1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/CG/MIN/62407/2014
ii. MoEFCC File No. :
J-11015/141/2014-IA.II(M)
iii.Short narrative of the project:
Bailadila Iron Ore Mine of M/s. NMDC Limited located at Bacheli, South Bastar Dantewada District, C.G 309.340 Ha Capacity expansion of Bailadila Deposit-10 Mine from 4.2 to 6.0 MTPA
iv. Project Sector :
Mining Projects
v. Company/Proponent :
M JAYAPAL REDDY
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Chhattisgarh
Dantewada
Dantewada
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
Annexure-Uploaded EC Compliance report
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
12 Aug 2014
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
10 Feb 2017
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
15 Nov 2016
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
Extension of validity of TOR
10 Feb 2017
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The Committee, during the presentation, deliberated on the compliance report of the MoEFCC R.O. Bhubaneswar and noted the shortcomings in green belt development and plantation. It was also noted that the permission for withdrawal of water, land-use pattern study, community development work break-up details, expenditure made on green belt development and detailed water conservation plan not provided to the MoEFCC R.O. Bhubaneswar during inspection. The PP claimed that adequate plantation has been carried out in the mine lease area, however, the plantation details checked from KML file (provided by the PP) on Google Earth shown that adequate plantation is not carried out. Accordingly, Committee asked the PP to resubmit the KML file showing adequate plantation in the mine lease area. Consider
06 Apr 2017
2.
ADS Letter
Submission of additional details sought by M.S, MOEFC&CC for grant of E.C for capacity. exp. of Bailadila Deposit-10 mine of NMDC from 4.2 to 6.0 MTPA.
12 May 2017
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
150
iii. Name of Consultant:
VIMTA LABS LTD
iv. Address :
142, IDA, PHASE II, CHERLAPALLY HYDERABAD
v. Mobile No.:
9000711309
vi. Landline No.:
04027264141
vii. Email Id:
jayapalreddy@nmdc.co.in
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
M JAYAPAL REDDY
ii. Designation :
CHIEF GENERAL MANAGER (RESOURCE PLANNING)
iii. Name of Company(Applicant Name should not be given here) :
NMDC LIMITED
iv. Address :
REGD OFFICE 10 3 311A KHANIJ BHAVAN CASTLE HILLS MASAB TANK HYDERABAD 500028
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print