EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TG/IND2/65449/2017    ii. MoEFCC File No. : IA-J-11011/316/2017-IA-II(I)    iii.Short narrative of the project: M/s. Saiteja Drugs & Intermidiates Pvt. Ltd.    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : SAITEJA DRUGS AND INTERMEDIATES PRIVATE LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.TelanganaNalgondaPochampalle
 
   vii.Date of TOR Granted 14 Nov 2017 viii.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 10 Jan 2018 x.Project Type: New
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 07 Jun 2006   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
Additional Attachments, if any
S.no. Attached File Date of Submission
1. EDS Reply19 Dec 2017
2. Part 1 of EDS Annexures19 Dec 2017
3. Part 3 of EDS Annexures19 Dec 2017
4. 2nd EDS Reply29 Dec 2017
5. 3rd EDS Reply10 Jan 2018
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe EAC, after deliberations, deferred the project for want of clarification/inputs and documentation in respect of the following:- ? Revision of the proposal for the project limited to manufacturing of APIs of 108 TPA (three products at a time @36 TPA) for the present. ? Revised Form-1. ? Monitoring report on compliance status of the conditions stipulated in the EC dated 22nd August, 2007. ? Addition of reservoir for raw water storage. 08 Mar 2018
2. ADS LetterUploading the required information as per the Additional Details Sought by MoEF&CC dated 08-3-2018 19 Feb 2019
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/1619/RA 0035    iii. Name of Consultant: KKB Envirocare Consultants Private Limited   iv. Address : KKB Envirocare Consultants Pvt. Ltd., Tarun Plaza, 1st Floor, #3-5-244, NFC Main Road, Krishna Nagar Colony, Moula-Ali, Hyderabad - 500040   v. Mobile No.: 9391013686   vi. Landline No.: 04065547107   vii. Email Id: saitejadrugsintermediates@gmail.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Chandrasekhara    ii. Designation : ManagingDirector    iii. Name of Company(Applicant Name should not be given here) : SAITEJA DRUGS AND INTERMEDIATES PRIVATE LIMITED    iv. Address : M/s. Saiteja Drugs and Intermediates Pvt. Ltd., H. No. 8-3-333/154, v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Print