EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/KA/IND/70331/2016    ii. MoEFCC File No. : J-11011/208/2016-IA.II(I)    iii.Short narrative of the project: Expansion of Ore Beneficiation Plant    iv. Project Sector : Industrial Projects-1    v. Company/Proponent : THAKUR INDUSTRIES
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.KarnatakaKoppalKoppal
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 19 Sep 2016 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 12 Dec 2017 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 18 Aug 2017   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe committee observed that the permission for withdrawal of ground water from the competent authority was not provided in the EIA/EMP Report, Issues raised by the public during the public hearing and commitment of the project proponent made on the issues were not clear; No details provided on the Enterprise Social Commitment (ESC); Corporate Environmental Policy as per the ToR Point 9 was not provided; Organizational setup for the environmental management was not provided in the EMP; Air quality modelling was carried taking into consideration of the boiler, where there is no proposal of the boiler in the instant proposal, noise monitoring was not carried as per the guidelines; BOD, COD and DO was not analysed in the surface water samples; solid waste management is not clear in the EMP Re 05 Jan 2018
2. ADS LetterRef.: Your letter No. F. No. J-11011/208/2016-IA-II (I) dated 25th January 2018. With reference to above, we are herewith submitting additional clarification sought after technical presentation before 27th EAC meeting held in the month of jan 2018, for our proposed expansion of Ore Beneficiation Plant with throughput capacity from 0.60 million tons per annum a to 1.50 million tons per annum at Hirebaganal Village, Koppal Taluk & District, Karnataka State. 09 Jun 2018
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/1518/RA 014    iii. Name of Consultant: METAMORPHOSIS Project Consultants Pvt. Ltd.   iv. Address : "PRAKRUTI BHAVAN" #200, 1st & 2nd Floor, 1st Cross, 40th Main, Behind Central Silk Board, BTM Layout II Stage, Bengaluru-560 068, Karnataka, INDIA.   v. Mobile No.: 9845027475   vi. Landline No.: 26783006   vii. Email Id: thakurind07@gmail.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Shekhar    ii. Designation : Manager    iii. Name of Company(Applicant Name should not be given here) : THAKUR INDUSTRIES    iv. Address : Sy.No. 234 B & 235 B, Hirebagnal Village, Koppal Taluk & District v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency