EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/WB/IND/58221/2016
ii. MoEFCC File No. :
J-11011/192/2013-IA-II (I)
iii.Short narrative of the project:
Capacity expansion from 120000 TPA to 207360 TPA Billet / Rolled product and replacement of existing 4 x 8 Tons / heat capacity Induction Furnaces with 4x12 Tons / heat Induction Furnaces
iv. Project Sector :
Industrial Projects-1
v. Company/Proponent :
BMA STAINLESS LTD
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
West Bengal
Burdwan
Ausgram-II
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
Annexure-Uploaded EC Compliance report
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
17 Nov 2016
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
22 Dec 2017
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
21 Jul 2017
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
EDS Reply
22 Dec 2017
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
Observations of the committee 23.0 The committee observed that the EIA/EMP submitted is not as per the generic structure specified in EIA Notification, 2006. The details of existing facilities, resources, control system and proposed expansion are not clearly defined. It is also observed that no interpretation of baseline data, expenditure on pollution control equipment, inadequate HIRA, corporate environmental policy did not address the reporting mechanism of reporting non-compliances. Recommendations of the Committee: 24.0 After detailed deliberations, the committee advised to submit revised EIA report incorporating the following additional information. 1. Revised water balance and rainwater harvesting scheme 2. Revised material balance 3. Revised greenbelt development plan to c
08 Feb 2018
2.
ADS Letter
Expansion from 1,20,000 TPA to 2,07,360 TPA MS Billets / Rolled products by replacement of existing 4 x 8 Tons Induction Furnaces with 4x12 Tons Induction Furnaces at Village Debipur, P.O. Kalyaneshwari, District Burdwan of West Bengal by M/s BMA Stainless Limited – Reply to observations Environmental Clearance Regarding
22 Jun 2018
3.
NA
ADS reply was not satisfactory
13 Jul 2018
4.
ADS Letter
Reply to the observations made by 33rd Expert Appraisal Committee on 9th -11thJuly, 2018 against Agenda ParaNo. 32.26regarding Expansion from 1,20,000 TPA to 2,07,360 TPA MS Billets / Rolled products by replacement of existing 4 x 8 Tons Induction Furnaces with 4x12 Tons Induction Furnaces at Village Debipur, P.O. Kalyaneshwari, District Burdwan of West Bengal by M/s BMA Stainless Limited - Environmental Clearance Reg
30 Aug 2018
5.
NA
Public hearing was presided over by Dy.Magistrate (or) Dy.Collector. As per the EIA Notification 2006, public hearing has to be presided over by Officer not below the rank of Additional District Magistrate. Kindly clarify.
31 Aug 2018
6.
ADS Letter
Reply of ADS
03 Dec 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1619/RA0037
iii. Name of Consultant:
Vardan Environet
iv. Address :
D-142, Sushant Lok 3, Sector 57, Gurugram, Haryana
v. Mobile No.:
9953147268
vi. Landline No.:
01244291036
vii. Email Id:
bmasteel111@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Avinash
ii. Designation :
Director
iii. Name of Company(Applicant Name should not be given here) :
BMA STAINLESS LTD
iv. Address :
Village Debipur PO Kalyaneswari District Burdwan West Bengal
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Print