APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | 4000 MW Deoghar Ultra Mega Power Project | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/JH/THE/98383/2019 | Project Cost | 3500000 lacs | |
| 2. | |
S. No. in the schedule | 1(d) Thermal Power Plants
| Project Sector | Thermal Projects | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 4000 MW ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 900 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Pipra village, Mohanpur Anchal, Deoghar District, Jharkhand | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file  | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 437, 443, 461, 567, 568 etc. | Town / Village | Pipra, Salaiya , Tilaiya, Ambatari, Bansmatiya, Tilauna, Mohiyama, Barakola, Baljora, Jamua and Barachhatimi | State of the project | Jharkhand | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Deoghar | Mohanpur | | 10. | |
Nearest railway station along with distance in kms | Deoghar, 16 km | Nearest airport along with distance in kms | Durgapur, 150 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Deoghar , 16 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Village Rikhiya, Post Office Mohanpur, District Deoghar, Jharkhand | | 13. | Name of the Applicant | Rishab | | 14. | Registered Address | First Floor, Urjanidhi, 1, Barakhamba Lane, Connaught Place, New Delhi | | 15. | |
Address for correspondance: | Name of the Company | DEOGHAR MEGA POWER LIMITED | Name of the Applicant | Rishab | Designation (Owner/ Partner/ CEO) | Manager | Pin code | 110001 | E-mail | jain.rishab@gmail.com | Telephone No. | 011-23443923 | Fax No. | 011-23443990 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | Yes | Uploaded details | Annexure-Uploaded details | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | Yes | Status | Application for Forest Clearance yet to be submitted | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | Yes | Area of Forest land Involved (hectares) | 50 ha. | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The existing land use is barren with some area used as agriculture with rain fed single crop only.
There will be Permanent change in land use after the proposed project as the land will be used for development of UMPP. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Site primarily includes isolated group of houses which will be relocated for the project purpose.
Plant layout will be prepared to ensure minimum disturbance to existing habitations. | 1.3 | Creation of new land uses? | Yes | Industrial & Residential land use for Power Plant & its related facilities. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Planned to carry out necessary Geotechnical Investigations including bore logs, soil test etc. in the proposed site. | 1.5 | Construction works? | Yes | Construction of Power Plant & Its ancillary facilities and residential colony | 1.6 | Demolition works? | Yes | Demolition of some human settlements present in the project area | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary labor camp would be constructed at site for housing of construction works. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction of Power Plant & Its facilities and residential colony on nearly flat land some cutting filling required. | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | Yes | 4000 MW Coal Fired Generation based on
Super –Critical technology. | 1.14 | Facilities for storage of goods or materials? | Yes | Coal, fuel oil and chemicals. Storage facilities will be provided as per applicable practices / standards. Raw water reservoir will be provided for meeting the water requirement. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Fly ash to be stored in silos for marketing to cement industries/ other users. Besides, an ash dyke will be constructed for storage purpose. Power plant effluents will be treated and re-used for coal dust suppression, greenbelt, etc. | 1.16 | Facilities for long term housing of operational workers? | Yes | Township of about 150 acres with civic amenities will be developed. | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Approach road to connect with SH – 22 about 10 km from the project site. Rail link with terminal facilities will be provided for coal transportation from mines to plant. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | Approach road about 10 km length will be constructed to connect the plant site with Banka – Deoghar Road (SH - 22). | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No major change in existing transport routes or diversion of traffic is envisaged. A village road will be suitably diverted | 1.20 | New or diverted transmission lines or pipelines? | Yes | The power is proposed to be evacuated at 765kV/ 400 kV voltage level to nearest CTU sub-station to be located within the available area. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No Impoundment of damming of any stream is involved. Water is proposed to be drawn from Ganga River at a distance of about 120 km from the project site.
Detailed water availability study is being undertaken by IIT Roorkee. | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Estimated total consumptive water requirement for the plant is about 110 Million Cubic Meter (MCM) for 4000 MW, considering re- circulating closed cooling water system with natural draft cooling tower and considering ash water recovery. Drawl of the required quantity of water is proposed from the Ganga River. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There would be no change in any water body or the topography of the land surface which may affect the run off. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction Material, Labour and Main Plant Equipment shall be transported during construction phase. Most of the transportation shall be through existing roads / rail route. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Since industry attracts both skilled and unskilled laborers, influx of population would be there to some extent. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | The existing land is mostly barren with some agriculture land having rain fed single crop agriculture. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The water requirement is proposed to be met from Ganga River. Detailed water availability study is being undertaken by IIT Roorkee.
Approximately 106 Million Cubic Meter (MCM) water will be required for the proposed project considering re- circulating closed cooling water system with natural draft cooling tower and considering ash water recovery. | 2.3 | Minerals (MT) | Yes | Indigenous Coal: approx. 18-20 MTPA at 85% plant load factor | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Cement, Structural steel, Reinforcement Steel, Stone/ aggregate Sand and soil etc.
The above materials are available locally within 100 km. | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | During construction phase, power will be drawn from nearest suitable substation in consultation with State Government.. During operation phase, Indigenous coal shall be used for power generation. The coal requirement for the project would be about 18-20 MTPA.
LDO and HFO | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Fuel oil, Chlorine and Hydrogen storage facilities will be created at power plant site | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Domestic solid waste will be disposed off as per MSW rules. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used oil and grease, discarded batteries, used barrels or containers etc. All the hazardous waste shall be disposed off as per Hazardous Waste (Management, Handling & Trans boundary Movement) Rules 2008 and amendments. | 4.4 | Other industrial process wastes | Yes | Fly ash and bottom ash will be used in Cement industry, Brick Manufacturing, Road construction as per MOEFCC guidelines. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge generated from ETP will be disposed off, as per existing norms. | 4.7 | Construction or demolition wastes | Yes | Construction waste will be disposed off as per guidelines of SPCB. | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Source : Stack
Tentative Emission
SO2 : 3900 kg/h per unit (approx.)
NOx : 1850 kg/h per unit (approx.)
PM : 270 kg/h per unit (approx.) | 5.2 | Emissions from production processes | Yes | Emission of particulate matter, SO2 NOx and some fugitive dust are envisaged from the production process. All necessary measures for emission control like FGD, ESP, bag filters, water spraying etc. will be installed. | 5.3 | Emissions from materials handling including storage or transport | Yes | Dust extraction and suppression system will be provided to control the fugitive emission from coal handling. | 5.4 | Emissions from construction activities including plant and equipment | Yes | There will be emission from construction activities and equipment which will be temporary & restricted within the plant boundary.
Control measures will be provided to mitigate the emission. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Fugitive dusts would be generated during construction and material handling. Odour from sewage will be restricted to the STP area.. Water spraying has been envisaged to eliminate/ minimize the dust. | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The expected noise levels will be in the range of 75-85 dB (A).Noise would be generated generally from steam turbine, generator, compressors, pumps, fans, coal handling plant etc. Acoustic/protective materials will be provided to keep the noise within the values stipulated in CPCB/ MoEF norms. | 6.2 | From industrial or similar processes | Yes | The expected noise levels will be in the range of 75-80 dB (A). Noise would be generated. | 6.3 | From construction or demolition | Yes | Noise levels in the range of 75-80 dB (A) will be generated during construction activities care will be taken to control the noise within the standards. | 6.4 | From blasting or piling | Yes | Some noise would be generated during piling operation at the site. | 6.5 | From construction or operational traffic | Yes | The noise levels of about 65 dB(A) will be generated | 6.6 | From lighting or cooling systems | Yes | Cooling towers (80-85 dB(A). | 6.7 | From any other sources | No | No other sources envisaged | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Accidental release of fuel oil or chemicals. Preventive/ mitigative measures shall be taken as per Disaster Management Plan. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Sewage and plant effluent will be treated adequately to conform the prescribed limits of Central Pollution Control Board (CPCB) and Jharkhand State Pollution Control Board (JSPCB). Treated effluents will be reused to the maximum extent and the balance water will be used for greenbelt development. Discharge, if any, shall meet the prescribed CPCB/JSPCB norms. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | The incremental ground level concentrations are likely to be within the permissible limits. | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Safety measures as per Disaster Management Plan will be in place to ensure safe storage / handling/ use of hazardous materials. | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The proposed power project area is located in Seismic Zone III as per IS 1893 (Part-1) : 2005. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Supporting facilities and ancillary development are likely to take place. A township is envisaged for employees with relevant facilities. These facilities are expected to improve quality of life of people and are not expected to have any adverse impact on the environment. Necessary supporting infrastructure, housing etc. to cater to the requirements of the project will need to be developed. Combination of material and household supply. Education, health care etc. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not envisaged | 9.3 | Set a precedent for later developments | Yes | During project operation phase, following developments are envisaged. • Self–employment opportunities for the local people. • Improvement in transport and communication facilities. • Improvement in education, health care, recreation and hospitality sectors. • Economic upliftment of the people. • Small ancillary industries will develop as a consequence. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | No major industry is located within 10 km radius. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not reported | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | None of the area has been reported as sensitive, Protected forest in the study area. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not reported | 4 | Inland, coastal, marine or underground waters | No | | 5 | State, National boundaries | No | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | No | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Places of worship, hospital, school etc. may exist. Details will be provided in EIA report. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Some Water bodies exists in the area distance and direction w.r.t centre of site are: i).Chandan nadi – 1.9 km, S ii). Chhitmity nadi – 2.5 km, SW iii). Dakwari nadi - 6.1 km, N iv). Dharwa nadi – 7.2 km, SE v). Jhajhajor Nallah – 4.7.0 km, SW.The appropriate schemes, as may be required, would be developed to ensure that above water bodies are not impacted by the construction of power plant. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
| | Essential Detail Sought : NIL | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | Accordingly,
the project is deferred till the information regarding justification, credible
application submitted for forest clearance and details of consultant/s engaged
is submitted. | 11 Apr 2019 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Rishab | Designation | Manager | Name of Company (Applicant Name should not be given here) | DEOGHAR MEGA POWER LIMITED | Address | First Floor, Urjanidhi, 1, Barakhamba Lane, Connaught Place, New Delhi |
|
|