EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/MH/NCP/60119/2016
ii. MoEFCC File No. :
21-73/2016-IA-III
iii.Short narrative of the project:
EON IT Park at Survey no 72/2/1,Kharadi,Pune
iv. Project Sector :
INFRA-1
v. Company/Proponent :
EON KHARADI INFRASTRUCTURE PVT.LTD
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Maharashtra
Pune
Haveli
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
NIL
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
N/A
ix.Date of Submission for EC:
29 Nov 2016
x.Project Type:
Modernization
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
14 Apr 2016
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
--
Additional Attachments, if any
S.no.
Attached File
Date of Submission
1.
Previous EC letter
29 Nov 2016
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
the Committee sought following additional information: (i) Certified compliance report issued by the Regional Office, Nagpur on the environment conditions stipulated in the existing EC. (ii) Give details of the past history of the project related to submission of application at the SEIAA Maharashtra. (iii) Give a conformity status to conditions stipulated in Annexure XIV of the amended EIA notification of 09-12-2016. (iv) Action plan for management of E- waste generated from the IT building. (v) Layout plan indicating road, greenbelt, drainage, sewer line, STP, solid waste handling area, rain water harvesting structure, etc. in different colour to be furnished. (vi) Layout of parking plan indicating entry and exit points of vehicular movement as well as traffic management plan. Highlight the fire tender pathway. (vii) Details of source of water supply alongwith permission to be submitted. (viii) Excess treated sewage disposal plan/scheme to be submitted. (ix) Efforts shal
16 Jan 2017
2.
ADS Letter
With reference to the minutes of the 12th EAC(Infra-2)meeting and the ADS generated we are uploading the documents for Item no 12.4.14 EON IT PARK at Kharadi Pune.
24 Jan 2017
3.
NA
Please uplod additional information
14 Feb 2017
4.
ADS Letter
With reference to the discussions held in the 14th EAC (Infra-2)meeting dated 13/02/2017 we are submitting herewith the revised ECBC compliance as suggested by the committee for item no 14.2.5 bearing file no 21-73/2016-IA-III.
16 Feb 2017
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1417/RA010
iii. Name of Consultant:
Ultra-Tech Environmental Consultancy & Laboratory
iv. Address :
Saudamini Commercial Complex’ Building C-3, 2nd Floor’Right Bhusari Colony, Paud Road, Kothrud, Pune- 411038
v. Mobile No.:
9623509193
vi. Landline No.:
020- 25286109
vii. Email Id:
eonkharadi2016@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Anand
ii. Designation :
Authorized Signatory
iii. Name of Company(Applicant Name should not be given here) :
EON KHARADI INFRASTRUCTURE PVT.LTD
iv. Address :
S.no 72/2/1,Kharadi,Haveli,Pune
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL