APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | No |
| | Whether proposal involved violation of EIA notification | No | tr > | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Katwa Super Thermal Power Project (2X660 MW) | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/WB/THE/248261/2021 | Project Cost | 7466 cr | |
| 2. | |
S. No. in the schedule | 1(d) Thermal Power Plants
| Project Sector | Thermal Projects | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 1320 MW ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 358 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Srikhanda, Kosigram | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file  | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Srikhanda, Kosigram | Town / Village | Srikhanda, Kosigram | State of the project | West Bengal | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | West Bengal | Barddhaman | Katwa - I | | 10. | |
Nearest railway station along with distance in kms | Katwa, 1 km | Nearest airport along with distance in kms | Kolkata, 160 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Katwa , 1 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Srikhanda
Katwa Subdivision
Burdwan district
713150
Kosigram
Katwa Subdivision
Burdwan district
713150 | | 13. | Name of the Applicant | Vijay | | 14. | Registered Address | NTPC Engineering Office Complex
Sector-24, Noida | | 15. | |
Address for correspondance: | Name of the Company | NTPC Limited | Name of the Applicant | Vijay | Designation (Owner/ Partner/ CEO) | Head of Deptt Env Engg | Pin code | 201301 | E-mail | environment.ntpc@gmail.com | Telephone No. | 120-2410331 | Fax No. | 120-24105060 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | About 884.562 acres of irrigated agricultural land has been identified for construction of main plant, township and ash disposal area, which will be subjected to a permanent change in land use. 556 of the land has already been acquired by WBPDCL/ GoWB, which is being transferred to NTPC. Rest of the land is being acquired by NTPC. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | There are no buildings existing on the land acquired/ proposed to be acquired. However, removal of natural vegetation is envisaged during site development. | 1.3 | Creation of new land uses? | Yes | About 884.562 acres of irrigated agricultural land has been identified for construction of main plant, township and ash disposal area, which will be subjected to a permanent change in land use. 556 of the land has already been acquired by WBPDCL/ GoWB, which is being transferred to NTPC. Rest of the land is being acquired by NTPC. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Topographical survey, Geotechnical survey and EIA Study had already been completed for the project. However, further investigations may be required. | 1.5 | Construction works? | Yes | Construction works include power plant, township and ash disposal area. | 1.6 | Demolition works? | No | No demolition works | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary sites will be used for construction workers at the identified location with necessary infrastructure facilities. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | All construction activities shall involve above ground structures only. Ash dyke shall involve earthwork, cut and fill activities. | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | Yes | Thermal power generation (1,320 MW) process based on supercritical technology. | 1.14 | Facilities for storage of goods or materials? | Yes | Storage of coal, fuel oils, water, chemicals etc. are envisaged. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | A comprehensive Environmental Management Plan shall be formulated covering solid waste management as well as liquid effluent treatment and disposal facilities. The same shall be implemented at site. | 1.16 | Facilities for long term housing of operational workers? | Yes | Various Residential and Non-residential Buildings within the township are envisaged. | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | During construction phase, additional road/rail traffic may be generated for supply of construction materials and plant equipment. During operation phase, coal shall be transported trough railway lines while Fuel Oils shall be transported through rail/ road. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | For transporting the equipment, material and coal to site through rail, a new railway siding shall be constructed. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | Yes | New transmission lines for power evacuation are envisaged. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | Yes | It is proposed to draw water from the Bhagirathi river near the confluence point of Bhagirathi and Ajoy rivers. | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction Material, Labour and Main Plant Equipment shall be transported through roads/ rail route.
Coal shall be transported during operation phase through rail and oil shall be transported through rail/ road.
Chemicals shall be transported through roads.
Personnel during construction and operation phases shall be transported through roads. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | There will be temporary influx of people during construction phase. During operation phase, personnel will be settled down in the township. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | 23 Ha | 2.2 | Water (expected source & competing users) unit: KLD | Yes | 95040 KLD | 2.3 | Minerals (MT) | Yes | Coal 6.46 MTPA | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The project shall have several components like main plantbuilding, coal handling system, fuel oil handling system, watertreatment and use system, cooling towers, chimney, ashhandling system, switch yard, residential buildings &infrastructural facilities. Most of these units are commissionedon a turn key contract system. Therefore, item wise detailedquantities are difficult to estimate at this stage. Theconstruction material shall be sourced locally as far aspracticable. | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | LDO - Intermittent
Construction power will be met from nearby sub-station ofState Govt. | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Fuel Oils, Hydrochloric Acid, Caustic Soda, Liquid Ammonia, Liquid Chlorine, shall be used and stored at site during operation phase. The details of these materials are yet to be worked out. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The project shall provide employment potential under unskilled, semi-skilled and skilled categories as well as potential for self-employment. Further, it will improve the power supply position in West Bengal and States of Eastern Region, which is vital for economic growth as well as improving he quality of life. The improved power supply will reduce the dependence of general public and commercial establishments on DG Sets and water pump for irrigation in rural area. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Small quantities shall be generated, which shall be disposed off in environment friendly manner. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used Lead battery, Spent Oils etc. which shall be recycled asper rules. | 4.4 | Other industrial process wastes | Yes | Ash will be generated due to combustion of coal. The estimated quantity of annual ash production is approx. 2.9MTPA. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Small quantities, which will be used as manures. | 4.7 | Construction or demolition wastes | Yes | Construction waste will be generated. | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Stack Emission shall comprise of particulate matter (PM), SO2, NOx and CO2 due to combustion of coal.
PM 30 mg/Nm3 (Max), SO2, & NOx 100 mg/Nm3 (Max) | 5.2 | Emissions from production processes | Yes | Stack Emission shall comprise of particulate matter (PM), SO2, NOx and CO2 due to combustion of coal.
PM 30 mg/Nm3 (Max), SO2, & NOx 100 mg/Nm3 (Max) | 5.3 | Emissions from materials handling including storage or transport | Yes | Fugitive emissions may be generated which shall be controlled using dust extraction/ suppression systems. | 5.4 | Emissions from construction activities including plant and equipment | Yes | This will be restricted to the construction phase and the construction site only. Adequate steps would be taken to control emission. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is anticipated during loading and unloading of construction material and excavation of upper earth surface. These will however be temporary in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The noise level of the order of 85 dB (A) at 1 meter will be generated during operation of power plant. | 6.2 | From industrial or similar processes | Yes | There will be generation of noise and vibration from power plant operations. Source will be firmed on steel base and enclosed with acoustic enclosures to reduce noise and vibration. Green belt of adequate width will further reduce noise and vibration of the polluting source. | 6.3 | From construction or demolition | Yes | Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:
Concreting, mixing & operation of DG sets.
Construction plant and heavy vehicle movement. Operation of construction equipment would be controlled by proper servicing of equipment. | 6.4 | From blasting or piling | Yes | During piling, noise level of the order of 85 dB(A) will be generated during construction phase | 6.5 | From construction or operational traffic | Yes | Due to vehicular movement there will be slight increase in the ambient noise level. | 6.6 | From lighting or cooling systems | Yes | Insignificant noise impact will result from lighting or cooling systems. | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Hydrochloric Acid, Caustic Soda, Liquid Ammonia and Liquid Chlorine are envisaged to be used. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | There will be no discharge of untreated sewage on land or into water bodies. Adequate treatment of sewage will be carried out. Treated sewage will be re-used for flushing, landscaping and cooling purposes, recreational uses. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Adequate measures shall be taken for the control of fire and explosion hazards. Further, On-site and Off-site Disaster Management Plans shall be prepared and implemented at site. | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Adequate care will be taken during design and construction to resist natural disaster like earthquakes etc. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Project will benefit and strengthen the power supply in West Bengal and other states of Eastern Region. In addition, construction of project will promote establishment/ expansion of ancillary and small scale industries and service sector in the area as well as overall industrialization of the State. This will lead to improvement of livelihood of the people. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | 9.3 | Set a precedent for later developments | Yes | The project would initiate various types of commercial activities in the area. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | 4 | Inland, coastal, marine or underground waters | Yes | Bhagirathi River – 6 Km
Ajoy River – 5 Km | 5 | State, National boundaries | No | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | State Highway between Bardhaman and Katwa | 7 | Defence installations | No | | 8 | Densely populated or built-up area | No | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | These facilities are located within 15 km | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Vijay | Designation | Head of Deptt Env Engg | Name of Company (Applicant Name should not be given here) | NTPC Limited | Address | NTPC Engineering Office Complex
Sector-24, Noida |
| |
|