APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Bulk Drugs and Intermediate Manufacturing Unit by DSN Labs
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/AP/IND2/91973/2019
Project Cost 1000 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 32 TPM ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0.708 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSy No. 160 & Parts, Nallamattipalem Village , Buchirajupeta Panchayat , Nakkapalli Mandal, Visakhapatnam District, Andhra Pradesh
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.160 & Parts
Town / VillageNallamattipalem Village, Buchirajupeta Panchayat
State of the projectAndhra Pradesh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Andhra PradeshVisakhapatnamNakkapalle
10.
Nearest railway station along with distance in kms Gullipadu Railway Station, 9.5 km
Nearest airport along with distance in kms Visakhapatnam Airport, 65 km
11. Nearest Town/City/District Headquarters along with distance in kms Nakkapalli , 3.4 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Nallamattipalem Village , Buchirajupeta Panchayat , Nakkapalli Mandal, Visakhapatnam District, Andhra Pradesh
13. Name of the Applicant Dasari
14. Registered Address Andhra Pradesh
15.
Address for correspondance:
Name of the Company DSN LABS
Name of the Applicant Dasari
Designation (Owner/ Partner/ CEO) Proprietor
Pin code 531081
E-mail dsnlabs19@gmail.com
Telephone No. 040-23070602
Fax No. 040-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed unit is in an area of 1.7549 Acres (7102 Sq.m). Plant layout is Enclosed.
1.2 Clearance of existing land, vegetation and buildings? No No major tree felling or clearance of buildings is envisaged
1.3 Creation of new land uses? No None
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Applicable
1.5 Construction works? Yes Construction of various blocks Production, Stores, QC,Boiler shed, DG set, Utility, Pollution treatment facility, Roads, solvent storage yard, Green belt and others
1.6 Demolition works? No No demolition work is envisaged
1.7 Temporary sites used for construction works or housing of construction workers? No Majority of the labor will be hired from nearby villages so no housing or shelter facilities required for construction workers. However, existing facilities are sufficient like drinking and sanitation facilities for workers during working hours.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Not Applicable
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes List of products, By-Products and capacities for TOR was Enclosed as in Additional Information
1.14 Facilities for storage of goods or materials? Yes Common facility for storage of raw materials and the finished products will be provided
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste: The Solid & hazardous waste generated in the plant will be disposed of as per rules. The Details of Solid/Hazardous Waste Details are enclosed as Annexure in Additional Information Liquid waste: Industrial effluent of 25.5 KLD is generated and will be treated in ZLD System
1.16 Facilities for long term housing of operational workers? No The workforce is recruited from nearby villages. No long term housing of operational workers
1.17 New road, rail or sea traffic during construction or operation? No Road traffic is likely to increase both during construction and operation stage for transportation of man and material. However, existing transport routes are adequate for the increase in traffic. No additional transport infrastructure is required due to the proposed project
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No, additional transport infrastructure is required due to the present proposal
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Required
1.20 New or diverted transmission lines or pipelines? No Not Required
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Required
1.22 Stream crossings? No None
1.23 Abstraction or transfers of water from ground or surface waters? Yes The total water requirement is 80.18 KLD for the proposed project and Source of Water: Ground water
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No None (There will not be any changes in water bodies or the land surface affecting drainage or runoff)
1.25 Transport of personnel or materials for construction, operation or decommissioning? No The raw materials and products will be transported during construction and operation phase
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes The Estimated employment generation for this proposed project is about 66 Direct employees
1.29 Introduction of alien species? No No New species are introduced
1.30 Loss of native species or genetic diversity? No No Loss of native species or genetic diversity.
1.31 Any other actions? No None envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Total land for the proposed project is 1.7549 Acres (7102 Sq.m)
2.2 Water (expected source & competing users) unit: KLD Yes The total water requirement is 80.18 KLD for the proposed project and Source of Water: Groundwater. The Details are enclosed in Additional Information file
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Construction materials like stone, steel aggregates, sand & cement will be sourced locally
2.5 Forests and timber (source – MT) No No Timber will be used
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Proposed 3 TPH Coal-fired/ Agro waste fired Boiler, Thermopack boiler of 2 Lakh kcal/hr, 380 KVA of D.G. set is proposed 600 KVA of power will be sourced from Andhra Pradesh Southern Power Distribution Company Limited (APSPDCL)
2.7 Any other natural resources (use appropriate standard units) No None
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes The number of chemicals will be used for the production of Synthetic Drugs & Intermediates which have been mentioned in the list of raw materials given in the Additional Information as Annexure
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No such occurrence is envisaged, since effluent generated will be treated properly
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The proposed project will generate direct and indirect employment opportunities during construction as well as operation phase for the local people based on their qualification and work experience.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No None
3.5 Any other causes No None
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Commercial waste like empty cement bags, Iron scrap etc. will be sold to scrap buyers after the construction phase. Domestic waste like used paper, label, cartoons will be disposed to the scrap buyers. Organic waste from canteen will be disposed of as per the local Panchayath / Municipal disposal mechanism.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous wastes Details are Enclosed as Annexure in additional information
4.4 Other industrial process wastes Yes The detailed Solid & Hazardous wastes Enclosed as Annexure in additional information
4.5 Surplus product No None
4.6 Sewage sludge or other sludge from effluent treatment Yes ETP sludge is sent to TSDF
4.7 Construction or demolition wastes No Minimal quantity of debris, scraps, excavated soil used cement bags, iron/steel scrap and cardboards waste could be generated during additional construction
4.8 Redundant machinery or equipment No None
4.9 Contaminated soils or other materials No None
4.10 Agricultural wastes No None
4.11 Other solid wastes No None
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Gaseous emission like SO2, NOx, CO and the particular matter shall be generated from Boilers and DG sets which will be maintained under prescribed limit. DG sets will be used during only power break down. Adequate stack height of Boilers and DG sets provided for effective dispersion of pollutants.
5.2 Emissions from production processes Yes Proper control measures will be adopted to control emission as per prescribed Standard
5.3 Emissions from materials handling including storage or transport Yes Fugitive emissions from material handling, loading /unloading and transport of material will be minimal due to the closed loop system
5.4 Emissions from construction activities including plant and equipment Yes This will be restricted to the construction phase and to the construction site only. It will be minimized by sprinkling water.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust will be generated from loading and unloading of raw material and finished products
5.6 Emissions from incineration of waste No No incinerator is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No waste will be burnt in the open air.
5.8 Emissions from any other sources Yes Dust Emissions from Ball Mill will be mitigated by providing Inbuilt bag filters.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Material transport shall be a source of noise during construction, while transfer pumps, vacuum systems are the sources of noise during operation. The equipment in the plant is designed for noise levels not exceeding 90 dB (A). Proper encasement of noise generating sources is done to control the noise levels below 75 dB (A) at plant boundary. Maintenance of all equipment is carried out regularly to reduce noise. A proper greenbelt is developed which acts as a noise barrier
6.2 From industrial or similar processes Yes Pumps, motors, gearboxes etc will generate a little bit of noise and will be mitigated with regular maintenance. Apart from all these a thick plantation of green belt will be developed along the periphery of the compound wall to arrest the noise nuisance during the operation phase.
6.3 From construction or demolition Yes Temporary noise generation during construction activities
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Noise due to the movement of trucks during construction and operation phase
6.6 From lighting or cooling systems Yes Adequate Lighting shall be provided in the unit and also the local ventilation system shall be provided
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Hazardous materials will be used and stored with due safety and care at the site. All the norms under the Manufacture, Storage and Import Of Hazardous Chemicals (MSIHC) Rules and amendments thereafter will be compiled.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No ETP will be installed and will be designed for zero effluent discharge
7.3 By deposition of pollutants emitted to air into the land or into water No All possible air pollutants will be scrubbed/ filtered properly by various pollution control equipment before emitting into the atmosphere. The norms will be maintained through regular monitoring and analysis of vent gases
7.4 From any other sources No None
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No None
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No No explosions will occur during construction. During production operations, all inbuilt safety precautions will be adopted and there will not be any damage to the environment or human health.
8.2 From any other causes No None
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No As the area is plain, there are no chances of landslides & there is no history of a cloud burst. No natural disasters are envisaged since the site is in an area where such occurrences do not arise.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The proposed project will prove beneficiary for the localities as it provides direct and indirect employment
9.2 Lead to after-use of the site, which could have an impact on the environment No None
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No None envisaged
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Water Bodies: Bay of Bengal – 2.6 Kms (SSE) Waterbody near Project site – 300 meters(ESE) Polavaram left Canal – 6.6 Kms (NNW) Reserved Forests: Rajayyapeta RF – 2.1 Kms (S) RF near Revu Polavaram – 5.0 Kms (E) Donevani Lakshmipuram RF– 4.4 Kms (SSW) Venpadu RF– 7.9 Kms(WSW)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None
4 Inland, coastal, marine or underground waters Yes Bay of Bengal – 2.6 Kms (SSE)
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area Yes Mandal headquarters Nakkapalli is 3.4 Km (N) from the site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes hospitals, schools, places of worship, community facilities are available in Mandal headquarters
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Water Bodies: Bay of Bengal – 2.6 Kms (SSE) Waterbody near Project site – 300 meters(ESE) Polavaram left Canal – 6.6 Kms (NNW) Reserved Forests: Rajayyapeta RF – 2.1 Kms (S) RF near Revu Polavaram – 5.0 Kms (E) Donevani Lakshmipuram RF– 4.4 Kms (SSW) Venpadu RF– 7.9 Kms(WSW)
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The project is located in seismic zone II (Least Active) as per IS: 1893 (Part-1) 2002. Therefore, the possibility of an earthquake is not anticipated. So there will be no effect of natural hazards on the project
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
EDS Reply
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 29 Jan 2019
2.NAPlease provide the following information: (1)Please provide project name (not PPs name nor company name) in S.No. 1 of Form 1. (2)Availability of land with the project proponent and permission for its Industrial use. (3)Plan for Effluent management. 21 Jan 2019
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantDasari
DesignationProprietor
Name of Company (Applicant Name should not be given here)DSN LABS
AddressAndhra Pradesh
Print