EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/MH/IND/26226/2014    ii. MoEFCC File No. : J-11011/413/2014-IA II (I)    iii.Short narrative of the project: Mumbai Refinery Expansion Project (MREP)    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : Hindustan Petroleum Corporation Limited
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.MaharashtraMumbai (Suburban)Kurla
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 18 May 2015 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 30 May 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 13 May 2016   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: The EIA report for Mumbai refinery expansion including installation of PRU & CPP revamp project have been consolidated as per TOR issued on 5th April 2016.
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe Committee sought following additional information: i. Variation has been observed in products list reflected in EIA report vis a vis presentation. Comparison of product in tabular form w.r.t. existing and proposed expansion to be given properly. ii. Reasons for high baseline value of PM10 to be given. iii. 1 Month VOC data to be submitted iv. Water balance chart of the existing and proposed unit to be furnished properly. v. Issues raised during public hearing and commitments made by the project proponent in the form of tabular chart with financial budget for complying with the commitments made. vi. Year wise detailed plan to be redrawn upto 2.5% of project cost out of the issues emerged from public consultation. vii. Detailed traffic management plan to be drawn. viii 24 Sep 2016
2. ADS LetterWe are uploading the additional information sought by Expert Appraisal Committee. Please consider our proposal in the forthcoming meeting of EAC (Industry-II). 07 Oct 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/1316/SA004    iii. Name of Consultant: Engineers India Limited   iv. Address : Engineers India Limited, Gurgaon   v. Mobile No.: 9818688520   vi. Landline No.: 0124-3802034   vii. Email Id: rb.bhudta@eil.co.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Sunil    ii. Designation : Chief General Manager    iii. Name of Company(Applicant Name should not be given here) : Hindustan Petroleum Corporation Limited    iv. Address : HPCL Mumbai Refinery, P.O. Box no. 18820, B.D. Patil Marg, Chembur v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL