1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/WB/IND2/30027/2015
ii. MoEFCC File No. :
J-11011/221/2015-IA II (I)
iii.Short narrative of the project:
Hindustan Petroleum Corporation Ltd
iv. Project Sector :
Industrial Projects-2
v. Company/Proponent :
Hindustan Petroleum Corporation Limited
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
West Bengal
East Medinipur
Kharagpur - I
vii.Date of TOR Granted
28 Dec 2015
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
16 Jul 2016
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
28 Dec 2015
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
OBTAINED TOR DT: 28.12.2015, NOW APPLYING FOR EC
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
(i) Onsite and Offsite Disaster Management Plan to be submitted. (ii) Detailed plan under ESR to be drawn at the cost of 2.5% of project cost for local development. The proposal was deferred till the desired information is submitted. The above information shall be provided with the uploading of minutes on the website.
04 Nov 2016
2.
ADS Letter
Uploaded ESR Budget and Onsite & offsite plan
05 Nov 2016
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
157
iii. Name of Consultant:
SV enviro Labs & Consultants
iv. Address :
B-1, Block-B, IDA, Autonagar,
v. Mobile No.:
9440338628
vi. Landline No.:
08912755528
vii. Email Id:
kkroy11@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Kalyan Kumar
ii. Designation :
Sr. Manager
iii. Name of Company(Applicant Name should not be given here) :
Hindustan Petroleum Corporation Limited
iv. Address :
LPG Bottling Plant Haldia, Brindaban Chawak PO Box No 6 PO Durgachwak Dist Purba Midnapur Haldia
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL