Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Obel Agro Industries Private Limited
(b)Name of the Company / Organisation M/S. OBEL AGRO INDUSTRIES PRIVATE LIMITED
(c)Registered Address Sy. No. 133/1, 2, 3, 4, 4A, 4B, 4C & 4E, Tatiparthi Village, Thottambedu Mandal, Tirupati District,,Tirupati,Andhra Pradesh-517642
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Reddeppa Reddy Obulu
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Villa No. 7, Obel Villas, Balagere Road, Varthur, Bangalore,,,Bangalore Urban,Karnataka-560087
(d)Pin code 560087
(e)E-mail obelagro21@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5g(a)-Grain Based distilleries for Ethanol Blended Petrol
Minor Activity
(b)Category B2
   Reason for Applying at Ministry Select
Zero Liqued Discharged Yes
(c)Proposal Number IA/AP/IND2/288638/2022
(d)Master Proposal Number(Single Window) SW/288636/2022
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. No. 133/1, 2, 3, 4, 4A, 4B, 4C, 4D & 4E, Tatip
(b)Pincode 517642
(c)Bounded Latitudes (North)
From
Degree 13
Minutes 46
Second 21.51
From
Degree 79
Minutes 45
Second 44.92
(d)Bounded Longitudes (East)
From
Degree 13
Minutes 46
Second 21.51
From
Degree 79
Minutes 45
Second 44.92
(e)Survey of India Topo Sheet No. 57 O/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 60
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshChittoorThottambeduTatiparthi Village
6.
Details of Project Configuration/Product:
     6.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ethanol - Grain Based100 KLPD
     6.2.       Product
S. No.Product/Activity (Capacity)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol - Grain Based100Kilo Litre per DayRoad
(2.)By Product - DDGS48OthersTons per DayRoad
(3.)By Product - CO275OthersTons per DayRoad
7.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
7.1.
Details of CTE
(i)Whether CTE obtained ? NA
(ii)Copies of all CTE obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of CTE valid as on date NA
7.2.
Details of Consent to Operate
(iii)Date of Issue 01-01-1900 00:00:00
(iv)Valid Upto 01-01-1900 00:00:00
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
8.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 102
(b) Funds Allocated for Environment Management (Capital) (in Crores) 17.91
(c) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.8
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? -1
    9.        Raw Material / Fuel Profile
S. No.Type Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)
(1.)NewGrain80300Tons per AnnumThrough suppliersRoad70
     10.      Details of Water Requirement
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater20650Copy of Permission LetterPipelineOthersBore WellApplication under progress25 Aug 2022650
11.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    11.1.       Waste Water Management
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Quantity of Treated water & Resives or Recycle (Kilolitre per Day)Mode of DisposalZLD Plan Letter
(1.)Industrial675700645ZLD Copy of ZLD Plan
    12.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Kilolitre0RoadOthersTo the agencies authorized by APPCB
(2.)Solid WasteOthersDDGS17520Tons100RoadOthersSold as cattle feed directly
(3.)Solid WasteFly Ash10950Tons100RoadOthersBrick Manufacturing Units
13.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source APSPDCL/In house generation
(c)Standby Arrangement (Details of DG Sets) Yes
(d)Stack Height (in m) 7
14.
Land Ownership Pattern:
(a)Forest Land (ha.)
(b)Private Land (ha.) 8.43
(c)Government Land (ha.)
(d)Revenue Land (ha.)
(e)Other Land (ha.)
    Total Land (ha.) 8.43
15.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 6267.7
(b)Waste/Barren Land (ha.) 5443.1
(c)Grazing/ Community Land (ha.) 17488.5
(d)Surface Water Bodies (ha.) 2293.5
(e)Settlements (ha.) 1065.5
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0
    Total (ha.) 32558.3000
16.
Details of Ecological & Environmental Sensitivity : -
    16.1.     Details of Ecological Sensitivity : Select
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
NIL
    16.2.     Details of Environmental Sensitivity : Select
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersWater BodiesTelug Ganga Canal0.35North
(2.)ForestAnjuru Reserve Forest8.25SE
17.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
18.
Forest Land:
Whether any Forest Land involved? No
19.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
20.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.43
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
21.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
22.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
23.
Manpower Requirement:
(a)Permanent Employment 120
(b)Temporary /Contractual Employment 100
(c)Total Manpower 220
(d)No. of working days 365
24.
Green Belt in Ha:
(a)Total Area of Green Belt 2.8
(b)Percentage of Total Project Area 33.21
(c)No. of Plants to be Planted 1200
(d)Funds Allocated for Plantation 1500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    25.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed project will result in growth of the surrounding areas by ancillary development and supporting infrastructure. Special emphasis on Financial and Social benefits will be given to the local people.
   27.   CRZ Specific Details : Not Applicable
   28.   Sector Specific Details : NOT APPLICABLE
   30.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
30.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
31.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
32.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/RA0240
(ii)Name of the EIA Consultant SV ENVIRO LABS & CONSULTANTS
(iii)Address ENVIRO HOUSE, BLOCK-B, B-1, IDA, AUTONAGAR, VISAKHAPATNAM
(iv)Mobile No. 9491215528
(v)Landline No. 0891275552
(vi)Email Id svenviro_labs@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 24 Oct 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
33.
Documents to be Attached:
(a)Uploaded Copy of EMP Report Copy of EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Uploaded Scanned copy of notarized affidavit (self declaration as mentioned in the Notification dated 16.06.2021). Copy of Uploaded Scanned copy of notarized affidavit
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
Uploaded Scanned copy of notarized affidavit (self declaration as mentioned in the Notification dated 16.06.2021). Copy of Uploaded Scanned copy of notarized affidavit
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPl. submit the following information: 1. Fresh water drawl application/NOC. 2. Present land use break up of study area in section 15 of Form-2. 3. Fill section 20 of Form-2. 4. Clarify source of power. If boiler is proposed, please submit AQ modelling report in EMP. 5. Environmental settings of study area inc. highways, rivers etc. 6. Notarized affidavit as per format mentioned in OM dated 16th June, 2021. 7. Copy of Land ownership documents in the name of company or company directors. 8. Copy of Land use conversion documents for industrial use . 15 Aug 2022
2.NAThe correction have been made as per the instruction received 30 Aug 2022
3.NAPl. comply EDS dated 15th August, 2022. 1. Telugu Ganga Canal is at 0.35 km. pl. submit NOC from concerned department. 2. Copy of land use conversion documents/application for industrial use. 3. Document showing that the owner mentioned in land documents submitted is director of the company. 06 Sep 2022
4.NAThe correction have been made as per the instruction received 15 Oct 2022
5.NAPL. comply EDS dated 06.09.2022 regarding NOC of canal from concerned Irrigation department. Kindly submit NOC for nearby canal (0.35 km) from the concerned Irrigation department for consideration. 17 Oct 2022
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantReddeppa Reddy Obulu
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S. OBEL AGRO INDUSTRIES PRIVATE LIMITED
AddressSy. No. 133/1, 2, 3, 4, 4A, 4B, 4C & 4E, Tatiparthi Village, Thottambedu Mandal, Tirupati District
Print