EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/RJ/MIN/62699/2014    ii. MoEFCC File No. : J-11015/63/2014-IA.II(M)    iii.Short narrative of the project: Dhani AbdullaWali Gypsum Mine (Area-1278 ha) at Village-Dhani Abdulla,Tehsil-Kolayat,District-Bikaner,Rajasthan    iv. Project Sector : Mining Projects    v. Company/Proponent : D.S. Acharya
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.RajasthanBikanerKolayat
2.RajasthanBikanerKolayat
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 07 May 2014 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 10 Feb 2018 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 10 Aug 2015   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: We are hereby submitting all required information as desired EDS by MoEF & CC
Additional Attachments, if any
S.no. Attached File Date of Submission
1. The reply to the EDS generated by MoEF&CC is duly submitted for your ready reference in the additional details tab31 Oct 2017
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe Committee, after detailed deliberations, deferred the proposal and sought the following requisite information:- (i). The Committee noted that EIA/EMP report is not legible; therefore a clear legible copy of EIA/EMP along with all Annexures needs to be submitted; (ii). Detailed Action Plan on the issues raised during Public Hearing needs to be submitted along with budgetary provisions; (iii). PP needs to submit the detailed Green Belt Development plan on periphery of the lease along with type of plantation etc.; PP needs to plant the edible species in an around the mine lease area in consultation with villagers; (iv). Detail compliance of TOR 39 w.r.t. Project cost & EMP cost needs to be submitted; (v). Production details authenticated by Mines and Geology needs to be 04 Apr 2018
2. ADS LetterCompliance of MoEF&CC letter n- J-11015/63/2014/IA-II (M) dated 11-04-2018 regarding production capacity expansion at Dhani Abdulla Wali Gypsum Mine. 20 Jul 2018
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : S.No-95/Rev.49/Jan.11, 2017    iii. Name of Consultant: Mantec Consultants Pvt.Ltd   iv. Address : D-36,Sector-6,Noida,U.P-201301   v. Mobile No.: 9414163345   vi. Landline No.: 01204215804   vii. Email Id: dsacharya2011@gmail.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : D.S.    ii. Designation : Senior Manager (Geology)    iii. Name of Company(Applicant Name should not be given here) : D.S. Acharya    iv. Address : SBU & PC Gypsum 02, Gandhi Nagar Scheme Bikaner, Rajasthan v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency