EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/JH/IND/56904/2016    ii. MoEFCC File No. : J-11011/305/2012-IA-II(I)    iii.Short narrative of the project: Expansion of Integrated Steel Plant from 0.5 to 0.7 MTPA    iv. Project Sector : Industrial Projects-1    v. Company/Proponent : RUNGTA MINES LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.JharkhandSeraikela KharsawanRajnagar
2.JharkhandSaraikela KharRajnagar
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 18 Oct 2016 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 25 May 2017 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 13 May 2017   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAAfter detailed deliberations, the committee sought following information for further consideration of the proposal i. The PP shall clarify in writing that there is no court case or litigation is pending against the project. ii. Certificate of closure of non-compliances of the earlier EC conditions from the Regioanl office of MoEFCC. iii. Site plan design for the proposed expansion should be reviewed and amended considering the likely impacts on the nearby villages, Chaliyama and Banksia villages. iv. Standard operating procedures for the Environmental Monitoring and regular calibration of monitoring equipment shall be included in the Environmental Management Plan. v. System for reporting of non-compliance of EC conditions to the Board of Directors as a part of Corporate Environ 11 Aug 2017
2. ADS LetterReply as per remarks for expansion of Chaliyama Steel Plant 24 Aug 2017
3.NAAfter detailed deliberation the committee, in agreement with the PP, deferred the proposal for submission of the action plan for utilization of the fly ash and closure of non-compliances pointed out by Regional office of MoEFCC 15 Sep 2017
4.NAAfter detailed deliberation the committee, in agreement with the PP, deferred the proposal for submission of the action plan for utilization of the fly ash and closure of non-compliances pointed out by Regional office of MoEFCC 21 Sep 2017
5. ADS LetterReply of additional information sought by MS for submission of action plan for utilization of flyash and submit the certificate of closure of non-compliances from the regional office of the MoEF&CC Ranchi 25 May 2018
6. ADS LetterReply of additional information sought by MS for submission of action plan for utilization of flyash and submit the certificate of closure of non-compliances from the regional office of the MoEF&CC Ranchi 25 May 2018
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : Min Mec is preparing and presenting reports as per    iii. Name of Consultant: Min Mec Consultancy Pvt. Ltd.   iv. Address : A-121, Paryavaran Complex, IGNOU Road, New Delhi   v. Mobile No.: 9811077603   vi. Landline No.: 01129535891   vii. Email Id: dsp@rungtamines.co.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Pradeep    ii. Designation : Joint Vice President    iii. Name of Company(Applicant Name should not be given here) : RUNGTA MINES LIMITED    iv. Address : Rungta House, Chaibasa v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency