| APPENDIX I | | (See Paragraph-6) | | FORM 1 | | | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 1. | |
| Name of the Project/s | JSW ENERGY (BARMER) LIMITED-1080 MW Expansion | Brief summary of project | Annexure-Brief summary of project | | Proposal Number | IA/RJ/THE/110058/2019 | | Project Cost | 594000 lacs | |
| | 2. | |
| S. No. in the schedule | 1(d) Thermal Power Plants
| Project Sector | Thermal Projects | |
| | 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 1080 ha. | | | 4. | | New/Expansion/Modernization | Expansion | | Proposal Number | IA/RJ/THE/11834/2006 | | MoEFCC file number(Previous EC) | No:J- 13011/58/2006-IA.II(T) | | Uploaded EC letter | Annexure-Uploaded EC letter | | | | 5. | Existing Capacity/Area etc. | 1080 ha. | | | 6. | Category of project i.e. 'A' or 'B' | A | | | 7. | | Does it attract the general condition? If yes, please specify | No | | | | 8. | | Does it attract the specific condition? If yes, please specify | No | | | | 9. | |
| Location of the project | VILLAGE-BHADRESH, DISTRICT-BARMER | | Shape of the project land | Block (Polygon) | | Uploaded GPS file | Annexure-GPS file  | | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | | Plot/Survey/Khasra No. | 100, 101, 102, 103, 113, 114, 115, 119, 120, 121 | | Town / Village | VILLAGE-BHADRESH | | State of the project | Rajasthan | |
| | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Rajasthan | Barmer | baytu | | | 10. | |
| Nearest railway station along with distance in kms | BARMER, 30 km | Nearest airport along with distance in kms | JODHPUR, 200 km | |
| | 11. | Nearest Town/City/District Headquarters along with distance in kms | BARMER , 30 km | | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | VILLAGE & POST-BHADRESH, DISTRICT-BARMER, PIN 344011, RAJASTHAN,
TEL-2982229100 | | | 13. | Name of the Applicant | VEERESH | | | 14. | Registered Address | VIILAGE & PO - BHADRESH | | | 15. | |
| Address for correspondance: | | Name of the Company | JSW ENERGY BARMER LIMITED | | Name of the Applicant | VEERESH | | Designation (Owner/ Partner/ CEO) | HOP | | Pin code | 344011 | | E-mail | veeresh.devaramani@jsw.in | | Telephone No. | 2982-229100 | | Fax No. | 2982-229222 | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| | 16. | | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| | 17. | Whether part of Interlinked projects? | No | | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | | 19. | | If Yes, MoEF file number | N/A | | Date of submission | N/A | | | | | | 21. | | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | | 22. | | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| | 23. | | Whether any Forest Land Involved? | No | | Area of Forest land Involved (hectares) | N/A | |
| | 24. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | | (a) Name of the Court | N/A | | (b) Name of the Sub court | N/A | | (c) Case No. | N/A | | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | TOTAL OF ABOUT 1186 ACRES OF LAND IS AVAILABLE BEYOND THE FRINGE OF THE MINE BOUNDARY IDENTIFIED FOR THE POWER PLANT. AFTER COMPLETION OF 1080 MW PROJECT AND ITS REQUIRED GREEN BELT, 223 ACRES OF LAND IS AVAILABLE IN PRESENT PROPOSED SITE. THIS AVAILABLE LAND WILL BE ADEQUATE FOR THE PROPOSED 1080 MW WITH ITS REQUIRED GREEN BELT. | | 1.2 | Clearance of existing land, vegetation and buildings? | No | NOT APPLICABLE | | 1.3 | Creation of new land uses? | No | NOT APPLICABLE | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | TESTING CARRIED AND REPORT AVAILABLE | | 1.5 | Construction works? | Yes | THERMAL POWER PLANT AND OTHER RELATED INFRASTRUCTURE FACILITIES WHICH INCLUDES RCC STRUCTURES, ROAD CONSTRUCTION, ERECTION OF HEAVY STEEL STRUCTURES ETC. | | 1.6 | Demolition works? | No | THERE IS NO NEED FOR ANY DEMOLITION OR RELOCATION AS THERE NO BUILDINGS OR OTHER STRUCTURES AT THE EXPANSION SITE. THIS EXPANSION IS PROPOSED IN PRESENT INDUSTRIAL SITE. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | THE WORKERS WILL USE THE TEMPORARY HOUSING FACILITIES DURING THE CONSTRUCTION PHASE OF THE 660 MW PROJECT | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | EXCAVATION, FOUNDATION AND CONSTRUCTION WILL BE CARRIED OUT FOR THERMAL POWER PLANT AND ASSOCIATED FACILITIES. | | 1.9 | Underground works including mining or tunnelling? | No | NOT APPLICABLE | | 1.10 | Reclamation works? | No | NOT APPLICABLE | | 1.11 | Dredging? | No | NOT APPLICABLE | | 1.12 | Offshore structures? | No | NOT APPLICABLE | | 1.13 | Production and manufacturing processes? | Yes | ELECTRICITY GENERATED IS 8041680 MWh UNITS PER ANNUM | | 1.14 | Facilities for storage of goods or materials? | Yes | WAREHOUSE WILL BE CONSTRUCTED FOR STORAGE OF GOODS AND MATERIALS | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | FLY ASH WILL BE COLLECTED IN DRY FORM AND STORED IN DEDICATED SILOS FOR UTILIZATION BY CEMENT INDUSTRIES. THE BOTTOM ASH WILL ALSO COLLECTED IN DRY FORM AND BE STORED IN SEPARATE SILOS FOR UTILIZATION IN CEMENT MANUFACTURING AND LOCAL BRICK MAKING INDUSTRY TO THE EXTENT POSSIBLE. IN ADDITION, AN ASH POND WITH ADEQUATE CAPACITY AND WITH ALL NECESSARY PROTECTION MEASURES WILL BE CONSTRUCTED, WHICH WOULD RECEIVE ASH IN HIGH CONCENTRATION SLURRY DISPOSAL (HCSD) TECHNOLOGY. PROCESS EFFLUENT WILL BE | | 1.16 | Facilities for long term housing of operational workers? | Yes | WORKERS WILL BE ACCOMMODATED WITHIN THE EXISTING PROJECT FACILITY (UNDER DEVELOPMENT). | | 1.17 | New road, rail or sea traffic during construction or operation? | No | NOT APPLICABLE | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | NOT APPLICABLE | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | NOT APPLICABLE | | 1.20 | New or diverted transmission lines or pipelines? | Yes | THE POWER GENERATED IN THE POWER PLANT WILL BE EVACUATED INTO 220 KV / 400 KV RVPNL NETWORK, THROUGH 220 KV / 400 KV LINES BETWEEN PLANT SWITCHYARD AND 220 KV/400KV BARMER/ 400 KV JODHPUR SUB-STATION. THE REQUIRED STUDIES SHALL BE CONDUCTED BY RVPNL FOR AUGMENTATION / UP GRADATION OF 220 KV / 400 KV GRID FOR POWER EVACUATION. | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | NOT APPLICABLE | | 1.22 | Stream crossings? | No | NO STREAM CROSSINGS AT THE PROPOSED SITE. | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | NO WATER WILL BE ABSTRACTED FROM THE GROUND. COOLING WATER AND OTHER WATER DEMAND DURING CONSTRUCTION AND OPERATION PHASE WILL BE DRAWN FROM INDIRA GANDHI NAHAR PARIYOJANA (IGNP) CANAL THROUGH INTAKE PUMPS AND INTERMEDIATE PUMPS | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | THE RAIN WATER RUN-OFF WILL BE ROUTED THROUGH PROPERLY CONSTRUCTED STORM WATER DRAINS. PROJECT SITE IN DEEP OF THE DESERT AND SCANTY RAINFALL REGION. THERE ARE NO NEARBY WATER BODIES. | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | EXISTING TRANSPORT SYSTEM WILL BE UTILIZED FOR TRANSPORT OF PERSONNEL OR MATERIALS FOR CONSTRUCTION AND OPERATION. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | NOT APPLICABLE | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | NOT APPLICABLE | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | INFLUX OF ABOUT 1100 PEOPLE DUE TO DIRECT AND INDIRECT EMPLOYMENT, BOTH DURING THE CONSTRUCTION (1000) AND OPERATIONAL PHASES (100) OF THE PROPOSED PROJECT | | 1.29 | Introduction of alien species? | No | NOT APPLICABLE | | 1.30 | Loss of native species or genetic diversity? | No | NONE | | 1.31 | Any other actions? | No | IN THE PROPOSED EXPANSION OF POWER PLANT, FOR RAISING PLANTATION ADEQUATE SAPLINGS WILL BE PLANTED COVERING 33% OF THE TOTAL AREA 1186 ACRES INCLUDING AREA OF THE EXISTING AND THE EXPANSION PROJECTS. | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | THE PROPOSED EXPANSION PROJECT IS BEING DEVELOPED ON THE LAND AVAILABLE WITHIN THE EXISTING PROJECT SITE. THE SITE CONSISTS OF BARREN LAND WHICH HAS BEEN PERMITTED BY THE GOVERNMENT OF RAJASTHAN FOR SETTING UP A LIGNITE/ COAL BASED POWER PLANT. | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | RAW WATER WILL BE PUMPED FROM INDIRA GANDHI NAHAR PARIYOJANA (IGNP) CANAL TO THE POWER PLANT USING EXISTING FACILITY. ADDITIONAL WATER FOR THIS EXPANSION PROJECT WILL BE FULFILLED WITH THE EXISTING ALLOTMENT OF WATER 1,95,840 M3/D (80CUSECS) FROM IGNP. IGNP HAS ALLOTTED 80 CUSECS OF WATER FOR THE USE OF POWER GENERATION AFTER FULFILLING THE NEEDS OF COMPETING USERS. | | 2.3 | Minerals (MT) | No | NOT REQUIRES | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | ALL CONSTRUCTION MATERIAL WILL BE SOURCED FROM NEARBY LOCAL AUTHORITY PERMITTED LOCATIONS. QUANTITY – 8.1 MILLION TONS | | 2.5 | Forests and timber (source – MT) | No | NOT REQUIRE | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | ALL CONSTRUCTION MATERIAL WILL BE SOURCED FROM NEARBY LOCAL AUTHORITY PERMITTED LOCATIONS. | | 2.7 | Any other natural resources (use appropriate standard units) | Yes | LIGNITE REQUIREMENT OF ABOUT 7.0 (21728 T/DAY) MTPA WILL BE MET BY STATE PSU. | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | THE WATER TREATMENT CHEMICALS WILL BE USED IN SPARSE QUANTITIES, WHICH CANNOT BE QUANTIFIED, AT PRESENT. THE SPENT OILS AND LUBRICANTS/WASTE OILS LIKELY TO BE GENERATED FROM PLANT AREA, OILY SLUDGE/RECOVERED OILY MATERIAL THROUGH OIL SEPARATOR SPENT CATALYST/RESINS AND THE BIOMEDICAL WASTE FROM HOSPITAL/HEALTH CENTRES WILL BE DISPOSED AS PER THE HAZARDOUS WASTES (HANDLING AND MANAGEMENT) RULES, 2003. . THE HOSPITAL WASTES WILL BE TREATED AND DISPOSED OF AS PER BIOMEDICAL WASTE (HANDLING AND MAN | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | NOT APPLICABLE | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | THE DIRECT AND INDIRECT EMPLOYMENT POTENTIAL OF LOCAL PEOPLE IS EXPECTED TO BE INCREASED WITH ENHANCED ALL ROUND QUALITY OF LIFE. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | NOT APPLICABLE | | 3.5 | Any other causes | No | NOT APPLICABLE | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | NOT APPLICABLE | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | DOMESTIC MUNICIPAL SOLID WASTE WILL BE GENERATED | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | THERE WILL BE NO MAJOR SOURCE HAZARDOUS WASTE EXCEPT USED OIL. | | 4.4 | Other industrial process wastes | No | NO PROCESS WASTE IS EXPECTED | | 4.5 | Surplus product | No | NOT APPLICABLE | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | SEWAGE SLUDGE WILL BE GENERATED FROM THE CLARIFIER AND OILY SLUDGE FORM THE OIL SEPARATOR WILL BE MANAGED AS PER THE PREVAILING REGULATORY NORMS. | | 4.7 | Construction or demolition wastes | Yes | DURING CONSTRUCTION PHASE, SOME CONSTRUCTION WASTE WILL BE GENERATED. | | 4.8 | Redundant machinery or equipment | No | NOT APPLICABLE | | 4.9 | Contaminated soils or other materials | No | ALL PRECAUTIONS WILL BE TAKEN TO MINIMISE SOIL CONTAMINATION | | 4.10 | Agricultural wastes | No | NOT APPLICABLE | | 4.11 | Other solid wastes | Yes | ABOUT 132200 TONS OF ASH PER MONTH WILL BE GENERATED | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | FLUE GAS EMISSIONS WILL BE GENERATED FROM COMBUSTION OF LIGNITE IN BOILERS FOR 1080 MW CAPACITY SO2: 456 KG/HR BASED ON 1.2% SULPHUR IN FUEL NOX: 456 KG/HR SPM: 137 KG/HR | | 5.2 | Emissions from production processes | No | NO PROCESS EMISSIONS WILL BE GENERATED | | 5.3 | Emissions from materials handling including storage or transport | Yes | ADEQUATE AIR POLLUTION CONTROL MEASURES WILL BE TAKEN DURING STORAGE AND CONVEYANCE OF COAL AND ASH | | 5.4 | Emissions from construction activities including plant and equipment | Yes | DUE TO CONSTRUCTION ACTIVITIES, THERE WILL BE FUGITIVE EMISSIONS.
HOWEVER, SUITABLE CONTROL MEASURES WOULD BE IMPLEMENTED. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | ADEQUATE CONTROL MEASURES WILL BE TAKEN FOR HANDLING OF CONSTRUCTION MATERIALS, SEWAGE AND OTHER WASTES. | | 5.6 | Emissions from incineration of waste | No | NOT APPLICABLE | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | NOT APPLICABLE | | 5.8 | Emissions from any other sources | No | NOT APPLICABLE | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | IT WILL BE ENSURED THAT MANUFACTURERS / SUPPLIERS OF MAJOR NOISE GENERATING MACHINES /EQUIPMENT USED DURING CONSTRUCTION AND OPERATION PHASE OF PROJECT ARE STATE-OF-THE-ART AND COMPLY WITH STATUTORY REQUIREMENTS. | | 6.2 | From industrial or similar processes | Yes | NOISE WILL BE GENERATED DUE TO OPERATION OF TURBINES, COMPRESSORS, PUMPS AND GENERATORS. HOWEVER, ALL PRECAUTIONARY MEASURES WILL BE TAKEN TO REDUCE THE IMPACTS THEREOF. | | 6.3 | From construction or demolition | Yes | DURING CONSTRUCTION PHASE ONLY | | 6.4 | From blasting or piling | No | NOT APPLICABLE | | 6.5 | From construction or operational traffic | Yes | NOISE WILL BE GENERATED DUE TO OPERATION OF VEHICLES. WELL MAINTAINED DIESEL POWERED VEHICLES WILL BE DEPLOYED. EMPHASIS WOULD BE LAID ON DEPLOYMENT OF VEHICLES WITH POLLUTION UNDER CONTROL (PUC) CERTIFICATES EVEN FOR THOSE OF CONTRACTORS AND TRANSPORTERS. | | 6.6 | From lighting or cooling systems | Yes | PROPER CONTROL MEASURES WILL BE IMPLEMENTED TO REDUCE THERMAL RADIATION FROM STEAM PIPELINES AND HEAT DISSIPATION FROM COOLING TOWERS. | | 6.7 | From any other sources | No | NOT APPLICABLE | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | ALL PRECAUTIONS WOULD BE TAKEN TO STORE AND HANDLE ANY HAZARDOUS WASTES TO ELIMINATE CONTAMINATION OF SOIL OR WATERS. | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | PROCESS EFFLUENT WILL BE SUITABLY TREATED AND BE USED FOR INHOUSE PROCESS ACTIVITY SEWAGE FROM VARIOUS BUILDINGS IN THE POWER PLANT AREA WILL BE DISCHARGED THROUGH SEPARATE DRAINS TO SEPTIC TANKS FOLLOWED BY SOAK PITS. THE TREATED DOMESTIC EFFLUENT WILL BE UTILIZED FOR PLANTATION. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | THE AIR POLLUTION WILL BE CONTROLLED BY PROVISION OF TALL STACKS, AND EFFICIENT DUST COLLECTIONS SYSTEMS SUCH AS, ELECTROSTATIC PRECIPITATORS, BAG FILTERS, DUST SUPPRESSION SYSTEMS, COVERED CONVEYORS ETC. | | 7.4 | From any other sources | No | NOT APPLICABLE | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | DUE TO LOCATIONAL ADVANTAGE, DISPERSION CAPABILITIES OF THE ATMOSPHERE BEING VERY GOOD, THE RISK OF BUILD-UP OF POLLUTANTS IS NOT ENVISAGED. | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | SINCE ALL PRECAUTIONARY MEASURES WOULD BE TAKEN, NO MAJOR RISK OF ACCIDENTS IS ANTICIPATED. | | 8.2 | From any other causes | No | SINCE ALL PRECAUTIONARY MEASURES WOULD BE TAKEN, NO MAJOR RISK OF ACCIDENTS IS ANTICIPATED ON ACCOUNT OF HANDLING OF CHEMICALS, COMPRESSED AIR, ELECTRICITY ETC. | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | THE PROJECT MAY BE AFFECTED BY NATURAL DISASTERS LIKE EARTHQUAKES SINCE THE AREA IS LOCATED WITHIN SEISMIC ZONE-III, BUT THE CHANCES OF ENVIRONMENTAL DAMAGES DUE TO THAT WILL BE VERY LESS. THIS SEISMIC FORCE WILL BE CONSIDERED DURING DESIGN OF BUILDING STRUCTURES AND BUILDING/EQUIPMENT FOUNDATION AS PER THE RELEVANT CODES. | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | THERE WILL BE PLANNED SUPPORT ACTIVITIES DUE TO THIS PROJECT. ANCILLARY INDUSTRIES MAY ALSO COME UP IN FUTURE. THESE SUPPORT FACILITIES ARE EXPECTED TO CONTRIBUTE TOWARDS IMPROVEMENT OF QUALITY OF LIFE OF LOCAL PEOPLE. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | NOT APPLICABLE | | 9.3 | Set a precedent for later developments | Yes | OVERALL DEVELOPMENT OF THIS HINTERLAND IS EXPECTED, BENEFITING THE COMMON MAN. | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | THE CONSENTED 8 X135 MW POWER PROJECT ALONG WITH THE EXPANSION OF 1080 MW WILL NOT EXCEED THE STIPULATED ENVIRONMENTAL STANDARDS. THIS WILL BE ACHIEVED THROUGH PROPER MITIGATION MEASURES WILL BE TAKEN DURING CONSTRUCTION AND OPERATION PHASES OF THE PROPOSED EXPANSION PROJECT. | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | THERE IS NO AREAS PROTECTED UNDER INTERNATIONAL CONVENTIONS, NATIONAL OR LOCAL LEGISLATION FOR THEIR ECOLOGICAL, LANDSCAPE, CULTURAL OR OTHER RELATED VALUE - IN ARIAL DISTANCE OF 15 KM | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | THE STUDY AREA COMPRISES OF BARREN UNCULTIVATED LAND. | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | NOT APPLICABLE | | 4 | Inland, coastal, marine or underground waters | No | THERE IS NO PROPOSAL OF EXTRACTING AND USE OF GROUNDWATER FOR THE PROPOSED PROJECT. HOWEVER POSSIBILITY OF UTILISING WASTE GROUND WATER BEING DISPOSED BY THE ADJACENT MINES WILL BE EXPLORED. HENCE THE STRESS ON GROUND WATER IN PROJECT AREA WILL BE NEGLIGIBLE DUE TO PROPOSED PROJECT | | 5 | State, National boundaries | No | NOT APPLICABLE | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | NOT APPLICABLE | | 7 | Defence installations | Yes | DEFENCE INSTALLATIONS ARE EXISTING IN BARMER AREA, WHICH IS ABOUT 18 KM SE FROM THE PROPOSED SITE. NOC FOR ESTABLISHING THE POWER PLANT HAS ALSO BEEN OBTAINED FROM THE CONCERNED DEPARTMENT PRIOR TO THE ENVIRONMENTAL CLEARANCE OF 8X135 MW CAPACITY POWER PLANT. | | 8 | Densely populated or built-up area | No | NOT APPLICABLE | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | NOT APPLICABLE | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | NOT APPLICABLE | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | NOT APPLICABLE | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | THE PROJECT MAY BE AFFECTED BY NATURAL DISASTERS LIKE EARTHQUAKES SINCE THE AREA IS LOCATED WITHIN SEISMIC ZONE-III, BUT THE CHANCES OF ENVIRONMENTAL DAMAGE DUE TO THAT WILL BE VERY LESS. THIS SEISMIC FORCE WILL BE CONSIDERED DURING DESIGN OF BUILDING STRUCTURES AND BUILDING/EQUIPMENT FOUNDATION AS PER THE RELEVANT CODES. | | | (IV) | Proposed Terms of Reference for EIA studies | | | | Additional Attachments, if any |
|---|
| Attached File |
|---|
| ADS Letter |
| | | | Essential Detail Sought: |
|---|
| Sno. | EDS Letter | Remarks | Date of EDS |
|---|
| 1. | NA | The correction have been made as per the instruction received | 10 Jul 2019 | | 2. | NA | PFR and Brief Summary have not been uploaded. Pls upload these documents. | 10 Jul 2019 | | | Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | NA | 19 Aug 2019 | | 2. | NA | Committee after
deliberations, deferred the proposal and
sought for the following information for further consideration:
|
Print
|
|
|
|