1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/MH/NCP/60646/2016    ii. MoEFCC File No. : 21-70/2016-IA-III    iii.Short narrative of the project: Amendment in Proposed Residential cum Commercial Project on land bearing S No. / H. No. 110/1 (PT), 224/1A (PT), 224/1B (PT), 26/7(PT), 26/8(PT) Village Ghodbunder, Thane by JP Infra Mumbai Pvt. Ltd. & SPH Agro Farms & Estates Pvt. Ltd. (joint ventur    iv. Project Sector : INFRA-1    v. Company/Proponent : MS JP INFRA MUMBAI P L
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.MaharashtraThaneThane
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted N/A ix.Date of Submission for EC: 25 Nov 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 01 Jan 1900   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: Nil
Additional Attachments, if any
S.no. Attached File Date of Submission
1. form 125 Nov 2016
2. form 1A25 Nov 2016
3. comparative statement25 Nov 2016
4. previous EC letter25 Nov 2016
5. annexures25 Nov 2016
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAthe Committee sought following additional information: (i) Revised form1, IA and sanction plan. (ii) Certified compliance report issued by the Regional Office, Nagpur on the existing environmental conditions stipulated in environmental clearance. (iii) Give a conformity status to conditions stipulated in Annexure XIV of the amended EIA notification of 09-12-2016. (iv) Approved sanction plan. (v) Layout plan indicating road, greenbelt, drainage, sewer line, STP, solid waste handling area, rain water harvesting structure, etc. in different colour to be furnished. (vi) Layout of parking plan indicating entry and exit points of vehicular movement as well as traffic management plan. Highlight the fire tender pathway. (vii) Details energy conservation measures to be taken. taken (all points mentioned in the proposal such as orientation to support reduced heat gain, use of ASHRAE 90.1, use of ECBC compliant envelope measures to be supported through drawings and details in the pro 16 Jan 2017
2. ADS LetterPFA FOR FINAL COMPLIANCE REPORT FOR ITEM NO. 12.4.11 FOR 12TH EAC MTG- J P INFRA 22 Feb 2017
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 46    iii. Name of Consultant: Enviro Analysts & Engineers Pvt. Ltd.   iv. Address : B-1003,Enviro House,10th floor. Western Edge-II,W.E Highway. Borivali(E),Mumbai-400066   v. Mobile No.: 9320280155   vi. Landline No.: 28541647   vii. Email Id: abhishek@jpinfra.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Abhishek    ii. Designation : Authorized Signatory    iii. Name of Company(Applicant Name should not be given here) : MS JP INFRA MUMBAI P L    iv. Address : 4th Floor, Viraj Tower, Western Express Highway, Near WEH Metro Station, Andheri(East), Mumbai, Maharashtra. v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL