APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Dindi Chemical and Pharma Park
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/AP/NCP/73368/2018
Project Cost 270000 lacs
2.
S. No. in the schedule7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Project Sector INFRA-1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 628.18 ha ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSy no 87-96,123 -132, 250-275, 289, 291, 299, 400-404, 428, 433, 443-480, 798-805, 807-816, 823-825, 830, 865-871, 875-877, 1007-1051, Dindi Village, Nizampatnam Mandal, Guntur, Andhra Pradesh.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Dindi Village, Nizampatnam Mandal, Guntur, Andhra Pradesh.
Town / VillageDindi Village, Nizampatnam Mandal, Guntur, Andhra Pradesh.
State of the projectAndhra Pradesh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Andhra PradeshGunturNizampatnam
10.
Nearest railway station along with distance in kms Repalle -15 km – Northeast direction, 15 km
Nearest airport along with distance in kms Gannavaram - 70 Km – Northeast direction, 70 km
11. Nearest Town/City/District Headquarters along with distance in kms Repalle -15 km – Northeast direction , 15 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Mr.N. Radha Krishana., Managing Director Sireen Drugs Pvt Ltd, G-21, Madhura Nagar,Hyderabad -500038 500038 sireendindi@gmail.com 9848944207 040-23547940
13. Name of the Applicant Radhakrishna
14. Registered Address Mr N Radha Krishna Sireen Drugs Pvt Ltd, G - 21, Madhura NAgar, Hyderabad - 500038 040-23547940 9848944207 sireendindi@gmail.com
15.
Address for correspondance:
Name of the Company DINDI CHEMICAL AND PHARMA PARK LTD
Name of the Applicant Radhakrishna
Designation (Owner/ Partner/ CEO) managingdirector
Pin code 500038
E-mail sireendindi@gmail.com
Telephone No. 040-23547940
Fax No. 040-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?Yes
StatusApplication for Wildlife Clearance yet to be submitted
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?Yes
22.
Whether there is any Government Order/Policy relevant/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The total land area is 682.16 Ha located in Dindi village, Nizampatnam Mandal, Guntur district. The land use at present is agricultural; plantation consisting of mainly palmyra trees, and rain fed agriculture of groundnut if the season permits in an area of 500 acres. The balance area consists of mainly barren areas. The agricultural activity is not intensive. The land use shall change to industrial subsequent to the development of industrial area. The area statement for the proposed industrial
1.2 Clearance of existing land, vegetation and buildings? Yes Clearance of land in few pockets of palmyra plantation is required. The area of palmyra plantation to be cleared is in the order of 200 acres and the numbers of trees are 1140.
1.3 Creation of new land uses? Yes The land use shall be converted to industrial from agricultural use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Pre construction investigations are yet to be initiated.
1.5 Construction works? Yes Primary infrastructure of the industrial estate shall be taken up after obtaining the
1.6 Demolition works? Yes The total land area is 682.16 Ha located in Dindi village, Nizampatnam Mandal, Guntur district. The land use at present is agricultural; plantation consisting of mainly palmyra trees, and rain fed agriculture of groundnut if the season permits in an area of 500 acres. The balance area consists of mainly barren areas. The agricultural activity is not intensive. The land use shall change to industrial subsequent to the development of industrial area. The area statement for the proposed industrial
1.7 Temporary sites used for construction works or housing of construction workers? No Local labor shall be used
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Preliminary investigations show that the earth work involved is minimal.
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? Yes Marine disposal of treated effluents is proposed.
1.13 Production and manufacturing processes? No The project is for the establishment of industrial estate and the subsequent operations include production and manufacturing of Active pharma ingredients, Fine Chemcials and Formulations of APIs.
1.14 Facilities for storage of goods or materials? Yes It is proposed to provide central storage facility for solvents and few commonly used chemicals.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The effluents from process and utilities sources shall be treated and sent to marine disposal after achieving the marine disposal standards. The domestic effluents shall be treated and reused for on land irrigation.
1.16 Facilities for long term housing of operational workers? No
1.17 New road, rail or sea traffic during construction or operation? Yes Additional traffic is anticipated during the construction and subsequent operation of units.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Widening of the existing district road shall be taken up by the District Administration.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? Yes Abstraction of water during construction is anticipated.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Abstraction of water during construction is anticipConstruction activity of the industrial estate involves transport of men and material during construction. The existing road net work is being strengthened by district administration.ated.
1.26 Long-term dismantling or decommissioning or restoration works? No
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? Yes The area is expected to develop socioeconomically, with additional employment generation.
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No The loss shall be limited to a number of Palmyra Trees, which shall be compensated by the proposed green belt area.
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes The present use of land is mainly barren and few patches of land are used for rain fed agriculture.
2.2 Water (expected source & competing users) unit: KLD Yes 500 KLD form Good water channel.
2.3 Minerals (MT) No
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Aggregate : 8000 Cum (Vadlamudi 30 km away) Soil : 5000 cum
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 45 MW, APTRANSCO, alternatively captive generation using coal as fuel is proposed. Fuel : Coal Quantity required : 36 TPH
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes The construction of industrial estate involves consumption of minor quantities of hazardous chemicals like fuels etc. The operation of industrial estate however shall use hazardous chemicals.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The local area is backward and agriculture income in the area is very low. The establishment of industrial estate shall enhance the socio economic status of the area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) Yes The expected wastes are domestic, construction debris and containers of paints thinners etc.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Waste oils and used batteries from DG sets
4.4 Other industrial process wastes Yes Industrial wastes which may be hazardous in nature are anticipated.
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from STP and Effluent treatment system are expected.
4.7 Construction or demolition wastes Yes Shall be disposed in low lying areas.
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Combustion equipment; Boiler, DG sets.
5.2 Emissions from production processes Yes The proposed industrial estate shall house a number of chemical and pharmaceutical industrial estates. The manufacturing process of various chemical and active pharmaceutical ingredients shall release process emissions of HCl, CO2, H2, etc.
5.3 Emissions from materials handling including storage or transport Yes Fugitive emissions are expected.
5.4 Emissions from construction activities including plant and equipment Yes DG sets and vehicles
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is anticipated during construction
5.6 Emissions from incineration of waste Yes Incinerator is proposed during the operation stage of the project.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources Yes SO2,NOX emissions from Boilers etc
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise anticipated from DG sets and turbines.
6.2 From industrial or similar processes Yes From DG sets and Power house.
6.3 From construction or demolition Yes The noise levels shall not have any major impact.
6.4 From blasting or piling No No blasting activity is anticipated.
6.5 From construction or operational traffic Yes marginal increase
6.6 From lighting or cooling systems Yes Cooling towers may generate noise levels.
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The process chemicals, solvents etc. may spill, if handled improperly.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Waste water from domestic sources shall be treated and reused for on land irrigation for the development of green belt.
7.3 By deposition of pollutants emitted to air into the land or into water No During construction dust is anticipated to raise which shall be mitigated by water sprinkling. During operation phase of the Industrial Estate, emissions from textiles, and fugitive sources anticipated which shall be mitigated.
7.4 From any other sources No Process emissions from individual units during operation.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Central solvent storage yard and chemical storage areas have potential for spillages which should be mitigated.
8.2 From any other causes No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Design shall include the protection from the same.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The development of industrial estate shall enhance the lifestyle and socioeconomics of the local area. The industrial estate shall provide the necessary infrastructure by way of roads, power supply, effluent treatment system, solid waste management facility. During operation of the Industrial estate shall generate employment to both locals and outsides increasing demand for housing. The establishment of industrial estate shall lead to development of service industries in the neighboring villages
9.2 Lead to after-use of the site, which could have an impact on the environment No
9.3 Set a precedent for later developments Yes The development of industrial estate based on sustainable development principles shall set the trend for similar industrial estates.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Krishna sanctuary located at a distance of 3.5 km in SE direction from the site. The sanctuary is spread over an area of 194.81 sq. km located in the Krishna sanctuary bordering Krishna and Guntur districts. The plant species found are Rhizospora, Avicenia, Somneratia, Aegiceros.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes The site area is at a distance of 1 km from the Bay of Bengal. Small reserve forests consisting of monoculture of Eucalyptus and shrubs are observed in the neighboring areas.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters Yes Bay of Bengal coast is located at a distance of 1 km.
5 State, National boundaries Yes
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area No The
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No The sensitive man made uses are mainly found in Nizampatnam which is a mandal head quarters.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No The area is underdeveloped
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Secretary to APIISC Commissioner of industires
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 07 Jun 2018
2.NA1.Krishna sanctuary located at a distance of 3.5 km in SE direction from the site.But in Form-1 application it was mentioned that the project does not attracts wild life protection act 1972.Please clarriffy 07 Jun 2018
3.NAThe correction have been made as per the instruction received 05 Jun 2018
4.NA1.Please submit Earlier ToR and EC letters issued by Ministry 2.Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? as mentioned form-1 not required but Krishna sanctuary located at a distance of 3.5 km 3.Submit Topo plan showing boundary of sanctuary and proposed pharma park 4.List of industries proposed category wise in Pharma park 5.Plan showing proposed proposed falling in CRZ area with details details 17 Apr 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAEAC sought land acquisition details. 09 Jul 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantRadhakrishna
Designationmanagingdirector
Name of Company (Applicant Name should not be given here)DINDI CHEMICAL AND PHARMA PARK LTD
AddressMr N Radha Krishna Sireen Drugs Pvt Ltd, G - 21, Madhura NAgar, Hyderabad - 500038 040-23547940 9848944207 sireendindi@gmail.com