EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/MH/NCP/61881/2017    ii. MoEFCC File No. : 21-24/2017-IA-III    iii.Short narrative of the project: Amendment/Expansion for ‘Proposed Slum Rehabilitation Scheme’ at Jaldhara SRA CHS at C.T.S. No. 827 D/1 (pt) & 827 –D/2(pt) of Village Malad (E ) At Shree Krishna Nagar ,Gen Arun Kumar Marg, Goregaon (E), Mumbai-400065 by M/s. VGS Realty Constructio    iv. Project Sector : INFRA-1    v. Company/Proponent : OMKAR GROUP
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.MaharashtraMumbai (Suburban)Malad
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted N/A ix.Date of Submission for EC: 20 Jan 2017 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 01 Jan 1900   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: Nil
Additional Attachments, if any
S.no. Attached File Date of Submission
1. form 1,1A , comparative statement20 Jan 2017
2. previous EC letter20 Jan 2017
3. pmr ack20 Jan 2017
4. pmr acknow20 Jan 2017
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAAfter detailed deliberation, the Committee sought following addl. information : (i) PP should clarify the difference in the built-up area as mentioned in the form1 vis a vis approval granted by SRA. (ii) Certified compliance report on the environmental conditions stipulated in the existing EC from the Regional Office, Nagpur. (iii) The Committee also suggested them to provide adequate parking space to the flat owner. The proposal was deferred till the desired information is submitted. The above information shall be provided with the uploading of minutes on the website. 07 Mar 2017
2. ADS LetterSubmission of point wise compliance for 14.3.5 item no , 14th EAC Meeting (Infra 2) 29 Apr 2017
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 46    iii. Name of Consultant: Enviro Analysts & Engineers Pvt. Ltd.   iv. Address : B-1003,Enviro House,10th floor. Western Edge-II,W.E Highway. Borivali(E),Mumbai-400066   v. Mobile No.: 9320280155   vi. Landline No.: 28541647   vii. Email Id: moef.omkar@omkar.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Madan    ii. Designation : Authorized Signatory    iii. Name of Company(Applicant Name should not be given here) : OMKAR GROUP    iv. Address : Omkar House, Off Eastern Express Highway, Opp SIon chunnabhatti signal, Sion East, Mumbai -400022. v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL