 433, 443-480, 798-805, 807-816, 823-825, 830, 865-871, 875-877, 1007-1051, Dindi Village, Nizampatnam Mandal, Guntur, Andhra Pradesh. | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Dindi Village, Nizampatnam Mandal, Guntur, Andhra Pradesh. | Town / Village | Dindi Village, Nizampatnam Mandal, Guntur, Andhra Pradesh. | State of the project | Andhra Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Andhra Pradesh | Guntur | Nizampatnam | | 10. | |
Nearest railway station along with distance in kms | Repalle -15 km – Northeast direction, 15 km | Nearest airport along with distance in kms | Gannavaram - 70 Km – Northeast direction, 70 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Repalle -15 km – Northeast direction , 15 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Mr.N. Radha Krishana.,
Managing Director
Sireen Drugs Pvt Ltd, G-21, Madhura Nagar,Hyderabad -500038
500038
sireendindi@gmail.com
9848944207
040-23547940 | | 13. | Name of the Applicant | Radhakrishna | | 14. | Registered Address | Mr N Radha Krishna
Sireen Drugs Pvt Ltd,
G - 21, Madhura NAgar, Hyderabad - 500038
040-23547940
9848944207
sireendindi@gmail.com | | 15. | |
Address for correspondance: | Name of the Company | DINDI CHEMICAL AND PHARMA PARK LTD | Name of the Applicant | Radhakrishna | Designation (Owner/ Partner/ CEO) | managingdirector | Pin code | 500038 | E-mail | sireendindi@gmail.com | Telephone No. | 040-23547940 | Fax No. | 040- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | Yes | Status | Application for Wildlife Clearance yet to be submitted | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | Yes | | | | 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The total land area is 682.16 Ha located in Dindi village, Nizampatnam Mandal, Guntur district. The land use at present is agricultural; plantation consisting of mainly palmyra trees, and rain fed agriculture of groundnut if the season permits in an area of 500 acres. The balance area consists of mainly barren areas. The agricultural activity is not intensive. The land use shall change to industrial subsequent to the development of industrial area. The area statement for the proposed industrial | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Clearance of land in few pockets of palmyra plantation is required. The area of palmyra plantation to be cleared is in the order of 200 acres and the numbers of trees are 1140. | 1.3 | Creation of new land uses? | Yes | The land use shall be converted to industrial from agricultural use. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Pre construction investigations are yet to be initiated. | 1.5 | Construction works? | Yes | Primary infrastructure of the industrial estate shall be taken up after obtaining the | 1.6 | Demolition works? | Yes | The total land area is 682.16 Ha located in Dindi village, Nizampatnam Mandal, Guntur district. The land use at present is agricultural; plantation consisting of mainly palmyra trees, and rain fed agriculture of groundnut if the season permits in an area of 500 acres. The balance area consists of mainly barren areas. The agricultural activity is not intensive. The land use shall change to industrial subsequent to the development of industrial area. The area statement for the proposed industrial | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Local labor shall be used | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Preliminary investigations show that the earth work involved is minimal. | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | Yes | Marine disposal of treated effluents is proposed. | 1.13 | Production and manufacturing processes? | No | The project is for the establishment of industrial estate and the subsequent operations include production and manufacturing of Active pharma ingredients, Fine Chemcials and Formulations of APIs. | 1.14 | Facilities for storage of goods or materials? | Yes | It is proposed to provide central storage facility for solvents and few commonly used chemicals. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | The effluents from process and utilities sources shall be treated and sent to marine disposal after achieving the marine disposal standards. The domestic effluents shall be treated and reused for on land irrigation. | 1.16 | Facilities for long term housing of operational workers? | No | | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Additional traffic is anticipated during the construction and subsequent operation of units. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Widening of the existing district road shall be taken up by the District Administration. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Abstraction of water during construction is anticipated. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Abstraction of water during construction is anticipConstruction activity of the industrial estate involves transport of men and material during construction. The existing road net work is being strengthened by district administration.ated. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The area is expected to develop socioeconomically, with additional employment generation. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | The loss shall be limited to a number of Palmyra Trees, which shall be compensated by the proposed green belt area. | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | The present use of land is mainly barren and few patches of land are used for rain fed agriculture. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | 500 KLD form Good water channel. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Aggregate : 8000 Cum (Vadlamudi 30 km away)
Soil : 5000 cum | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | 45 MW, APTRANSCO, alternatively captive generation using coal as fuel is proposed.
Fuel : Coal Quantity required : 36 TPH | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | The construction of industrial estate involves consumption of minor quantities of hazardous chemicals like fuels etc. The operation of industrial estate however shall use hazardous chemicals. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The local area is backward and agriculture income in the area is very low. The establishment of industrial estate shall enhance the socio economic status of the area. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | The expected wastes are domestic, construction debris and containers of paints thinners etc. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Waste oils and used batteries from DG sets | 4.4 | Other industrial process wastes | Yes | Industrial wastes which may be hazardous in nature are anticipated. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge from STP and Effluent treatment system are expected. | 4.7 | Construction or demolition wastes | Yes | Shall be disposed in low lying areas. | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Combustion equipment; Boiler, DG sets. | 5.2 | Emissions from production processes | Yes | The proposed industrial estate shall house a number of chemical and pharmaceutical industrial estates. The manufacturing process of various chemical and active pharmaceutical ingredients shall release process emissions of HCl, CO2, H2, etc. | 5.3 | Emissions from materials handling including storage or transport | Yes | Fugitive emissions are expected. | 5.4 | Emissions from construction activities including plant and equipment | Yes | DG sets and vehicles | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is anticipated during construction | 5.6 | Emissions from incineration of waste | Yes | Incinerator is proposed during the operation stage of the project. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | Yes | SO2,NOX emissions from Boilers etc | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise anticipated from DG sets and turbines. | 6.2 | From industrial or similar processes | Yes | From DG sets and Power house. | 6.3 | From construction or demolition | Yes | The noise levels shall not have any major impact. | 6.4 | From blasting or piling | No | No blasting activity is anticipated. | 6.5 | From construction or operational traffic | Yes | marginal increase | 6.6 | From lighting or cooling systems | Yes | Cooling towers may generate noise levels. | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The process chemicals, solvents etc. may spill, if handled improperly. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Waste water from domestic sources shall be treated and reused for on land irrigation for the development of green belt. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | During construction dust is anticipated to raise which shall be mitigated by water sprinkling. During operation phase of the Industrial Estate, emissions from textiles, and fugitive sources anticipated which shall be mitigated. | 7.4 | From any other sources | No | Process emissions from individual units during operation. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Central solvent storage yard and chemical storage areas have potential for spillages which should be mitigated. | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Design shall include the protection from the same. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The development of industrial estate shall enhance the lifestyle and socioeconomics of the local area. The industrial estate shall provide the necessary infrastructure by way of roads, power supply, effluent treatment system, solid waste management facility. During operation of the Industrial estate shall generate employment to both locals and outsides increasing demand for housing. The establishment of industrial estate shall lead to development of service industries in the neighboring villages | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | 9.3 | Set a precedent for later developments | Yes | The development of industrial estate based on sustainable development principles shall set the trend for similar industrial estates. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Krishna sanctuary located at a distance of 3.5 km in SE direction from the site. The sanctuary is spread over an area of 194.81 sq. km located in the Krishna sanctuary bordering Krishna and Guntur districts. The plant species found are Rhizospora, Avicenia, Somneratia, Aegiceros. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | The site area is at a distance of 1 km from the Bay of Bengal. Small reserve forests consisting of monoculture of Eucalyptus and shrubs are observed in the neighboring areas. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | 4 | Inland, coastal, marine or underground waters | Yes | Bay of Bengal coast is located at a distance of 1 km. | 5 | State, National boundaries | Yes | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | No | The | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | The sensitive man made uses are mainly found in Nizampatnam which is a mandal head quarters. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | The area is underdeveloped | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 07 Jun 2018 | 2. | NA | 1.Krishna sanctuary located at a distance of 3.5 km in SE direction from the site.But in Form-1 application it was mentioned that the project does not attracts wild life protection act 1972.Please clarriffy | 07 Jun 2018 | 3. | NA | The correction have been made as per the instruction received | 05 Jun 2018 | 4. | NA | 1.Please submit Earlier ToR and EC letters issued by Ministry
2.Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? as mentioned form-1 not required but Krishna sanctuary located at a distance of 3.5 km
3.Submit Topo plan showing boundary of sanctuary and proposed pharma park
4.List of industries proposed category wise in Pharma park
5.Plan showing proposed proposed falling in CRZ area with details details | 17 Apr 2018 | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | EAC sought land acquisition details. | 09 Jul 2018 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Radhakrishna | Designation | managingdirector | Name of Company (Applicant Name should not be given here) | DINDI CHEMICAL AND PHARMA PARK LTD | Address | Mr N Radha Krishna
Sireen Drugs Pvt Ltd,
G - 21, Madhura NAgar, Hyderabad - 500038
040-23547940
9848944207
sireendindi@gmail.com |
|
|