1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/MH/IND2/51174/2016
ii. MoEFCC File No. :
J-11011/98/2016- IA II(I)
iii.Short narrative of the project:
Installation of Gasoline Hydrotreatment Unit (GTU) and associated facilities to produce 100% BS-VI MS
iv. Project Sector :
Industrial Projects-2
v. Company/Proponent :
BHARAT PETROLEUM CORPORATION LIMITED
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Maharashtra
Mumbai (Suburban)
Kurla
2.
Maharashtra
Mumbai (Suburban)
Kurla
vii.Date of TOR Granted
15 Jul 2016
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
22 Oct 2016
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
25 Sep 2012
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
None
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
1) Public Hearing has been exempted as per TOR. MOM of last Public Hearing conducted has been attached for reference. 2) Annexure and Appendix are not be uploaded due to size limitation.
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
the Committee sought the following additional information: 1. Revised water balance chart w.r.t. existing and proposed water requirement with special emphasis on water recycling and reuse. 2. Fresh water requirement shall be based on quantity of treated effluent sent by M/s RCF for consumption in Refinery. Realistic figure of fresh water should be worked out with MoU signed between M/s RCF and M/s BPCL. 3. Five year plan at the rate of 2% of project cost under CSR activities. The above information may be up uploaded through online on Ministry website
07 Dec 2016
2.
ADS Letter
loaded water balance, other file for MOU with RCF Fresh water requirement, Five year ESR activities plan is not being loaded by system.giving errors
23 Dec 2016
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/SA/039
iii. Name of Consultant:
Engineers India Limited
iv. Address :
Engineers India Limited, Tower-II, IVth Floor, Sec-16, On NH-8, Gurgaon-122001, Haryana
v. Mobile No.:
9818688520
vi. Landline No.:
911243803508
vii. Email Id:
rb.bhutda@eil.in
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
V
ii. Designation :
Senior Manager
iii. Name of Company(Applicant Name should not be given here) :
BHARAT PETROLEUM CORPORATION LIMITED
iv. Address :
BPCL Mumbai Refinery, Mahul, Chembur
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: