EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TN/MIS/67492/2017    ii. MoEFCC File No. : 11-43/2017-IA.III    iii.Short narrative of the project: Proposed Construction of High Level Bridge across Pulicat Lake Connecting 0/4 of Chennai – Pulicat Road to Pasiyavaram Road    iv. Project Sector : INFRA-2    v. Company/Proponent : HIGHWAYSDEPARTMENT
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Tamil NaduTiruvallurPonneri
 
   vii.Date of TOR Granted N/A viii.TOR letter issued by Ministry: N/A ix.Date of Submission for EC: 09 Oct 2017 x.Project Type: New
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 07 Aug 2017   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
Additional Attachments, if any
S.no. Attached File Date of Submission
1. IRS Report18 Aug 2017
2. Reply for EDS with Annexures29 Aug 2017
3. Reply for recent EDS with Annexure09 Oct 2017
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NADEFERRED SUBJECT TO SOME CLARIFICATION 07 Dec 2017
2. ADS Letter“Supplementary marine EIA report with special focus on birds” has been prepared and submitted. Hence I request that this document may please be added with the proposal of Ministry’s portal for Environment Clearances already furnished by this department and issue the stage-II clearance for the work of Construction of high level bridge km 0/4 of Chennai – Pulicat Road to Pasiyavaram Road. 31 May 2018
3. ADS Letterplease find attached herewith ADS LETTER DATED 11.06.2018 AND REQUESTED TO SUBMIT STUDY REPORT CONTAINING OBSERVATIONS OF THE EAC AS IN THE 179TH MEETING TO ENABLE THIS MINISTRY IN TAKING FURTHER COURSE OF ACTION. 14 Jun 2018
4. ADS LetterHerewith we are enclosing the "Supplementary report on flow modeling and marine EIA report". 13 Oct 2018
4. Accredited Consultant Details
   i. Accreditation status : No    ii. Reason for not hiring the Consultant : Not required
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Executive    ii. Designation : executiveengineer    iii. Name of Company(Applicant Name should not be given here) : HIGHWAYSDEPARTMENT    iv. Address : Palaverkadu Village, Ponneri Taluk, Tiruvallur Disrict v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency