EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/KA/IND/23395/2014    ii. MoEFCC File No. : J-11011/205/2014-IA-II(I)    iii.Short narrative of the project: Tor proposal for installation of steel Plant, power plant based on waste heat Recovery at Hanumanhalli Village, Danapur mndal, Hospet Taluk, Bellary District-Karnataka by M/s The Sandur managenese & I    iv. Project Sector : Industrial Projects-1    v. Company/Proponent : M/s The Sandur managenese & Iron Ores Limited.
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.KarnatakaBellaryHospet
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 24 Mar 2015 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 31 Oct 2017 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 27 Jul 2017   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe committee desired following information / clarification for further consideration of the proposal: i. Revised information on configuration in the tabular form inter alia include existing facilities; proposed expansion and total capacity after expansion. ii. Details of year wise production (actual vis a vis consent) since inception. iii. Revised information for ToR Point 1, 3(ii), 3(iii), 3(iv), 3(viii), 3(ix), 6(vii), 6(x), 9(i), 9(ii), 9(iii) and 11. iv. Mist spray / dry fog arrangement at hoppers of the receiving bunkers of coal / raw material, v. Action plan for 100% utilization of fly ash and BF slag vi. Brief note on wet quenching vis a vis dry quenching w.r.t. environmental impacts and cost benefit analysis vii. Soil analysis shall be carried based on land use classificati 13 Dec 2017
2. ADS LetterWith reference to the mail dtd:-13.12.2017 for Additional Details Sought vide sl. no.6 are complied point wise (all the details sought) in the revised EIA/EMP report attached herewith for your kind consideration. We request you to kindly consider our Environment Clearance at the earliest. 09 Jan 2018
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/RA039/063    iii. Name of Consultant: Visiontek Consultancy Services Pvt. Ltd.   iv. Address : Plot-no-M-22 & 23, Chandaka Industrial Estate, Patia, Bhubaneswar-751024   v. Mobile No.: 9338772882   vi. Landline No.: 06746451781   vii. Email Id: suresh@sandurgroup.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Md Abdul Saleem    ii. Designation : Director - Mines    iii. Name of Company(Applicant Name should not be given here) : THE SANDUR MANGANESE IRON ORES LIMITED    iv. Address : 1A & 2C, REDIFICE SIGNATURE N 06, HOSPITAL ROAD,SHIVAJI NAGAR, BANGALORE v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency