EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/RJ/MIN/22656/2013
ii. MoEFCC File No. :
J-11015/25/2014-IA.II (M)
iii.Short narrative of the project:
Renewal of mine lease of Ball Clay, China Clay, Red & Yellow Ochre mining with enhancement of production capacity from 2,415 TPA to 0.125 million TPA
iv. Project Sector :
Mining Projects
v. Company/Proponent :
M/s Raw Products Plasters & Fertilizers (Mines)
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Rajasthan
Bikaner
Kolayat
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
Annexure-Uploaded EC Compliance report
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
05 May 2014
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
30 Apr 2018
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
09 Jun 2017
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
None
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
EDS Reply
30 Apr 2018
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The Committee, after detailed deliberations, deferred the proposal and sought the following requisite information:- (i). Government of Rajasthan may be asked to submit the valid lease documents and current status of lease whether it is valid or not. (ii). Two schedule-I faunal species i.e. Gazella bennettii (Chinkara) and Felislybica (Desert Cat) are found in the study area. Conservation Plan for the same has been prepared. The Committee deliberated the conservation plan and is of the view that budget for conservation plan needs to be adequately increased for its implementation. Proof of submission of conservation plan also needs to be submitted. (iii). PP needs to submit the detailed Green Belt Development plan on periphery of the lease along with type of plantation etc. Plant
22 May 2018
2.
ADS Letter
We are herewith submitting ADS Reply
31 May 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA1619/RA 0069
iii. Name of Consultant:
J.M Environet Pvt Ltd
iv. Address :
1st & 2nd floor, SCO 16, Sector 10 A Pace city Gurgaon Haryana
v. Mobile No.:
1414001345
vi. Landline No.:
1414001345
vii. Email Id:
saurabhchandna@yahoo.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
MRS SUGANDH
ii. Designation :
PARTNER
iii. Name of Company(Applicant Name should not be given here) :
RAW PRODUCTS PLASTERS FERTILIZERS
iv. Address :
RATHKHANA COLONY
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Print