APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Surguja Power Private Limited. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/CG/THE/62318/2017 | Project Cost | 499800 lacs | |
| 2. | |
S. No. in the schedule | 1(d) Thermal Power Plants
| Project Sector | Thermal Projects | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 600 (4x150) MW TPP ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | -1 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Surguja, Chhattisgarh | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file  | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 1/1, 6(P),15,16,23721/8 | Town / Village | Village Panchayat-
Parsa Gram Panchayat
Taluka Udaypur
District Surguja
Chhattisgarh
Zila Parishad-Surguja | State of the project | Chhattisgarh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Chhattisgarh | Surguja | Ambikapur | | 10. | |
Nearest railway station along with distance in kms | Ambikapur, 60 km | Nearest airport along with distance in kms | Raipur, 220 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Ambikapur , 60 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | | | 13. | Name of the Applicant | Santosh | | 14. | Registered Address | Adani House, Nr Mithakhali Circle
Navrangpura, Ahmedabad.
Pin- 380009. | | 15. | |
Address for correspondance: | Name of the Company | Adani Power Ltd. | Name of the Applicant | Santosh | Designation (Owner/ Partner/ CEO) | Head - ESG & Environment | Pin code | 380015 | E-mail | santosh.singh1@adani.com | Telephone No. | 79-25557289 | Fax No. | 79-25557401 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | Yes | Uploaded details | Annexure-Uploaded details | |
| 17. | Whether part of Interlinked projects? | Yes | | 18. | Whether separate application of Interlinked project has been submitted? | Yes | | 19. | If Yes, MoEF file number | J/11015/03/2008-IA II (M) | Date of submission | 21/12/2011 | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | Yes | Status | Final(Stage-II) Approval Obtained | MoEF file number | F.NO. 8-31/2010 FC | Date of In-Principle | 06/07/2011 | Date of final approval | 06/07/2011 | Area diverted | 1898.328 ha. | Uploaded Clearance Letter | Annexure-Uploaded clearance letter | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Permanent change of present land use at project site is expected for setting up of Power Plant.
The total area of 42.57 ha includes Main plant, water reservoir, switchyards, green-belt, etc. Presently 13.48 ha is Private Tenancy Land, which has been acquired for Mining Project. The land use at the time of acquisition was Single Cropping Rainfed Agricultural Land, which is now under Mining Project. 19.64 ha is Protected Forest Land and 9.45 ha is Revenue Forest Land, for which final approval | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Plant layout will be done in such a way that it will create minimum disturbance to existing land, vegetation and habitation. | 1.3 | Creation of new land uses? | Yes | Change from exiting landuse to Industrial land use for Power Plant & its auxiliary facilities. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil investigation will be carried-out at the proposed site. | 1.5 | Construction works? | Yes | Construction of Power Plant & its auxiliary facilities. | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary sites would be used for housing of construction workers. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | The entire Power Plant will be constructed above ground. There will be some cut and fill for foundations, leveling, etc. | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Generation of Electricity from combustion of coal washery rejects as fuel. | 1.14 | Facilities for storage of goods or materials? | Yes | Coal Stockyard for storage of coal, Storage tanks for LDO/HFO, Closed Storage yard for chemicals, spare parts, equipments, maintenance tools, etc. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | For solid waste, it is proposed to dispose / reuse as per plan stated below.
Ash Disposal System: About 68 Million Tons of ash will be generated over the life of the project of 25 years. It is proposed to use ash to the extent possible for manufacturing of Cement, Building Material, Road Construction, etc. Unutilized ash is proposed to be used for mine backfilling in Slurry/ HCSD (High Concentration Slurry Disposal) form.
For liquid wastes: The Clarifier underflow of Pre-Treatmen | 1.16 | Facilities for long term housing of operational workers? | Yes | Staff Colony will be developed for operation workers along with the colony for Mining Project and is not part of this proposal | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Approach for the plant from the nearby Bilaspur-Ambikapur road.
Conveyor system for coal washery rejects transportation.
Railway being developed for the mining project. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | •Conveyor system for coal washery rejects and railway line for coal transportation
•Water pipeline from Rehar / Atem river to the plant site
•Approach Road for Construction Material Transportation. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | Yes | New transmission line is proposed from power station to nearest STU / CTU. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Abstraction of surface water from Atem / Rehar River @ 13.14 MCM per year 1000 KLD of Groundwater abstraction is proposed for domestic and construction purpose. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not significant as water study report of Atem / Rehar River basin, indicates sufficient water is available to cater the need of the project. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of construction materials from nearby sources to construction work area during construction and transport of coal from washery to the plant site during operation. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Since industry attracts both skilled and unskilled labours, influx of population will be there to some extent. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Presently the entire land has been acquired for the Mining Project, which will be transferred/leased for the Thermal Power Project.
Plant layout will be based on minimum disturbance to existing vegetation. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water of Atem / Rehar River to be used @ approx. 13.14 MCM per year.
1000 KLD of Groundwater abstraction is proposed for domestic and construction purpose, after obtaining permission | 2.3 | Minerals (MT) | Yes | Coal Washery Reject will be used for the Project. The total requirement is estimated at 4.5 MTPA at PLF of 75%. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Stone, aggregate, soil, sand etc. from nearby area. | 2.5 | Forests and timber (source – MT) | No | Not Applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | •Coal Washery Reject: 4.5 MMTPA (75% PLF) with a average GCV of 2000 kcal/kg.
•LDO& HFO will be used as secondary fuel | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | 1. LDO
2. HFO.
3. Chlorine. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The region will turn to industrial and commercial zone from agricultural and rural economy. The industrial and commercial development is expected to have beneficial impact on the local people in terms of commercial and employment. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Hospitals, schools, road etc. will be developed under CSR activity of the Project Proponent. | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Will be minimum, since generation will be there from colony area only and the colony is not a part of this proposal. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Oily waste & sludge will be disposed off as per CPCB/MoEF guidelines. | 4.4 | Other industrial process wastes | Yes | Ash Only | 4.5 | Surplus product | No | Not Applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | STP Sludge will be used as manure after disinfection. | 4.7 | Construction or demolition wastes | No | Construction wastes, if any, will be used for landfill. | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | No | Not Applicable | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emission of dust and gases like NO2, SO2 etc.
ESP, Low NOx burners and other measures will be taken care to limit the emission within the prescribed norms. | 5.2 | Emissions from production processes | Yes | Emission of dust and gases Like NOX, SO2 etc. as per notification of MoEFCC.
1 RCC Stacks of 275 m height, with 4 Steel Flues are proposed for wider dispersion of the pollutants. | 5.3 | Emissions from materials handling including storage or transport | Yes | Not anticipated with usage of dust extraction and suppression system in ash silo, coal transfer point and coal bunkers. Also closed coal conveyors will be used in coal transportations. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Regular water sprinkling will be done at the project to minimize the dust emission during construction phase. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Some dust will be emitted while handling the construction materials like cement or bricks. | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise would be generated generally from steam turbine, generator, compressors, pumps, fans, coal handling plant etc. but all the equipment will be designed and if required acoustic materials will be provided to have the noise level not to exceed the values as stipulated in CPCB/MoEF norms. | 6.2 | From industrial or similar processes | Yes | Noise would be generated from transportation of material / machine. | 6.3 | From construction or demolition | Yes | Some noise would be generated during construction phase but it will be limited to the site only. | 6.4 | From blasting or piling | No | Not Applicable | 6.5 | From construction or operational traffic | Yes | During construction and coal transportation traffic | 6.6 | From lighting or cooling systems | Yes | Indirect process cooling, direct water spraying | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not Applicable | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Plant will follow the Zero Discharge concept. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Installing ESP and other air pollution control equipment will minimize the impact. Similarly COC maximization along with reuse will generate minimum discharge. ETP will be designed to meet stipulated standards. Treated effluent will be reused within the plant. So there will be no significant impact. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | Yes | Minimum impact on land and water due to state of art technology. The plant will be designed, constructed and operated to maintain all parameters within statutory limits. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | An assessment of conceptual design will be conducted to minimize the risk of fire at the coal stockyard, LDO & HFO storage tank, chlorine gas leaks from the pipeline/ tonner, breaching of ash pond due to failure of ash pond bound. | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The Project is proposed in Seismic Zone-III. At the time of construction work the regulations for the seismic zone III will be taken into consideration for designing and setting up the project. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Roads, railway line, housing development for company workers etc.
This will bring mostly positive change on the site.
Roads, infrastructure and housing development in the surrounding area.
The project will also undertake local community development under its CSR plan focusing on Education, Health & Sanitation, Livelihood development and Rural Infrastructure Development. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | It would be an industrially planned area. | 9.3 | Set a precedent for later developments | Yes | Later development will be taken into consideration. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No ecological sensitive zone except Protected Forests and Reserve Forests. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Only Protected Forests and Reserve Forests within 10 km radius of area and Atem River. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | No ecological sensitive zone except Protected Forests and Reserve Forests. | 4 | Inland, coastal, marine or underground waters | Yes | Atem River - 4 KM | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | No tourist or heritage site within 10 Km radius. | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | No | No major cities within 10 km radius | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | Not Applicable | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Only Protected Forests and Reserve Forests within 10 km radius from the site. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable.
Not The site comes under the Seismic Zone III. Therefore, consideration will be taken care during design and construction stages. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | R/Sir, with reference ADS letter dated 06.07.17, we hereby submitting our reply for proposed 4x150 MW TPP at Surguja in Chhattisgarh, for kind consideration. Surguja Power | 16 Jan 2018 | 2. | ADS Raise Letter | please submit the information as per enclosed letter. | 06 Jul 2017 | 3. | ADS Raise Letter | please submit the information as per enclosed letter. | 06 Jul 2017 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Santosh | Designation | Head - ESG & Environment | Name of Company (Applicant Name should not be given here) | Adani Power Ltd. | Address | Adani House, Nr Mithakhali Circle
Navrangpura, Ahmedabad.
Pin- 380009. |
|
|