EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/CG/MIN/53139/2016
ii. MoEFCC File No. :
J-11015/150/2016.IA.II(M)
iii.Short narrative of the project:
Shri Bajrang Iron Ore Mine LESSEE-SHRI BAJRANG POWER & ISPAT LIMITED,
iv. Project Sector :
Mining Projects
v. Company/Proponent :
SHRI BAJRANG POWER ISPAT LIMITED
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Chhattisgarh
Kanker
Bhanupratappur
2.
Chhattisgarh
Kanker
Bhanupratappur
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
Annexure-Uploaded EC Compliance report
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
10 Jun 2016
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
12 Oct 2017
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
18 Jul 2017
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
None
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
Reply to EDS is uploaded as Additional document containing a. Accreditation letter b. lease deed execution c. approved conservation plan d. CGWA approval Searchable PDF of EIA Report is uploaded Approved mining plan is uploaded
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
Production Details
15 Sep 2017
2.
approved mining plan
12 Oct 2017
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The Committee deliberated on the proposal and deferred it as proposal contains multiple issues which need to be addressed (as mentioned in preceding paras). The PP is advised to submit the following:- • Reclamation/ backfilling plan vis-a-vis progressive mining activity • Air pollution modelling w.r.t. SO2 and CO for impact prediction considering diesel consumption • Latest status of the compliances and remedial action taken on the observations made by MoEFCC R.O. • Permission obtained from CGWA/ State Groundwater Department for groundwater withdrawal • Details of enhanced Enterprise Social Commitment (ESC) budgetary provisions considering practical aspects in implementing the proposed measures.
07 Dec 2017
2.
ADS Letter
Clarifications for the quaries raised vide EAC MOM for Nov 2017, and EDS by MOEFCC for file no. IA/CG/MIN/53139/2016 of M/s Bhajrang Steel &Power , Hahalddi Iron ore mine
09 Dec 2017
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1316/RA002
iii. Name of Consultant:
B. S. Envi-Tech Pvt. Ltd.
iv. Address :
B. S. Envi-Tech Pvt. Ltd. 12-13-1270/71/73, Amity Ville, 4th Floor, Beside Spencer Super Market, St. Ann’s Road, Tarnaka, Secunderabad-500017
v. Mobile No.:
9848053012
vi. Landline No.:
TELANGANA
vii. Email Id:
bajrangtelang@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Shravan
ii. Designation :
Director
iii. Name of Company(Applicant Name should not be given here) :
SHRI BAJRANG POWER ISPAT LIMITED
iv. Address :
Borjhara, Urla - Guma Road Raipur (CG)
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency