APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Setting up of 2 MTPA pellet plant at Rashtriya Ispat Nigam Limited (RINL) formerly known as VSP at Visakhapatnam, Andhra Pradesh. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/AP/IND/99687/2019 | Project Cost | 103280 lacs | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 2 MTPA ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Visakhapatnam | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Kamithi 681(part),682 (part),661(part)
Pedagantyada 228 (part)
Nellimukke 18 (part) | Town / Village | Gajuwaka | State of the project | Andhra Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Andhra Pradesh | Visakhapatnam | Gajuwaka | | 10. | |
Nearest railway station along with distance in kms | Duvvada Railway station, 12.6 km | Nearest airport along with distance in kms | Visakhapatnam Airport, 14 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Visakhapatnam , 20 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Village-Kamithi, Pedagantyada,Nellimukkee | | 13. | Name of the Applicant | Kiran | | 14. | Registered Address | II BLOCK, KORAMANGALA,
BANGALORE 560034 | | 15. | |
Address for correspondance: | Name of the Company | KIOCL LIMITED | Name of the Applicant | Kiran | Designation (Owner/ Partner/ CEO) | GM (Projects) | Pin code | 560034 | E-mail | anushree@meconlimited.co.in | Telephone No. | 80-25531461 | Fax No. | 80- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The proposed project site is located within the existing premises of RINL at Visakhapatnam.Presently, the proposed site is unutilised and is meant for new facilities of RINL. There will be no change in land use, land cover or topography as these facilities would be set up within this earmarked land of RINL. The present land use form of ‘Industrial land’ will remain unaltered. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | The proposed site is partially water logged and is covered by patches of thorny bushes which needs to be cleared for setting up of the proposed pellet plant. The proposed site is devoid of any buildings. | 1.3 | Creation of new land uses? | No | The barren industrial land use pattern will be converted for construction of plant. The site is admeasuring about 925x325 m. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not Applicable | 1.5 | Construction works? | Yes | The construction work with respect to the above facilities will be carried out in the area earmarked for pellet plant. | 1.6 | Demolition works? | No | There will not be any demolition work during the construction of plant | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Unskilled/semi-skilled/skilled workers will be drawn from local areas. Temporary housing for workers, within the project site is not envisaged. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | The proposed pellet plant is above ground building. The terrain requires filling to match with the existing plant level. The expected filling is about 2.5m | 1.9 | Underground works including mining or tunnelling? | No | No mining/tunneling is involved. However, some underground works limited to foundation etc. may be done within the proposed plant premises. | 1.10 | Reclamation works? | No | Not applicable | 1.11 | Dredging? | No | Not applicable | 1.12 | Offshore structures? | No | Not applicable | 1.13 | Production and manufacturing processes? | Yes | Proposed manufacturing process of the pellet is given in Annexure-1 | 1.14 | Facilities for storage of goods or materials? | Yes | During construction period temporary storage facilities will be provided.
During operational phase, permanent raw material and finished pellet storage facilities will be provided. Refer general layout dwg no.
DRG.No.MEC/01/14/1977/DPR/GLT/0016 R1(Fig. 04). | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | No solid and liquid effluent will be generated from the pellet plant.
Recirculation of waste water generated from filter plant is envisaged. | 1.16 | Facilities for long term housing of operational workers? | No | The city is located within 20 km and workers will reside within the city | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing road network will be used | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | Yes | new transmission line is proposed for drawing power from Gangavaram port grid sub-station of APTRANSCO, through double circuit 132 kV Overhead transmission line. The substation is located approximately 2.5 km away from the proposed MRSS considered for the pellet plant. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No groundwater extraction is envisaged. Water requirement shall be met from existing raw water treatment plant at RINL | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | The plant storm water drainage network will be designed in such way that existing drainage pattern will not be altered | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of personnel or materials through existing road & rail facilities during construction and operational stage | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Temporarily during construction phase and a meager influx permanently during operational phase. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | There is no forest land in the proposed project area selected for the plant site. The site is industrial land. As such there is no loss of any native species or genetic diversity. | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The project site is located within RINL -industrial area | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The fresh water requirement for the pellet plant is 2016 KLD (84m3/hr). The water will be drawn from RINL’s existing raw water treatment plant on chargeable basis | 2.3 | Minerals (MT) | Yes | Approximate yearly requirement of Raw Materials/Minerals are given in
Table –1. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The construction materials like bricks, aggregate, cement, sand, steel, etc. would be procured from the licensed vendors. Tentative quantities of materials are given below:
1) Concrete RCC- 32,615 Cum
2) Piles -4781 nos.
3) Building steel structure -10,905T
4) Structural steel 3180 T
5) Sheeting 38,119 Sq.m | 2.5 | Forests and timber (source – MT) | No | Not applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The estimated power requirement for the project is 20 MVA.
(From APTRANSCO)
Furnace oil- 30.928 x 106Litres/ year (From nearest oil storage company)
Coke breeze-28859.63 T/yr (From RINL) | 2.7 | Any other natural resources (use appropriate standard units) | No | Not applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | • Furnace Oil (FO)- 30.928 x 106Litres/ year
• LDO –for flushing of lines
• LPG- for pilot burner | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | There will be employment for local population during and after construction period. The living conditions and welfare of people will improve by social welfare schemes which will be implemented with the project commencement. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Not Applicable | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Not Applicable | 4.4 | Other industrial process wastes | No | Not Applicable | 4.5 | Surplus product | No | Not Applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | About 1 kg of sewage sludge is expected in a day. | 4.7 | Construction or demolition wastes | Yes | Construction wastes will be reused. Demolition wastes not expected. | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | No | Not Applicable | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Stationary-During construction, emissions from asphalt and concrete batching plant are expected. This will be limited to short period.
• Furnace oil will be used in indurating machine.
• During operation, emissions from exhaust stack of indurating machine is expected.
Mobile Sources:
• During construction phase it will be from movement of material transport vehicles & heavy earth moving machineries, equipment, etc. will generate fugitive dust. | 5.2 | Emissions from production processes | Yes | Provision will be made to keep fugitive emission from process under control. Also work zone emission for PM, SOx and NOx, will be limited to 50,800 and 500mg/Nm3 respectively.
1. Stack Emissions:
PM = 2 kg/hr.
NOx =20 kg/hr.
SO2= 364 kg/hr. | 5.3 | Emissions from materials handling including storage or transport | Yes | Fugitive emissions are expected from material handling/storage areas and transportation activities. The emission quantities from material handling/storage included in the fugitive emission values are given in Sl. no 5.2 above. | 5.4 | Emissions from construction activities including plant and equipment | Yes | There will be some emission from construction activities. However, these emissions will last for a short period and it will be temporary & restricted within the plant boundary. The impact will be reversible, marginal and temporary in nature. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | There will be some dust emission from construction and material handling activities. The construction emissions are restricted within the construction site by adopting wind screen and road wetting.
There will not be any odour generation | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | Not applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The noise generation sources from the proposed plant includes grinding mills, pumps blowers/ process fans, compressed air station, etc. The ambient noise level generated will be restricted to 85 dB (A) at 1m from source. | 6.2 | From industrial or similar processes | Yes | The noise level generated will be restricted to 85 dB(A) at 1m from source. | 6.3 | From construction or demolition | Yes | The noise level during construction generated will be restricted to the range of 75 dB (A) | 6.4 | From blasting or piling | Yes | The noise level generated from piling will be in the range of 75 dB (A) | 6.5 | From construction or operational traffic | Yes | The noise level generated will be in the range of 75 dB (A) | 6.6 | From lighting or cooling systems | No | Not Applicable | 6.7 | From any other sources | Yes | Not applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Furnace oil will be used in induration machine. The storage of LDO and FO will be as per Oil Industry Safety Directorate (OISD) norms. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | There will be no process effluent. The sewage generated per day from the plant is about 10 Cum. The treated water will be reused for gardening | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Ambient Air Quality norms and waste water quality discharge limits will be followed. No effluent will be discharged into land or water. | 7.4 | From any other sources | No | Not applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Explosions are not expected from pellet plant. However, possibility of spillage of oil from storage area can cause accidents. Suitable preventive measures / emergency planning will be followed to handle any eventuality | 8.2 | From any other causes | No | Not applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Earthquake: The proposed project falls under Seismic Zone II (as per the seismic zoning map published by Bureau of Indian Standards). This zone is referred to as low damage less risk zone. The seismic zone map is enclosed as Fig. 05.
Flood: The high flood level of the area is +4.0 m.FGL is planned at +4.5 m
Landslides and cloudbursts is not expected.
Cyclone: Visakhapatnam is prone to cyclones and the structures will be designed accordingly. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The area is already developed and all ancillary facilities are available in RINL area | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable | 9.3 | Set a precedent for later developments | No | Not applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | The pellet plant will be set up inside existing premises of RINL which will facilitate downstream iron making process | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | None within 15 km radius from the proposed project site. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | The project site is situated about 4 km from Bay of Bengal. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | NA | 4 | Inland, coastal, marine or underground waters | Yes | The project site is situated about 4 km from Bay of Bengal. | 5 | State, National boundaries | No | None within 15 km radius from the proposed project site. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None within 15 km radius from the proposed project site. | 7 | Defence installations | No | None within 15 km radius from the proposed project site. | 8 | Densely populated or built-up area | Yes | Gajuwaka, 3 km, N | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Gajuwaka Hospitals: Visakha Steel General Hospital & other private Hospitals
Schools: Kendriya Vidyalaya, DAV School, Delhi Public School and other private schools Colleges, Private Junior Colleges, Degree Colleges and Engg. Colleges.
Hindu temples, church, mosque, community welfare centres are located. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Refer Sl.no 8.3 above. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Kiran | Designation | GM (Projects) | Name of Company (Applicant Name should not be given here) | KIOCL LIMITED | Address | II BLOCK, KORAMANGALA,
BANGALORE 560034 |
| |
|