EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TN/IND2/60940/2016    ii. MoEFCC File No. : J-11011/42/2016-IA II(I) and J-11011/190/2016-IA I    iii.Short narrative of the project: Proposed Revamp of Diesel Hydro De-Sulphurisation (DHDS) unit from 1.8 MMTPA to 2.34 MMTPA and BS-VI Fuel quality upgradation project (Revamp of DHDT unit, New FCC GDS unit and SRU Block for MS qualit    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : CHENNAI PETROLEUM CORPORATION LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Tamil NaduTiruvallurAmbattur
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 30 Nov 2016 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 08 Dec 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 01 Jan 1900   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: Proposed Revamp of DHDS unit to increase the capacity from 1.8 MMTPA to 2.34 MMTPA and BS-VI fuel quality upgradation project (Revamp of DHDT Unit, New FCC GDS unit and SRU Block for MS quality upgradation & increased BS-VI Diesel production). Public Hearing is exempted as per para 7(i) III Stage (3)(i)(b) of EIA Notification, 2006 for preparation of EIA/EMP Report, being site is located in the Notified industrial area.
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAAfter detailed deliberation committee noted that PP did not submitted the Certified compliance report of existing EC, Committee sought following additional information: 1) Certified compliance report from RO, MoEF&CC of existing EC to be submitted. 2) Measure the SO2 emissions from the existing unit. Any additional SO2 emission from the proposed unit. 3) List of existing and proposed utilities to be submitted. 4) Revised green belt plan to be submitted. 5) Proper response and commitment w.r.t. issues raised during public consultation. 6) Existing and proposed water balance chart to be submitted. 7) CSR plant at the rate of 5 % to be submitted. The proposal was deferred till the desired information is submitted. 20 Feb 2017
2. ADS LetterDocuments attached 1. Cover letter 2. MoEF&CC queries and reply for 18th EAC meeting held on 25th January 2017. 20 Mar 2017
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 78    iii. Name of Consultant: Dr.J.R.Moses   iv. Address : A21, III Phase, Guindy, Chennai-600032   v. Mobile No.: 9884390811   vi. Landline No.: 04443635500   vii. Email Id: snatrajan@cpcl.co.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Jayakumar P    ii. Designation : Deputy General Manager (Business Development)    iii. Name of Company(Applicant Name should not be given here) : CHENNAI PETROLEUM CORPORATION LIMITED    iv. Address : New 536, teynampet, Anna salai, Chennai v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL
Print