i. Proposal No. :
IA/JH/IND/25333/2014
ii. MoEFCC File No. :
J-11011/327/2014-IA-II(I)
iii.Short narrative of the project:
Addition of a 2.0 Mtpa Pellet plant and 7m tall top charged Coke oven battery to Bokaro Steel Plant of 0.768 MTPA production capacity.
iv. Project Sector :
Industrial Projects-1
v. Company/Proponent :
SAIL/BOKARO STEEL PLANT
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Jharkhand
Bokaro
Chas
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
NIL
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
31 Dec 2014
x.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
18 Oct 2016
x.Project Type:
Modernization
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
19 Aug 2015
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
None
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
After detailed deliberation, it has been observed by the Committee that the issues raised during the Public hearing, quantitative assessment of pollution, air pollution in the colony, details of sewage treatment plant, post project monitoring details etc. are not addressed adequately and compliance report of earlier EC is more than one year old. It was also noted by the committee that there was no senior level representation from the proponent side in the meeting who could give the commitments on behalf of proponent. The PP shall submit following information for further consideration of the proposal: i) Latest certified compliance report of earlier EC by the Regional Office of MoEF&CC shall be submitted. ii) Issues raised during the public hearing along with action plan for addressing i
15 Apr 2017
2.
ADS Letter
With ref. to MoEFCC's letter dated 28 12 2017 regarding additional queries raised by the EAC, the point-wise reply along with Compliance report (attached as BSL's reply of ADS dtd. 28.12.17.pdf) is hereby uploaded for your kind information. The hard copies of the report have already been submitted to your good office via speed post.
03 Feb 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1417/SA 007
iii. Name of Consultant:
MECON Limited
iv. Address :
Vivekananda Path PO. Doranda Dist – Ranchi, Jharkhand - 834002
v. Mobile No.:
9470193793
vi. Landline No.:
06512483287
vii. Email Id:
kspp1955@rediffmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Navin
ii. Designation :
DY. GENERAL MANAGER
iii. Name of Company(Applicant Name should not be given here) :
K.R. MAZUMDER
iv. Address :
ENVIRONMENT CONTROL DEPARTMENT,BOKARO STEEL PLANT
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print