EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/MH/IND2/51174/2016    ii. MoEFCC File No. : J-11011/98/2016- IA II(I)    iii.Short narrative of the project: Installation of Gasoline Hydrotreatment Unit (GTU) and associated facilities to produce 100% BS-VI MS    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : BHARAT PETROLEUM CORPORATION LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.MaharashtraMumbai (Suburban)Kurla
2.MaharashtraMumbai (Suburban)Kurla
 
   vii.Date of TOR Granted 15 Jul 2016 viii.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 22 Oct 2016 x.Project Type: New
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 25 Sep 2012   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: 1) Public Hearing has been exempted as per TOR. MOM of last Public Hearing conducted has been attached for reference. 2) Annexure and Appendix are not be uploaded due to size limitation.
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAthe Committee sought the following additional information: 1. Revised water balance chart w.r.t. existing and proposed water requirement with special emphasis on water recycling and reuse. 2. Fresh water requirement shall be based on quantity of treated effluent sent by M/s RCF for consumption in Refinery. Realistic figure of fresh water should be worked out with MoU signed between M/s RCF and M/s BPCL. 3. Five year plan at the rate of 2% of project cost under CSR activities. The above information may be up uploaded through online on Ministry website 07 Dec 2016
2. ADS Letterloaded water balance, other file for MOU with RCF Fresh water requirement, Five year ESR activities plan is not being loaded by system.giving errors 23 Dec 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/SA/039    iii. Name of Consultant: Engineers India Limited   iv. Address : Engineers India Limited, Tower-II, IVth Floor, Sec-16, On NH-8, Gurgaon-122001, Haryana   v. Mobile No.: 9818688520   vi. Landline No.: 911243803508   vii. Email Id: rb.bhutda@eil.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : V    ii. Designation : Senior Manager    iii. Name of Company(Applicant Name should not be given here) : BHARAT PETROLEUM CORPORATION LIMITED    iv. Address : BPCL Mumbai Refinery, Mahul, Chembur v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL