EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/MH/MIS/60650/2016
ii. MoEFCC File No. :
21-59/2016-IA-III
iii.Short narrative of the project:
Environmental Clearance for Proposed Residential Building on Plot Bearing C.T.S No. 284 Of Village Bhandup, Mumbai, Maharashtra
iv. Project Sector :
INFRA-2
v. Company/Proponent :
Dr. Umesh S. Kulkarni
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Maharashtra
Mumbai City
Mumbai
vii.Date of TOR Granted
N/A
viii.TOR letter issued by Ministry:
N/A
ix.Date of Submission for EC:
25 Nov 2016
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
25 Nov 2016
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
Nil
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
the Committee sought following additional information: (i) Give details of the past history of the project related to submission of application at the SEIAA Maharashtra. (ii) Respond to the comments made by the SEAC/SEIAA during the presentations at Maharashtra, based on minutes of SEAC/SEIAA meetings. (iii) Give a conformity status to conditions stipulated in Annexure XIV of the amended EIA notification of 09-12-2016. (iv) Copy of approved Sanction plan. (v) Layout plan indicating road, greenbelt, drainage, sewer line, STP, solid waste handling area, rain water harvesting structure, etc. in different colour to be furnished. (vi) Layout of parking plan indicating entry and exit points of vehicular movement as well as traffic management plan. Highlight the fire tender pathway. (v
16 Jan 2017
2.
ADS Letter
Submitting additional information sought by the EAC in the Minutes of 12th EAC (Infra - 2) Meeting, Item No.12.3.15 held on 27/12/2016.
10 Feb 2017
4.
Accredited Consultant Details
i. Accreditation status :
No
ii. Reason for not hiring the Consultant :
Documents prepared by M/s. Fine Envirotech Engineer (FEE) earlier NABET- QCI No was 154, later FEE obtained stay order on NABET from Hon Bombay High Court.
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Dr. Umesh S. Kulkarni
ii. Designation :
Proprietor
iii. Name of Company(Applicant Name should not be given here) :
Dr. Umesh S. Kulkarni
iv. Address :
102, Hiren Industrial Estate,Mogul Lane, Mahim, Mumbai - 400016
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print