Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/MH/NCP/61764/2017
ii. MoEFCC File No. :
21-96/2017-IA-III
iii.Short narrative of the project:
Amendment in Environmental Clearance for “Neelkanth Woods”,Mullabaug, Near Hill Crest Society ,off Ghodbunder Road, Thane (W) at Survey No. 312/1A, 313/3, 314/5, 314/7, 314/9, 315/3, 316 (PT), 317/4,318/1D and 321/3B, Majiwada Village, Thane by M/
iv. Project Sector :
INFRA-1
v. Company/Proponent :
H K D
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Gujarat
Bharuch
Jhagadia
2.
Maharashtra
Thane
Thane
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
NIL
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
N/A
ix.Date of Submission for EC:
02 Mar 2017
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
26 Dec 1938
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
The project has received EC dated 23rd December 2013 for total construction area 347310.9 sqm. we are proposing amendment where the total construction area comes to 346550.45 sqm hence there is no need for TOR submission. we also have attached the EC letter along with forms for your ready reference. This an amendment of previous EC as there is decrease in the construction area. therefore we are submitting it as an EC project
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
Pl. see 15th EAC Infra-2 meeting. The proposal was deferred till the desired information is submitted. The above information shall be provided with the uploading of minutes on the website.
03 May 2017
2.
ADS Letter
compliance of 15 EAC meeting item no. 15.4.11 for Amendment in Environmental Clearance for “Neelkanth Woods”, Mullabaug, Near Hill Crest Society ,off Ghodbunder Road, Thane (W) at Survey No. 312/1A, 313/3, 314/5, 314/7, 314/9, 315/3, 316 (PT), 317/4,318/1D and 321/3B, Majiwada Village, Thane by M/s T.Bhimjyani Realty Pvt Ltd. - Environmental Clearance [21-96/2017-IA-III; IA/MH/NCP/61764/2017]
04 Jul 2017
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
46
iii. Name of Consultant:
EAEPL
iv. Address :
Enviro Analysts and Engineers Private Limited. B-1003,Enviro House,10th floor| Western Edge-II, W.E Highway|Borivali(E),Mumbai-400066
v. Mobile No.:
9321619749
vi. Landline No.:
91-22 2854 1647
vii. Email Id:
hkdesai5@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Suresh
ii. Designation :
Proprietor
iii. Name of Company(Applicant Name should not be given here) :
H K D
iv. Address :
B-1003, 10th Floor, Western Edge II, W.E Highway, Borivali east
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL