iii.Short narrative of the project:
Bayal Quartz & Feldspar Mine
iv. Project Sector :
Mining Projects
v. Company/Proponent :
PRAMESH SINGH
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Haryana
Mahendragarh
Narnaul
2.
Haryana
Mahendragarh
Narnaul
vii.Date of TOR Granted
17 May 2017
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
30 Nov 2017
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
24 Oct 2017
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
conservation plan, Mining Plan, District Survey reports will be submitted in hard copy due to less space availability
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The committee therefore deferred the proposal and asked the proponent to submit the following:- 1) Revised lease deed after inclusion of names of all the minerals to be mined. 2) The method of mining should be in accordance with Ministry’s O.M No Z-11013/57/2014-IA.II (M) dated 29.10.2014 and mining plan should be prepared accordingly, the exploration details and production planning needs to be revised accordingly in the mining plan. 3) The District Survey Report (DSR) prepared in accordance with Appendix-X as per S.O 141(E) dated 15.01.2016 for all the minerals to be mined and Final DSR needs to be submitted. 4) The Quantity of waste to be generated in entire life of the mine along with its method of disposal and stabilization needs to be mentioned in the mining plan and EIA Report.
03 Jan 2018
2.
ADS Letter
Reply to the ADS sought by the MS
08 Feb 2018
3.
ADS Letter
Reply to the ADS sought by the MS
08 Feb 2018
4.
NA
Based on the presentation made, discussion held and documents submitted by the project proponent, the Committee deferred the proposal and proposal may be considered before the next EAC after submission of following documents:- a) Revised R&R Plan in respect of revision and enhancement of cost of construction of houses. b) Spatial Configuration of the lease boundary, surface features, distance of habitation, type of blasting, danger zone, quantity of the mineral, ultimate pit limit , post mining land use details, mineral reserves needs to be corrected after considering the restriction on mining as proposed by the committee in the mining plan and EIA. c) Final DSR needs to be submitted. d) Revised Budget of EMP needs to be submitted.
10 Mar 2018
5.
ADS Letter
Reply to the Query raised during 28th EAC meeting is uploaded. Hard copy of the same will be submitted with revised EIA, EMP, Revised Mining plan, revised DSR and Conservation plan.
14 Mar 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1518/IA 005
iii. Name of Consultant:
Voyants Solutions Pvt. Ltd.
iv. Address :
403, Park Centra,
v. Mobile No.:
9999019697
vi. Landline No.:
HARYANA
vii. Email Id:
rekhasingh@voyants.in
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Pramesh
ii. Designation :
Signatory
iii. Name of Company(Applicant Name should not be given here) :
PRAMESH SINGH
iv. Address :
Mr. Pramesh Singh
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Print