APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Setting up of a greenfield Integrated Steel Plant of capacity 13.2 MTPA crude steel with 10 MTPA cement and 900 MW captive power plant near Paradeep, Jagatsinghpur district, Odisha
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/OR/IND/70478/2017
Project Cost 5500000 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 13.2 MTPA Crude Steel, 10 MTPA cement and 900 MW Captive power ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectJagatsinghpur district, Near Paradeep, Odisha
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Please see Annexure 1 of Additional attachments file
Town / VillagePolanga,Noliasahi,Govindpur,Dhinkia,Nuagaon,Bhuinyapal
State of the projectOrissa
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)OrissaJagatsinghapurKujang
10.
Nearest railway station along with distance in kms Paradeep, 11 km
Nearest airport along with distance in kms Bhubaneshwar, 140 km
11. Nearest Town/City/District Headquarters along with distance in kms Paradeep town , 4 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gadkujang, Nuagaon & Dhinkia Panchayat, Block Ersama, P.S. Abhaychandpur, Tehsil Ersama, Dist. Jagatsinghpur, Odisha - 754001
13. Name of the Applicant Shankarpratap
14. Registered Address IDCO Towers, 6th Floor, Janpath, Bhubaneshwar
15.
Address for correspondance:
Name of the Company JSW STEEL LIMITED ODISHA PROJECT
Name of the Applicant Shankarpratap
Designation (Owner/ Partner/ CEO) SrVP
Pin code 751022
E-mail shankarpratap.singh@jsw.in
Telephone No. 0674-2596115
Fax No. 0674-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? Yes
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?Yes
StatusApplication for Forest Clearance yet to be submitted
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?Yes
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?Yes
Area of Forest land Involved (hectares)About 1260 ha.
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes There will be change in land use of single crop agricultural land and forest land to industrial land
1.2 Clearance of existing land, vegetation and buildings? Yes The project area has sporadic vegetation which will be cleared
1.3 Creation of new land uses? Yes Single crop agricultural land and forest land will be converted to industrial land
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing will be required for construction purpose
1.5 Construction works? Yes Construction work will be confined within the acquired plant boundary
1.6 Demolition works? No -
1.7 Temporary sites used for construction works or housing of construction workers? Yes Temporary construction shed and hutments will be created
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Land will be raised 1m above the recorded highest storm surge level
1.9 Underground works including mining or tunnelling? No -
1.10 Reclamation works? Yes Land will be raised 1m above the recorded highest storm surge level
1.11 Dredging? Yes Approximately 40,000,000 cubic meter
1.12 Offshore structures? No -
1.13 Production and manufacturing processes? Yes Please see Annexure 2 of additional attachments file
1.14 Facilities for storage of goods or materials? Yes Please see Annexure 3 of additional attachments file
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Please see Annexure 4 of additional attachments file
1.16 Facilities for long term housing of operational workers? Yes New township with all amenities will be built in the nearby locality
1.17 New road, rail or sea traffic during construction or operation? Yes New access road from NH, rail connectivity from nearest rail head and captive port will be developed
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes New access road from NH, rail connectivity from nearest rail head and captive port will be developed
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No -
1.20 New or diverted transmission lines or pipelines? Yes New slurry and water pipeline will be laid
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No -
1.22 Stream crossings? No -
1.23 Abstraction or transfers of water from ground or surface waters? No Make up water will be extracted from Jobra barrage near Cuttack
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No -
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes By rail, road, sea and pipeline
1.26 Long-term dismantling or decommissioning or restoration works? No -
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No -
1.28 Influx of people to an area in either temporarily or permanently? Yes Technical personnel will be engaged during construction and operation period
1.29 Introduction of alien species? No -
1.30 Loss of native species or genetic diversity? No -
1.31 Any other actions? No -
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Single crop agricultural land of around 380 acres
2.2 Water (expected source & competing users) unit: KLD Yes Estimated makeup water requirement is around 259200 KLD which would be drawn from Jobra barrage near Cuttack
2.3 Minerals (MT) Yes Please see Annexure 5 of additional attachments file
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Civil work - 1500000 cum Structural work - 600000 ton
2.5 Forests and timber (source – MT) No -
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Annual energy requirement would be around 11093 million kWh
2.7 Any other natural resources (use appropriate standard units) No -
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Acids and alkali required for waste water treatment
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No -
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Upliftment of socio economic condition of the local people due to industrial growth and various CSR activities.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No -
3.5 Any other causes No -
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No -
4.2 Municipal waste (domestic and or commercial wastes) Yes The organic solid waste will be collected in the collecting bins for final disposal as per applicable norms. MSW generated shall be about 600 T per month.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes As stated under Item No. 1.15 (Annexure-4 attached in Additional Attachments File)
4.4 Other industrial process wastes No As stated under Item No. 1.15 (Annexure-4 attached in Additional Attachments File)
4.5 Surplus product Yes Pellet (15.1 MTPA) & DRI (300,000 TPA)
4.6 Sewage sludge or other sludge from effluent treatment Yes As stated under Item No. 1.15 (Annexure-4 attached in Additional Attachments File)
4.7 Construction or demolition wastes Yes Construction debris will be used in filling the low lying areas within the plant.
4.8 Redundant machinery or equipment No -
4.9 Contaminated soils or other materials No -
4.10 Agricultural wastes No -
4.11 Other solid wastes No -
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Included in item 5.2
5.2 Emissions from production processes Yes Estimated emission load due to the proposed expansion with control measure: TSP : 1000-1100 kg/hr SO2 : 1250-1350 kg/hr NOx : 1700-1800 kg/hr
5.3 Emissions from materials handling including storage or transport Yes Included in item 5.2
5.4 Emissions from construction activities including plant and equipment Yes Fugitive dusts only for intermittent period.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Fugitive dusts only for intermittent period.
5.6 Emissions from incineration of waste No -
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No -
5.8 Emissions from any other sources No -
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise level will be restricted to 85 dB(A) at 3 m distance from the noise generating sources.
6.2 From industrial or similar processes Yes Noise level will be restricted to 85 dB(A) at 3 m distance from the noise generating sources.
6.3 From construction or demolition Yes Intermittent and temporary noise during construction
6.4 From blasting or piling Yes Piling within the construction zone
6.5 From construction or operational traffic Yes Intermittent
6.6 From lighting or cooling systems No -
6.7 From any other sources No -
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Acid and alkali as required for the process and water treatment will be stored in a tank in a separate area with proper dykes around the storage area.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No All the treated waste water will be reused within the plant i.e. the plant will be designed based on near zero discharge concept.
7.3 By deposition of pollutants emitted to air into the land or into water No Stringent emission norms would be adopted for all the pollution control equipment to meet the regulatory standards, as applicable
7.4 From any other sources No -
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Due to adoption of adequate pollution control systems, risk has not been envisaged.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Due to storage and handling of by-product fuel gases, acids and alkalis.
8.2 From any other causes Yes Fire/electrical short circuit, gas leak may occur during accidental release
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Cyclone, which is being taken care of through Risk assessment and disaster management planning.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes - The proposed steel plant will serve as the parent industrial unit serving various ancillary industries, which may come up in the region - Infrastructure in respect of road, street lighting etc - Township - Not applicable - Material Supply industry - Miscellaneous Service Providers
9.2 Lead to after-use of the site, which could have an impact on the environment No -
9.3 Set a precedent for later developments Yes Various ancillary units may come up in the region
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No -
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No such notified area within 15 km aerial coverage of the project site
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Bay of Bengal Mahanadi River Bargud PF Athgarh PF
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not within 15 km aerial coverage of the project site.
4 Inland, coastal, marine or underground waters Yes As stated in Sl No. 2 above
5 State, National boundaries No Not within 15 km aerial coverage of the project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No -
7 Defence installations No Not within 15 km aerial coverage of the project site.
8 Densely populated or built-up area Yes Paradeep town
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Available hospitals, schools, colleges and temples beyond 1 km and within 15 km are as follows: Hospitals – 7 High School – approx 25 Primary School – approx 10 Colleges – 1 Temples – 4
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not within 15 km aerial coverage of the project site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not within 15 km aerial coverage of the project site.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Adverse climatic conditions i.e. cyclone
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantShankarpratap
DesignationSrVP
Name of Company (Applicant Name should not be given here)JSW STEEL LIMITED ODISHA PROJECT
AddressIDCO Towers, 6th Floor, Janpath, Bhubaneshwar
Print